Special LIBD re 2013 Long Shutdown: MKI’s Contributions by:

5
M.J. Barnes 1 LIBD: 12 April 2011 Special LIBD re 2013 Long Shutdown: MKI’s Contributions by: Laurent Ducimetière and Noel Garrel

description

Special LIBD re 2013 Long Shutdown: MKI’s Contributions by: Laurent Ducimetière and Noel Garrel. MKI Work Foreseen for 2013 Long Shutdown: Group Hydraulic Pipes. Ion Pump: potential interference with 3 rd valve. - PowerPoint PPT Presentation

Transcript of Special LIBD re 2013 Long Shutdown: MKI’s Contributions by:

Page 1: Special  LIBD re  2013  Long Shutdown: MKI’s Contributions by:

M.J. Barnes 1LIBD: 12 April 2011

Special LIBD re 2013 Long Shutdown:

MKI’s

Contributions by: Laurent Ducimetière and Noel Garrel

Page 2: Special  LIBD re  2013  Long Shutdown: MKI’s Contributions by:

M.J. Barnes 2LIBD: 12 April 2011

Hence: move Group Hydraulics pipes away from magnet interconnect B-C to permit use of VPIB pump (no elbow, hence higher pumping speed and allows 3 valves on adjacent MKI tanks).

2 valves

3 valves on Tank

#10

Ion Pump: potential interference with 3rd valve

No deadlines to be met concerning decisions, proto-types, testing, etc ….

MKI Work Foreseen for 2013 Long Shutdown: Group Hydraulic Pipes

Page 3: Special  LIBD re  2013  Long Shutdown: MKI’s Contributions by:

LIBD: 12 April 2011 3

Copper tube: Non-Kicked Beam (NKB)

Ceramic tube with screen conductors: Kicked Beam (KB)

MKI Work Foreseen for 2013 Long Shutdown: Screen Conductors

M.J. Barnes

Investigating adding a “sphere” to end of each screen conductor to reduce voltage stress…..

Prototype/testing: 5 new ceramic tubes ordered – expected ~June 2011. Results of HV tests expected by June 2012 (see also next slide).

Page 4: Special  LIBD re  2013  Long Shutdown: MKI’s Contributions by:

LIBD: 12 April 2011 4

MKI Work Foreseen for 2013 Long Shutdown: Possible Magnet Change(s)…..

M.J. Barnes

One “new” magnet under preparation;

One “spare” magnet (tank #05) removed from MKI2 (B) during Christmas Technical Stop. Magnet to be opened up ….

Parts for 2 new magnets ordered. Delivery of parts expected end of 2011.

One magnet MKI might be replaced during next Christmas Technical Stop… or wait for tests on modified ceramic screen conductors (sphere)...Prototype/testing/Plans:

~80% of parts for a new magnet in stock, other ~20% of parts expected ~Nov. 2011. Magnet to be built and tested with “sphere” on screen conductors (previous slide). Depending on test results (with spheres), other MKI’s may be assembled with new

ceramic tube. Installed MKI’s might, at a future date, therefore have ceramic tube replaced.

Page 5: Special  LIBD re  2013  Long Shutdown: MKI’s Contributions by:

LIBD: 12 April 2011 5

MKI Work Foreseen for 2013 Long Shutdown: Possible Installation of Electron Cloud Coils between MKI’s

M.J. Barnes

Depending upon sources of electron cloud during 2011 operation, Electron Cloud Coils may be required to be installed between MKI’s.

No deadlines to be met concerning decisions, proto-types, testing, etc ….