Specialist advice for cultural buildings venues

23
WEBINAR STARTING AT 11:00AM Today’s Topic: How to run a sustainable building for organisations who own and/or manage cultural buildings and venues, including museums Julie’s Bicycle is a registered charity: England and Wales no. 1153441.

Transcript of Specialist advice for cultural buildings venues

WEBINAR STARTING AT 11:00AM

Today’s Topic: How to run a sustainable building for organisations who own and/or manage cultural buildings and venues, including museums

1

Julie’s Bicycle is a registered charity: England and Wales no. 1153441.

Specialist advice: Cultural Buildings and Venues

How to run a sustainable building for organisations who own and/or manage cultural buildings and venues, including

museumsLuke Ramsay and Lucy Latham – Julie’s Bicycle

Housekeeping

3

Webinar Series• Weekly webinars for NPOs, MPMs, MDP lead partners and Bridge

Organisations• Now until May (reporting deadline is May 30th)• http://www.juliesbicycle.com/resources/ace-npos/Webinars-

2014

4

Environmental reporting: the basics 02/04/14

Updating Environmental Policy and Action Plan 02/04/14

Specialist advice: Cultural Buildings and Venues 09/04/14

Specialist advice: Offices 09/04/14

Environmental reporting: the basics 16/04/14

Updating Environmental Policy and Action Plan 16/04/14

Specialist advice: Outdoor Events 23/04/14

Going further: Sustainable Touring 30/04/14

Going further: Sustainable Productions and Exhibitions 30/04/14

Communicating success: how to effectively communicate your initiatives and stories 07/05/14

Staff engagement: planning, engaging, acting and maintaining momentum 14/05/14

Today’s Agenda• Introduction to Julie’s Bicycle • Environmental reporting results from 2012/13• Environmental reporting requirements – a reminder• Timeline • Understanding your impacts • Acting on your impacts• Support and resources• Trouble shooting Q&A

5

3-year partnership with Arts Council England to support major funded organisations – 2012

to 2015

Julie’s Bicycle

Research Networks

ConsultancyResources

Training

Events

Thought Leadership

7

1. Update your environmental policy and action plan.– Notify us using the IG Tools

2. Collecting data on emissions from energy and water use from April 2013 to March 2014– Submit using the IG Tools

Reporting deadline: 30th May 2014

8

Arts Council Requirements

Timeline

9

Input your 2013/2014 data and

review results

Policy and Action Plan update

Notify JB on your Policy and Action Plan by 30th May

(IG Tools)

Annual submission for Arts Council

England - Portal opens 1st May and

closes 13 June

To do now

Environmental Policy and Action Plan: Informing us

Understanding data

11

12

Smart data

13

• Low-hanging fruit– Switch off campaigns– Reducing night-time usage– Schedule for cleaners– PIR sensors, timer switches– Refining building controls. – Extending deadbands– BMS scheduling– Draft proofing/ roof insulation– Cistern bags

14

• Lighting– LEDs– Tubes: T10 > T8 > T5– PIR sensors, timers

• Heating/ Insulation– Thermostatic mixing valves– Roof, Wall and Pipe insulation– Double/secondary glazing, draft exclusion

• Plant– Upgrading/refreshing filters– BMS– Getting plant serviced annually– Good house keeping/ health check

15

• Optimizer – used in conjunction with timers, they learn how quickly a building takes to warm up and compensate for this in timing

• Boost and advance controls – useful for overriding schedule without having to edit it

• Scheduling performance activity and opening times into heating systems. Times and zones

16

Beyond low-hanging fruit• Renewable Heat incentive

– CHP– Biomass– Solar thermal, Solar thermal-PV

• Feed-in tariff, Solar• Boiler replacement?

– Below 60% efficiency definitely upgrade • BMS diagnosis• LED lighting investment• Plant

– Variable speed drive motors– Re-commissioning– Re-balancing air & water systems– Heat recovery systems – in boiler gas flue or from

auditoriums17

Energy Procurement

• Government Procurement Service– Energy Procurement frameworks– Ring-fence savings for further investments in

efficiency• Get in touch with brokers

– Increasing number offering low-carbon supplies and will be happy to explain their offer

• Green suppliers database– For low-carbon energy suppliers

18

Low-Carbon energy• ‘Green Tariff’ electricity

– Increases market demand for greener energy and pushes big 6 to meet their legal obligation to source an increasing proportion of electricity from renewable sources

• 100% renewable energy provider– Good Energy, Ecotricity, Green Energy– They provide 100% renewable energy– Contribute to renewable energy

generation in a more ethical and innovative way

19

www.entrust.org.uk

• Landfill communities fund• £250 - £50,000• Many more local

Further support• www.juliesbicycle.com/resources/ace-npos/help-guidan

ce• Key resources:

– Energising culture– Energy guide coming soon!

• Email or phone support from Julie’s Bicycle • Further webinars• Practical Guides and Fact sheets• Case studies• IG Tools videos21

Any questions?

• Reporting deadline 30th May 2014

• Allow 4 – 6 weeks for reporting cycle to take place within

[email protected]• www.juliesbicycle.com

23