SPECIALIST SERVICES, Fuels and MechanicalDEFENCE ESTATESMinistry of Defence
Specification 47
Building energymanagement systems
Defence Estates is an Agency of the MODMINISTRY OF DEFENCE
Specification 47
Building energymanagement systems
Building Energy Management SystemsSpecification 47
September 2002ii
Crown Copyright 2002
This document iscatalogued in the DETechnical PublicationsIndex under the followingkeywords:
Building energy management systems
Building Energy Management SystemsSpecification 47
September 2002 iii
Foreword
1. This Specification is one of a series prepared by Defence Estates (DE)primarily for use in its contracts for mechanical and electricalengineering works. The Specification covers the installation of buildingenergy management systems (BEMS). It is a revision of the formerStandard Specification (M&E) No. 15, dated 1986.
2. When this Specification is used in connection with a Defence contractthen it is to be read in conjunction with such further documents settingout contractual requirements particular to the contract.
3. Whilst this Specification was commissioned by DE for use on Ministry ofDefence (MOD) contracts, it is acknowledged that it could be usefullyapplied to other contracts. DE commend its use to other Governmentdepartments. It may, therefore, be used outside the MOD estate. However, no warranty is given as to the accuracy of this Specification orits fitness for any purpose.
4. This Specification has been devised for the use of the Crown and itscontractors in the execution of contracts for the Crown. The Crownhereby excludes all liability (other than liability for death or personalinjury) whatsoever and howsoever arising (including, but withoutlimitation, negligence on the part of the Crown, its servants or agents)for any loss or damage however caused where the specification is used forany other purpose.
Building Energy Management SystemsSpecification 47
September 2002iv
Building Energy Management SystemsSpecification 47
September 2002 v
Acknowledgements
This specification has been compiled by consulting engineers Ove Arup &Partners.
The authors would like to record their gratitude to the staff at seven siteswithin the MOD Estate for their time and co-operation in researching thestudy. The sites were:
R N Ensleigh, Bath
RNAS Yeovilton
RAF Brampton
RAC Centre Bovington, Wareham
RAS Blandford
RAF Coningsby
Defence Procurement Agency, Abbey Wood, Bristol
Gratitude is also extended to the Building Services Research and InformationAssociation (BSRIA) whose published guidance has been used in theproduction of this document.
CONTACT FOR QUERIES
Specialist Services, Fuels and MechanicalDefence EstatesBlakemore DriveSutton ColdfieldWest Midlands B75 7RL
Tel: 0121 311 2294
Building Energy Management SystemsSpecification 47
September 2002vi
Building Energy Management SystemsSpecification 47
September 2002 vii
Abbreviations
ADC - Analogue to Digital Conversion
BEMS - Building Energy Management System
BS - British Standards
CDM - Construction (Design and Management) Regulations
CPU - Central Processing Unit
DAC - Digital to Analogue Conversion
DDC - Direct Digital Control
EDI - Electronic Data Interchange
EMS - Energy Management Systems
FCU - Fan Coil Unit
HVAC - Heating, Ventilation and Air Conditioning
HVCA - Heating and Ventilating Contractors Association
I/O - Input/Output
ISDN - Integrated Services Digital Network
IT - Information Technology
LAN - Local Area Network
M&T - Monitoring and Targeting
MCC - Motor Control Centre
OEM - Original Equipment Manufacturer
PABX - Private Automatic Branch Exchange
PIR - Passive Infra Red
PM - Project Manager
PPM - Planned Preventive Maintenance
PROM - Programmable Read Only Memory
PSTN - Public Switched Telephone Network
RAM - Random Access Memory
RCD - Residual Current Device
ROM - Read Only Memory
SCS - Structured Cabling System
UC - Unitary Controller
UPS - Uninterruptible Power Supply
VAV - Variable Air Volume
VDU - Visual Display Unit
VFC - Volt Free Contact
VGA - Video Graphics Array (A colour graphics displayspecification)
Building Energy Management SystemsSpecification 47
September 2002viii
WAN - Wide Area Network
Building Energy Management SystemsSpecification 47
September 2002 ix
Building Energy Management SystemsSpecification 47
September 2002x
Contents
PageFOREWORD iiiACKNOWLEDGEMENTS vABBREVIATIONS viiCONTENTS ix
1 SECTION 1 - GENERAL REQUIREMENTS
1.11.21.31.41.51.61.71.81.91.101.111.121.131.141.151.16
SCOPETERMINOLOGYDEFINITIONSRELATED DOCUMENTSPROVEN PERFORMANCESTANDARDSREGULATIONSELECTROMAGNETIC COMPATIBILITYDRAWINGSOPERATING AND MAINTENANCE DOCUMENTSELECTRICITY SUPPLYELECTRICAL EQUIPMENT AND WIRINGSTORAGE AND PROTECTIONRATIONALISATION OF SUPPLIESSAMPLESSCHEDULES
1112222334555555
2 SECTION TWO - SYSTEM
2.12.22.32.42.52.62.7
SCOPEGENERALOPERATOR STATIONCONTROLLERSCONTROLLER PROGRAMMINGCOMMUNICATIONSCONTROLS
77815192426
3 SECTION THREE - INSTALLATION
3.13.23.3
SCOPEGENERALFIXING AND CONNECTION
333334
Building Energy Management SystemsSpecification 47
September 2002 xi
4 SECTION FOUR - TRAINING
4.14.24.34.44.5
PROVISIONDEFECTS LIABILITY PERIODTESTING AND INSPECTION OF SENSORS AND ACTUATORSSOFTWARE PROGRAMMINGMANUALS
4141414141
5 SECTION FIVE - TESTING AND COMMISSIONING
5.15.25.35.45.55.6
GENERALOPERATION OF BUILDING SERVICES PLANTWORKS STANDARDSAPPROVAL OF STANDARDSTESTING AND WITNESSING OF SOFTWARECOMMISSIONING
434343444444
6 SECTION SIX - ACCEPTANCE TESTING AND HANDOVER OF THEINSTALLED SYSTEM
6.16.26.36.4
CONTRACTOR TESTSRADIO TRANSMITTERSCALIBRATION OF INSTRUMENTSFULLY OPERATIONAL SYSTEM
45454545
7 SECTION SEVEN - PERFORMANCE TESTS
7.17.27.3
GENERALDEFECTS AND WARRANTIESPROCEDURE
474747
8 SECTION EIGHT - MAINTENANCE AND SPARES
8.18.2
SPARESMAINTENANCE
4949
ANNEX A - ESCROW AGREEMENT A1
ANNEX B - GLOSSARY OF TERMS B1
ANNEX C - MNEMONIC TAGS FOR PLANT EQUIPMENT AND IDENTIFICATION C1
SCHEDULE NO 1 : INFORMATION FOR THE TENDERER Schedule 1
SCHEDULE NO 2 : INFORMATION TO BE SUPPLIED BY TENDERER Schedule 2
Building Energy Management SystemsSpecification 47
September 2002 1
1 Section One - General Requirements
1.1 SCOPE
1.1.1 This Specification details thedesign and other requirements for buildingenergy management systems (BEMS).
1.1.2 The BEMS shall comprisepersonal computer-based operators station(s),printer(s) and other peripherals, controllersand intelligent unitary controllers, software,sensors and instrumentation necessary tomeet the intent of the Particular Specification.
1.1.3 The BEMS shall provide controland monitoring for the plant and systemfunctions as described in the ParticularSpecification.
1.1.4 The system shall be capable ofbeing addressed by all installed operatorstations simultaneously and one portableadditional operator station.
1.1.5 Unless otherwise indicated, thework shall include design, manufacture, workstesting, supply, delivery to site, installation,site testing, commissioning, making good anydefects that occur during the defect liabilityperiod, provision of As Installed drawings andOperation and Maintenance documents, thewhole of the labour and all materials necessaryto form a complete installation (whether or notall the necessary components are indicated).The work will also include any Scope of Workforming part of a Particular Specificationattached to the Contract.
1.1.6 Where indicated, the work shallinclude comprehensive planned preventivemaintenance for a period of 12 monthsfollowing acceptance of the completedinstallation.
1.1.7 Unless otherwise indicated, allequipment and materials to be installed shallbe new.
1.1.8 The Contractor shall ensure that allequipment can be installed in the allotted spaceand shall maintain adequate access formaintenance and repair, in accordance withDMG08 Space Requirements for Plant Access,Operation and Maintenance.
1.1.9 All equipment shall be installed inaccordance with the manufacturers writteninstructions.
1.2 TERMINOLOGY
1.2.1 Building Energy ManagementSystem (BEMS) is a generic term used to describecomputer based control systems for engineeringservices. Other titles used for such equipment areBuilding Management Systems (BMS) and EnergyManagement Systems (EMS). The term BuildingEnergy Management System (BEMS) has beenidentified as the normal acronym for such systemsand adopted throughout this Specification. Otherterms are synonymous with this.
1.3 DEFINITIONS
1.3.1 Project Manager (PM) shall mean anofficial of the MOD or commercial representativeresponsible for the purpose of management andadministration of the works covered within thisSpecification.
1.3.2 Where the work is to be undertakenas a sub-contract, Contractor shall mean Sub-contractor.
1.3.3 Indicated as used in as indicated, where indicated, unless otherwise indicated andlike phrases shall mean indicated in Schedule No.1 of this Specification or in the other documentslisted in the invitation to tender.
1.3.4 Approval (and words derivedtherefrom) means approval in writing by the PM,unless state