SPECIAL THANKS · 2021. 6. 4. · Measure T1 Infrastructure Bond Measure F (Parks Tax) Contractor...
Transcript of SPECIAL THANKS · 2021. 6. 4. · Measure T1 Infrastructure Bond Measure F (Parks Tax) Contractor...
SPECIAL THANKS
Berkeley City Council
Parks and Waterfront Commission
Public Works Commission
Landmarks Commission
Funding Sources
Measure T1 Infrastructure Bond
Measure F (Parks Tax)
Contractor
Mar Con Builders, Inc. Henry Vila Pariz Nunez
Genaro Santa Cruz
Construction Management
O’Connor Construction Management, Inc. David Hernandez Tim Peel
Filbert Carbajal Wayne Shipman
Design Team
Diana Hayton, ELS Architecture + Urban Design
Vince Taboada, ELS Architecture + Urban Design
City of Berkeley
Project Management Team
Evelyn Chan, Supervising Civil Engineer
Isaac Carnegie, Associate Civil Engineer
Taylor Lancelot, Associate Civil Engineer
Robert Hall, Building Inspector
Improve the safety of the building by providing
Seismic and structural upgrades and ensure a
safe emergency care and shelter facility
Provide a welcoming, clean, and accessible
facility
Reduce energy consumption by updating
mechanical and electrical systems
Interior improvements including new restrooms,
office space, windows, flooring, kitchen appliances
and more
Exterior improvements including new roof, heat
pumps, siding, pathways, benches and more
IMPROVEMENTS
Rendering of Multi-Purpose Room
Renderings provided by ELS Architecture + Urban Design
Jesse Arreguín Mayor
Sophie Hahn Council Member, District 5
SPEAKERS
PROGRAM
RIBBON CUTTING CEREMONY