  • SPECIALIST SERVICES, Fuels and MechanicalDEFENCE ESTATESMinistry of Defence

    Specification 47

    Building energymanagement systems

  • Defence Estates is an Agency of the MODMINISTRY OF DEFENCE

    Specification 47

    Building energymanagement systems

  • Building Energy Management SystemsSpecification 47

    September 2002ii

    Crown Copyright 2002

    This document iscatalogued in the DETechnical PublicationsIndex under the followingkeywords:

    Building energy management systems

  • Building Energy Management SystemsSpecification 47

    September 2002 iii

    Foreword

    1. This Specification is one of a series prepared by Defence Estates (DE)primarily for use in its contracts for mechanical and electricalengineering works. The Specification covers the installation of buildingenergy management systems (BEMS). It is a revision of the formerStandard Specification (M&E) No. 15, dated 1986.

    2. When this Specification is used in connection with a Defence contractthen it is to be read in conjunction with such further documents settingout contractual requirements particular to the contract.

    3. Whilst this Specification was commissioned by DE for use on Ministry ofDefence (MOD) contracts, it is acknowledged that it could be usefullyapplied to other contracts. DE commend its use to other Governmentdepartments. It may, therefore, be used outside the MOD estate. However, no warranty is given as to the accuracy of this Specification orits fitness for any purpose.

    4. This Specification has been devised for the use of the Crown and itscontractors in the execution of contracts for the Crown. The Crownhereby excludes all liability (other than liability for death or personalinjury) whatsoever and howsoever arising (including, but withoutlimitation, negligence on the part of the Crown, its servants or agents)for any loss or damage however caused where the specification is used forany other purpose.

  • Building Energy Management SystemsSpecification 47

    September 2002iv

  • Building Energy Management SystemsSpecification 47

    September 2002 v

    Acknowledgements

    This specification has been compiled by consulting engineers Ove Arup &Partners.

    The authors would like to record their gratitude to the staff at seven siteswithin the MOD Estate for their time and co-operation in researching thestudy. The sites were:

    R N Ensleigh, Bath

    RNAS Yeovilton

    RAF Brampton

    RAC Centre Bovington, Wareham

    RAS Blandford

    RAF Coningsby

    Defence Procurement Agency, Abbey Wood, Bristol

    Gratitude is also extended to the Building Services Research and InformationAssociation (BSRIA) whose published guidance has been used in theproduction of this document.

    CONTACT FOR QUERIES

    Specialist Services, Fuels and MechanicalDefence EstatesBlakemore DriveSutton ColdfieldWest Midlands B75 7RL

    Tel: 0121 311 2294

  • Building Energy Management SystemsSpecification 47

    September 2002vi

  • Building Energy Management SystemsSpecification 47

    September 2002 vii

    Abbreviations

    ADC - Analogue to Digital Conversion

    BEMS - Building Energy Management System

    BS - British Standards

    CDM - Construction (Design and Management) Regulations

    CPU - Central Processing Unit

    DAC - Digital to Analogue Conversion

    DDC - Direct Digital Control

    EDI - Electronic Data Interchange

    EMS - Energy Management Systems

    FCU - Fan Coil Unit

    HVAC - Heating, Ventilation and Air Conditioning

    HVCA - Heating and Ventilating Contractors Association

    I/O - Input/Output

    ISDN - Integrated Services Digital Network

    IT - Information Technology

    LAN - Local Area Network

    M&T - Monitoring and Targeting

    MCC - Motor Control Centre

    OEM - Original Equipment Manufacturer

    PABX - Private Automatic Branch Exchange

    PIR - Passive Infra Red

    PM - Project Manager

    PPM - Planned Preventive Maintenance

    PROM - Programmable Read Only Memory

    PSTN - Public Switched Telephone Network

    RAM - Random Access Memory

    RCD - Residual Current Device

    ROM - Read Only Memory

    SCS - Structured Cabling System

    UC - Unitary Controller

    UPS - Uninterruptible Power Supply

    VAV - Variable Air Volume

    VDU - Visual Display Unit

    VFC - Volt Free Contact

    VGA - Video Graphics Array (A colour graphics displayspecification)

  • Building Energy Management SystemsSpecification 47

    September 2002viii

    WAN - Wide Area Network

  • Building Energy Management SystemsSpecification 47

    September 2002 ix

  • Building Energy Management SystemsSpecification 47

    September 2002x

    Contents

    PageFOREWORD iiiACKNOWLEDGEMENTS vABBREVIATIONS viiCONTENTS ix

    1 SECTION 1 - GENERAL REQUIREMENTS

    1.11.21.31.41.51.61.71.81.91.101.111.121.131.141.151.16

    SCOPETERMINOLOGYDEFINITIONSRELATED DOCUMENTSPROVEN PERFORMANCESTANDARDSREGULATIONSELECTROMAGNETIC COMPATIBILITYDRAWINGSOPERATING AND MAINTENANCE DOCUMENTSELECTRICITY SUPPLYELECTRICAL EQUIPMENT AND WIRINGSTORAGE AND PROTECTIONRATIONALISATION OF SUPPLIESSAMPLESSCHEDULES

    1112222334555555

    2 SECTION TWO - SYSTEM

    2.12.22.32.42.52.62.7

    SCOPEGENERALOPERATOR STATIONCONTROLLERSCONTROLLER PROGRAMMINGCOMMUNICATIONSCONTROLS

    77815192426

    3 SECTION THREE - INSTALLATION

    3.13.23.3

    SCOPEGENERALFIXING AND CONNECTION

    333334

  • Building Energy Management SystemsSpecification 47

    September 2002 xi

    4 SECTION FOUR - TRAINING

    4.14.24.34.44.5

    PROVISIONDEFECTS LIABILITY PERIODTESTING AND INSPECTION OF SENSORS AND ACTUATORSSOFTWARE PROGRAMMINGMANUALS

    4141414141

    5 SECTION FIVE - TESTING AND COMMISSIONING

    5.15.25.35.45.55.6

    GENERALOPERATION OF BUILDING SERVICES PLANTWORKS STANDARDSAPPROVAL OF STANDARDSTESTING AND WITNESSING OF SOFTWARECOMMISSIONING

    434343444444

    6 SECTION SIX - ACCEPTANCE TESTING AND HANDOVER OF THEINSTALLED SYSTEM

    6.16.26.36.4

    CONTRACTOR TESTSRADIO TRANSMITTERSCALIBRATION OF INSTRUMENTSFULLY OPERATIONAL SYSTEM

    45454545

    7 SECTION SEVEN - PERFORMANCE TESTS

    7.17.27.3

    GENERALDEFECTS AND WARRANTIESPROCEDURE

    474747

    8 SECTION EIGHT - MAINTENANCE AND SPARES

    8.18.2

    SPARESMAINTENANCE

    4949

    ANNEX A - ESCROW AGREEMENT A1

    ANNEX B - GLOSSARY OF TERMS B1

    ANNEX C - MNEMONIC TAGS FOR PLANT EQUIPMENT AND IDENTIFICATION C1

    SCHEDULE NO 1 : INFORMATION FOR THE TENDERER Schedule 1

    SCHEDULE NO 2 : INFORMATION TO BE SUPPLIED BY TENDERER Schedule 2

  • Building Energy Management SystemsSpecification 47

    September 2002 1

    1 Section One - General Requirements

    1.1 SCOPE

    1.1.1 This Specification details thedesign and other requirements for buildingenergy management systems (BEMS).

    1.1.2 The BEMS shall comprisepersonal computer-based operators station(s),printer(s) and other peripherals, controllersand intelligent unitary controllers, software,sensors and instrumentation necessary tomeet the intent of the Particular Specification.

    1.1.3 The BEMS shall provide controland monitoring for the plant and systemfunctions as described in the ParticularSpecification.

    1.1.4 The system shall be capable ofbeing addressed by all installed operatorstations simultaneously and one portableadditional operator station.

    1.1.5 Unless otherwise indicated, thework shall include design, manufacture, workstesting, supply, delivery to site, installation,site testing, commissioning, making good anydefects that occur during the defect liabilityperiod, provision of As Installed drawings andOperation and Maintenance documents, thewhole of the labour and all materials necessaryto form a complete installation (whether or notall the necessary components are indicated).The work will also include any Scope of Workforming part of a Particular Specificationattached to the Contract.

    1.1.6 Where indicated, the work shallinclude comprehensive planned preventivemaintenance for a period of 12 monthsfollowing acceptance of the completedinstallation.

    1.1.7 Unless otherwise indicated, allequipment and materials to be installed shallbe new.

    1.1.8 The Contractor shall ensure that allequipment can be installed in the allotted spaceand shall maintain adequate access formaintenance and repair, in accordance withDMG08 Space Requirements for Plant Access,Operation and Maintenance.

    1.1.9 All equipment shall be installed inaccordance with the manufacturers writteninstructions.

    1.2 TERMINOLOGY

    1.2.1 Building Energy ManagementSystem (BEMS) is a generic term used to describecomputer based control systems for engineeringservices. Other titles used for such equipment areBuilding Management Systems (BMS) and EnergyManagement Systems (EMS). The term BuildingEnergy Management System (BEMS) has beenidentified as the normal acronym for such systemsand adopted throughout this Specification. Otherterms are synonymous with this.

    1.3 DEFINITIONS

    1.3.1 Project Manager (PM) shall mean anofficial of the MOD or commercial representativeresponsible for the purpose of management andadministration of the works covered within thisSpecification.

    1.3.2 Where the work is to be undertakenas a sub-contract, Contractor shall mean Sub-contractor.

    1.3.3 Indicated as used in as indicated, where indicated, unless otherwise indicated andlike phrases shall mean indicated in Schedule No.1 of this Specification or in the other documentslisted in the invitation to tender.

    1.3.4 Approval (and words derivedtherefrom) means approval in writing by the PM,unless state