Specialist advice for cultural buildings venues
-
Upload
julies-bicycle -
Category
Environment
-
view
24 -
download
0
Transcript of Specialist advice for cultural buildings venues
WEBINAR STARTING AT 11:00AM
Today’s Topic: How to run a sustainable building for organisations who own and/or manage cultural buildings and venues, including museums
1
Julie’s Bicycle is a registered charity: England and Wales no. 1153441.
Specialist advice: Cultural Buildings and Venues
How to run a sustainable building for organisations who own and/or manage cultural buildings and venues, including
museumsLuke Ramsay and Lucy Latham – Julie’s Bicycle
Webinar Series• Weekly webinars for NPOs, MPMs, MDP lead partners and Bridge
Organisations• Now until May (reporting deadline is May 30th)• http://www.juliesbicycle.com/resources/ace-npos/Webinars-
2014
4
Environmental reporting: the basics 02/04/14
Updating Environmental Policy and Action Plan 02/04/14
Specialist advice: Cultural Buildings and Venues 09/04/14
Specialist advice: Offices 09/04/14
Environmental reporting: the basics 16/04/14
Updating Environmental Policy and Action Plan 16/04/14
Specialist advice: Outdoor Events 23/04/14
Going further: Sustainable Touring 30/04/14
Going further: Sustainable Productions and Exhibitions 30/04/14
Communicating success: how to effectively communicate your initiatives and stories 07/05/14
Staff engagement: planning, engaging, acting and maintaining momentum 14/05/14
Today’s Agenda• Introduction to Julie’s Bicycle • Environmental reporting results from 2012/13• Environmental reporting requirements – a reminder• Timeline • Understanding your impacts • Acting on your impacts• Support and resources• Trouble shooting Q&A
5
3-year partnership with Arts Council England to support major funded organisations – 2012
to 2015
Julie’s Bicycle
Research Networks
ConsultancyResources
Training
Events
Thought Leadership
1. Update your environmental policy and action plan.– Notify us using the IG Tools
2. Collecting data on emissions from energy and water use from April 2013 to March 2014– Submit using the IG Tools
Reporting deadline: 30th May 2014
8
Arts Council Requirements
Timeline
9
Input your 2013/2014 data and
review results
Policy and Action Plan update
Notify JB on your Policy and Action Plan by 30th May
(IG Tools)
Annual submission for Arts Council
England - Portal opens 1st May and
closes 13 June
To do now
• Low-hanging fruit– Switch off campaigns– Reducing night-time usage– Schedule for cleaners– PIR sensors, timer switches– Refining building controls. – Extending deadbands– BMS scheduling– Draft proofing/ roof insulation– Cistern bags
14
• Lighting– LEDs– Tubes: T10 > T8 > T5– PIR sensors, timers
• Heating/ Insulation– Thermostatic mixing valves– Roof, Wall and Pipe insulation– Double/secondary glazing, draft exclusion
• Plant– Upgrading/refreshing filters– BMS– Getting plant serviced annually– Good house keeping/ health check
15
• Optimizer – used in conjunction with timers, they learn how quickly a building takes to warm up and compensate for this in timing
• Boost and advance controls – useful for overriding schedule without having to edit it
• Scheduling performance activity and opening times into heating systems. Times and zones
16
Beyond low-hanging fruit• Renewable Heat incentive
– CHP– Biomass– Solar thermal, Solar thermal-PV
• Feed-in tariff, Solar• Boiler replacement?
– Below 60% efficiency definitely upgrade • BMS diagnosis• LED lighting investment• Plant
– Variable speed drive motors– Re-commissioning– Re-balancing air & water systems– Heat recovery systems – in boiler gas flue or from
auditoriums17
Energy Procurement
• Government Procurement Service– Energy Procurement frameworks– Ring-fence savings for further investments in
efficiency• Get in touch with brokers
– Increasing number offering low-carbon supplies and will be happy to explain their offer
• Green suppliers database– For low-carbon energy suppliers
18
Low-Carbon energy• ‘Green Tariff’ electricity
– Increases market demand for greener energy and pushes big 6 to meet their legal obligation to source an increasing proportion of electricity from renewable sources
• 100% renewable energy provider– Good Energy, Ecotricity, Green Energy– They provide 100% renewable energy– Contribute to renewable energy
generation in a more ethical and innovative way
19
Further support• www.juliesbicycle.com/resources/ace-npos/help-guidan
ce• Key resources:
– Energising culture– Energy guide coming soon!
• Email or phone support from Julie’s Bicycle • Further webinars• Practical Guides and Fact sheets• Case studies• IG Tools videos21
Thank you
www.juliesbicycle.com
www.facebook.com/juliesbicycle
www.twitter.com/juliesbicycle
Any questions?
• Reporting deadline 30th May 2014
• Allow 4 – 6 weeks for reporting cycle to take place within
• [email protected]• www.juliesbicycle.com
23