Specification for Building Works

download Specification for Building Works

of 28

description

services

Transcript of Specification for Building Works

  • 5/28/2018 Specification for Building Works

    1/28

    Specification forSpecification for BuildingBuilding

    WorksWorksNurul Hidayah BteYahya

    Siti Fatiah Bt. Ibrahim

    Amirul Naim B. Md Zulkifli

    Afifi Bin BaharomAhmad Fitri Bin Salehuddin

    Ahmad Nazri Bin Harun

    Dahlia Binti Ismail

    1ArchiNation

  • 5/28/2018 Specification for Building Works

    2/28

    What is Specification of Buildings?What is Specification of Buildings?

    From AIA A201-2007,Specifications merely

    that portion of the Contract Documentsconsisting of the written requirements for the materials,equipment, systems, standards and workmanship for theWork and performance of the related services.

    In Contract without Quantities it is important becauseto list the exact specification and quantities for thebuilding.

    In the Contract with Quantities, it is an additiondocuments for bill of quantities. The B/Q has alreadyincluded everything that affects the price.

    2ArchiNation

  • 5/28/2018 Specification for Building Works

    3/28

    Specifications should generally describe theSpecifications should generally describe the following :following :

    Type and thequality of every

    product

    Quality ofworkmanship

    Administrationsof the contract for

    construction

    Requirement offabrication, erection

    and application,installation and

    finishing

    Componentsdimensional

    Allowances andunit prices inthe contract.

    Productalternates and

    options

    3ArchiNation

  • 5/28/2018 Specification for Building Works

    4/28

    Users of theUsers of the specification.specification.

    1. Building Contractor, Estimators and his Site Agent

    To be read by the Contractors Estimator as the onlyinformation available to help prepare the competitivetender.

    Estimators will take their own measurements of thework from the drawings and build up their estimatesrelying on the specifications for a full description ofquality, materials and workmanship.

    The specification must be specific and crystal clear andcomplete in detail to protect he client from unwantedclaims or uncertainty.

    4ArchiNation

  • 5/28/2018 Specification for Building Works

    5/28

    2. The Architect, his Resident Architect and his Clerk-of-Work

    The Architect should use the Drawing and Specifications to

    ensure compliance with code requirements.

    Plan checkers need to readily see compliance with applicable

    codes.

    The Resident Architect need to supervise the indications

    activities for quality ensures. The clerk-of-work need to inspect on behalf of the employer,

    since the constant inspection will be necessary and the

    architect is not expected to be continuously on the site.

    5ArchiNation

  • 5/28/2018 Specification for Building Works

    6/28

    3. The Quantity Surveyor

    The Quantity Surveyor need to be able prepares the bill of

    quantities as a basis for such competitive tenders.

    The Quantity Surveyor may need to prepare the bill and

    instructions accordingly given by the architect as complete as

    those required by the Contractors when taking their ownmeasurements and these instructions are conveyed in a

    specifications.

    6ArchiNation

  • 5/28/2018 Specification for Building Works

    7/28

    SPECIFICATION PRINCIPLE

    What can be shown on drawings should be drawn. The

    rest should be scheduled and specified

    The specification should not duplicate the drawings

    REQUIREMENTS OF A GOOD

    SPECIFICATION

    Specifications should generally describe the type and

    quantity of every product in the work, quality of

    workmanship, requirements for fabrication, component

    dimensional, and specific description of product.

    7ArchiNation

  • 5/28/2018 Specification for Building Works

    8/28

    1. It should be correctly

    formatted

    2. Use proper

    specification language

    REQUIREMENTS OF A GOOD SPECIFICATION

    3. Should be consistent

    and complete

    4. Use universally

    accepted terms

    8ArchiNation

  • 5/28/2018 Specification for Building Works

    9/28

    Qualities of the specificationQualities of the specificationThe specification writer should

    Be familiar with all types and classes ofworks

    Understand the building process and trade

    operations Be design conscious

    9ArchiNation

  • 5/28/2018 Specification for Building Works

    10/28

    Have considerable site supervision

    experience. Be generally familiar with the

    construction industr .

    Be knowledgeable in Contract Law,

    Building Contraction, materials and

    fittings, site operation, etc

    10ArchiNation

  • 5/28/2018 Specification for Building Works

    11/28

    Parts of a SpecificationParts of a Specification1. The Preliminaries

    Contains a series of preliminaryclauses corresponding to the

    Preliminar Bill in a bill of uantities.

    The clauses set out all items of general

    application not covered by the

    Conditions of Contract. They must notover-ride the Conditions of Contract.

    11ArchiNation

  • 5/28/2018 Specification for Building Works

    12/28

    Parts of a SpecificationParts of a Specification2. The Works Description Section

    Each subject should form a separateparagraph with marginal heading

    be in the form of Schedules such as for

    finishes, paintings, windows, doors,

    ironmongery etc.

    12ArchiNation

  • 5/28/2018 Specification for Building Works

    13/28

    For works to be carried out by the

    specialist sub-contractors, specifying byprime cost sum is necessary.

    For works t e and uantit that

    cannot be determined at the time oftender specifying by provisional sum

    is necessary.

    13ArchiNation

  • 5/28/2018 Specification for Building Works

    14/28

    H)Formatting the specificationH)Formatting the specification1) Using Trade Format: arrange the specs

    accordingly to sequence of work.2) Using Elemental Format: works are

    s ecified accordin to elements or

    rooms rather than trade.

    3) marginal headings of clauses are

    necessary for ease of reference

    14ArchiNation

  • 5/28/2018 Specification for Building Works

    15/28

    I)Methods Of Preparing theI)Methods Of Preparing the

    SpecificationSpecificationi. To start everything afresh- arduous task & seldom

    done.

    ii. To use an old specification as a reference model-using old specification for similar project as a base

    iii. To use a standard specification- standards ecification containin standard clauses on

    information and works that most buildings of aparticular organization would require isprepared.(exp:JKR)

    iv. To use library of standard clauses- standard and

    tersely worded clauses applicable to most types ofworks are prepared.exp: N.B.S (UK). Malaysia donot have such a specification

    15ArchiNation

  • 5/28/2018 Specification for Building Works

    16/28

    ScopeScope Procument using Specification and

    Drawing in Building Contract withoutQuantities

    The Advanta es

    The Disadvantages

    Consequences of not having a complete

    and comprehensive Tender Drawing andBuilding Specification

    16ArchiNation

  • 5/28/2018 Specification for Building Works

    17/28

    ProcumentProcument using Specification and Drawing inusing Specification and Drawing in

    Building Contract without QuantitiesBuilding Contract without Quantities

    Under this option the contractor is selected and

    appointed on the basis of a lump sum bid provided in

    response to a detailed Specification and Drawing.

    Appropriate for small projects such as house extensions

    and renovations because all Tenderers need to produce

    their own quantities and also the time involved inachieving a sufficiency of the design.

    Not particularly appropriate where it is likely that

    change will be required by the Employer after the

    contract has been started due to the fact that there areno competitive rates under which variation values can

    be assessed.

    17ArchiNation

  • 5/28/2018 Specification for Building Works

    18/28

    The AdvantagesThe Advantages The lump sum price is firm, subject only

    to variations which may be instructedduring the course of the Contract Works.

    Client risk in res ect of errors in a Bill of

    Quantities is avoided because theContractor prepares his own

    measurement and quantities.

    Can incorporate Design and Build and

    Performance Specified works if required.

    18ArchiNation

  • 5/28/2018 Specification for Building Works

    19/28

    The DisadvantagesThe Disadvantages The design must be well advanced in order to

    prepare the detailed Specification documents. This

    procurement route can therefore mean a later sitestart that with alternative procurement routes.

    Give less control of cost when variations areinstructed than firm Bills of Quantities because the

    ac o a e ne system o measurement o t ebuilding elements.

    Tenders are not as easily comparable to each other asis possible with Bills of Quantities because thetendering contractors may interpret and price risk inthe Specification document in different ways.

    19ArchiNation

  • 5/28/2018 Specification for Building Works

    20/28

    Consequences of not having a complete and comprehensiveConsequences of not having a complete and comprehensive

    Tender Drawing and Building SpecificationTender Drawing and Building Specification

    Measurements and quantities are inserted

    into Tender Contract to enable thetenderers to price the work.

    If an of the Tender Drawin and Buildin

    Specification is not been given, Tenderershave no guidance for determine the

    budget of the project.

    20ArchiNation

  • 5/28/2018 Specification for Building Works

    21/28

    JKR STANDARDJKR STANDARD

    SPECIFICATIONSPECIFICATION21ArchiNation

  • 5/28/2018 Specification for Building Works

    22/28

    Standard specifications for building works 2005 booklet ispublished by Jabatan Kerja Raya (JKR) for the use in

    conducting the project by the government and non

    government.

    It is an important component in construction phase. Act as a

    guide for the contractor precisely follow the specification that

    has been set in Tender Document.

    If the contractor fails to comply with the requirement stated,

    the materials shall be rejected and disciplinary action will be

    taken.

    22ArchiNation

  • 5/28/2018 Specification for Building Works

    23/28

    LINK FOR THE BOOKLET:

    http://www.jkr.gov.my/page/128

    23ArchiNation

  • 5/28/2018 Specification for Building Works

    24/28

    FRONT COVER OF THEBOOKLET

    24ArchiNation

  • 5/28/2018 Specification for Building Works

    25/28

    COMPONENTS IN STANDARDCOMPONENTS IN STANDARD

    SPECIFICATIONSSPECIFICATIONS

    AA PRELIMINARIES AND GENERALPRELIMINARIES AND GENERAL

    CONDITIONSCONDITIONS

    BB PILING WORK PILING WORK

    CC EXCAVATION AND EARTHWORKSEXCAVATION AND EARTHWORKS

    DD CONCRETE WORK CONCRETE WORK

    EE BRICKWORK BRICKWORK

    FF SOIL DRAINAGESOIL DRAINAGE

    GG ROOFING WORK ROOFING WORK

    HH CARPENTRY , JOINERY ANDCARPENTRY , JOINERY ANDIRONMONGERYIRONMONGERY

    WORKWORK

    II STRUCTURAL STEEL AND METALSTRUCTURAL STEEL AND METAL

    WORKSWORKS

    JJ PLASTERING, PAVING AND TILINGPLASTERING, PAVING AND TILING

    WORKSWORKSKK WATER SUPPLY PLUMBING,WATER SUPPLY PLUMBING,

    SANITARY ANDSANITARY AND

    RAINWATER GOODS INSTALLATIONRAINWATER GOODS INSTALLATION

    LL GLAZING WORK GLAZING WORK

    MM PAINTING WORK PAINTING WORK

    NN EXTERNAL WORKEXTERNAL WORK

    25ArchiNation

  • 5/28/2018 Specification for Building Works

    26/28

    26ArchiNation

  • 5/28/2018 Specification for Building Works

    27/28

    27ArchiNation

  • 5/28/2018 Specification for Building Works

    28/28

    28ArchiNation