Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

33
Version 2015/02/09 Daimler Object-No.: Daimler KEM-No.: QEV111AGBSSR R-00036114 Daimler AG Mercedes-Benz ALL RIGHTS RESERVED - Property of Daimler AG - Requirement Specification Draft Mercedes-Benz Genuine Remanufactured Part Urea Pump Module – Air Assisted Page 1 This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of Daimler AG is impermissible. Openly accessible Internal distributioin Confidential Confidential/ structure oriented Requirement Specification Mercedes-Benz Genuine Remanufactured Parts Date: 2015-02-09 Entire vehicle System Module Component KG: 14 Urea Pump Module – Air Assisted Project title Urea Pump Module – Air Assisted Project team GSP/RMT & GSP/RMM Released by: Global Service & Parts Remanufacturing Technology – Remanufacturing Engineering Mr. Torsten Bürger Dept. GSP/RMT Phone: +49 711 17 e-mail: [email protected] Date: Document w/o Signature. Released in Daimler Truck Documentation System. Released by: Global Service & Parts Remanufacturing Technology – Marketing & Sales Mr. Christoph Hofmann Dept. GSP/RMM Phone: +49 711 17 e-mail: [email protected] Date: Document w/o Signature. Released in Daimler Truck Documentation System.

Transcript of Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Page 1: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 1

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

� Openly accessible

� Internal distributioin

���� Confidential

� Confidential/

structure oriented

Requirement

Specification

Mercedes-Benz Genuine

Remanufactured Parts

Date: 2015-02-09

Entire vehicle ���� System ���� Module ���� Component ���� KG: 14

Urea Pump Module – Air Assisted

Project title

Urea Pump Module – Air Assisted

Project team

GSP/RMT & GSP/RMM

Released by: Global Service & Parts Remanufacturing Technology –

Remanufacturing Engineering

Mr. Torsten Bürger

Dept. GSP/RMT

Phone: +49 711 17

e-mail: [email protected]

Date:

Document w/o Signature. Released in Daimler Truck Documentation System.

Released by: Global Service & Parts Remanufacturing Technology –

Marketing & Sales

Mr. Christoph Hofmann

Dept. GSP/RMM

Phone: +49 711 17

e-mail: [email protected]

Date:

Document w/o Signature. Released in Daimler Truck Documentation System.

Page 2: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 2

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Opportunities for intervention by Daimler AG

The Daimler AG project managers have the right to intervene into and peruse these documents, which are

specially drawn up for Daimler.

Preface:

Proposals regarding detailed solutions on the part of a potential contractor are expressly desired. Particularly if

these serve as distinguishing features in comparison with competitors and correspond to the buyers' interests.

The integration of such solutions must be achievable within the framework of the cost target and scheduling.

The contractor is obliged to carry out his service using experienced and qualified personnel.

If additional companies are engaged as development partners/sub-suppliers, Daimler AG must be notified of

this.

Within the framework of this concept competition, the potential contractor must establish technical

specifications.

Should, contrary to expectation, different requirements be defined for a particular function or characteristic in

these requirement specifications, the more demanding requirement applies in all cases.

The technical specification must reflect the structure of the requirement specification. Deviations from the

requirements stated in this requirement specification must be explicitly identified in writing in the technical

specification. If deviations are not identified, the stipulations contained in this requirement specification take

precedence.

This requirement specification and the technical specification (supplier) form parts of the agreement as

technical appendices.

In the event of questions regarding the content of this requirement specification, please contact the author or

the authoring department.

Secrecy:

The results which have been generated may only be published or passed on to third parties with the approval of

Daimler AG. The contractor must oblige both his employees and any subcontractors to adhere to these

regulations. The contractor is also obliged to adhere to Point 5 of the purchasing conditions pertaining to

production material and spare parts for motor vehicles. Further details are regulated by a separate secrecy

agreement.

Blocking note:

All versions, data and contents of this requirement specification must be treated in strict confidentiality and

may not be put to further use or made accessible to third parties without the written approval of Daimler AG.

Reprinting and copying, including excerpts, are not permitted. This blocking note applies unreservedly.

Page 3: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 3

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Changes:

The partner is obliged to inform Daimler AG in advance in the event of all planned changes to products and

process procedures. Changes that effect the herewith defined product characteristics may only be carried out

following written approval by Daimler.

Change documentation of the requirement specification No. Description of update KEM Date Name Release

01 First release - Draft R-00036114 06.08.14 GSP/RMM(T) 001

02 Technical Updates R-00036114 09.02.15 GSP/RMT 002

03

04

05

Reference Documents:

Follong documents are fundamental for this requirement specification:

Reference documents of the requirement specification No. Description Document No. Date Name

01 Drawing – LU Urea pump module 09150861b

A 000 140 15 78

22.02.12 Cummins.

Emission Solution

02 Drawing – LU Urea pump module 09150358f

A 000 140 04 78

26.04.07 Hydraulik Ring

Automobiltechnik

03 Drawing – LU Urea pump module 09150461d

A 000 140 05 78

28.04.11 Hilite International

04 Drawing – LU Urea pump module 09150848c

A 000 140 27 78

22.06.11 Cummins.

Emission Solution

05

Page 4: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 4

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Table of contents

1 General 6

1.1 Brief description of the main function 6

1.2 Order and initial situation 9

1.2.1 Benefit to the customer 9

1.2.2 Markets and Customers 9

1.2.3 Scope of part numbers 9

2 Project Environment 10

2.1 Project Organization 10

2.2 Deadlines/Milestones 11

2.3 Planned unit numbers 12

2.3.1 Sample Parts 12

2.3.2 Series Parts 12

2.4 Duration contract 12

3 General Requirements 13

3.1 General Information 13

3.2 Costs and Cost-Effectiveness 14

3.3 Tooling Costs 14

3.4 Core Process 14

3.5 Core Acceptance and Infill Strategy 15

3.6 Logistics 16

3.6.1 Core – Return Process 16

3.6.2 Logistic Process – Remanufactured Part 16

3.6.3 Packaging and storage 16

3.7 Warranty 17

3.8 Currency 17

3.9 Documentation and Product Data Management 18

3.10 Quality Management 19

3.10.1 Quality Management 1 – Product Quality 19

3.10.2 Quality Management 2 – Remanufacturing Process Audit 19

3.10.3 Quality Management 3 – Initial Sample Release 19

3.11 Environmental Protection 19

3.12 Labelling 20

3.12.1 General Marking Quality 21

3.12.2 Mercedes-Benz Genuine Part – Standard Labelling 22

3.12.3 Mercedes-Benz Genuine Remanufactured Part – Labelling Requirements 23

Page 5: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 5

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4 Technical Requirements 25

4.1 Remanufacturing Specification 25

4.1.1 General Requirements 25

4.1.2 Component specification 26

4.1.3 General component repair 29

4.1.4 Electric Components Requirements 29

4.2 Miscellaneous 30

4.2.1 General data 30

4.2.2 Tightening – Loosening torque 30

4.2.3 Operating condition 30

4.2.4 IMDS – International Material Data Sheet 30

4.3 Testing and Validation 31

4.3.1 Product Validation 31

4.3.2 Functional Test 31

4.3.3 Endurance Test 32

4.3.4 Vibration Resistance (sinus shake) 32

4.3.5 Temperature Shock Test (with in operation mode) 32

4.3.6 Salt spray test (with urea pump module – air assisted in operation) 32

4.4 Residual requirements 33

Page 6: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 6

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

1 General

1.1 Brief description of the main function

The supply unit is used for pumping a filtered Urea-Flow.

Picture 1: Exemplary Urea-Pump-Module Air Assisted

Page 7: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 7

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Urea Suction Line

Urea Pressure Line

Urea Return Line

Decompression ValveAir Pressure Line

Pressure Reservoir

(Bladder)

Cooling Water

Circuit

Urea Pump

Picture 2: Description Main Components

Page 8: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 8

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Picture 3: Circuit Diagram

Tnguye01
Sticky Note
Compressed Air
Tnguye01
Sticky Note
Suction Side
Tnguye01
Sticky Note
Pressure side
Tnguye01
Highlight
Tnguye01
Highlight
Tnguye01
Sticky Note
returns
Tnguye01
Sticky Note
filling valve
Tnguye01
Sticky Note
bladder
Tnguye01
Sticky Note
Cooling water
Page 9: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 9

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

1.2 Order and initial situation

The target is to collect replaced parts from the market and to remanufacture the parts according to a

defined process. The main process steps are:

• Parts disassembling into individual components

• Component cleaning and refurbishing/ paintwork/repair

• Replacement of Replacement Parts

• Assembling of components

• Final testing

• Labelling

• Packaging

• Shipping

1.2.1 Benefit to the customer

Provide the customer a cost-efficient remanufactured Urea Pump Module – Air Assisted with a reasonable

and adequate quality level.

1.2.2 Markets and Customers

The remanufactured Urea-Pump Module-Air Assisted will be used in all markets in which it is allowed to

mount reman parts.

1.2.3 Scope of part numbers

The requirement specification is valid for following part numbers:

A 000 140 04 78

A 000 140 05 78

A 000 140 15 78 (A 000 140 44 78)

A 000 140 27 78

Page 10: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 10

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

2 Project Environment

2.1 Project Organization

The departments responsible for the AdBlue Pump Module remanufacturing project are comprised as

follows:

As contact partners the following persons are defined:

Designation Name Telephone

Technical Project Lead Christian Medau +49 711 17 61950

Series Development Sebastian Hummel +49 711 17 26281

Purchasing Asuncion Casanovas-Tunze +49 7274 56 3787

Remanufacturing Product Management Marie-Christin Ueberfeldt +49 711 17 62503

Quality Management (Process Audit, Product

Quality, Initial Sample Release)

Luetfi Oektem +49 7274 56 4151

Logistics purchased parts, supplier management Thorsten Reinert +49 7274 56 7146

Remanufacturing Engineering Christian Medau +49 711 17 61 950

Core Logistics Jonatan Schiller +49 6348 6103 717

Service Engineering Martin Stoebener +49 7271 71 5714

Series Quality Management Andre Guenther +49 621 393 5734

Page 11: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 11

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

2.2 Deadlines/Milestones

Designation Date Goal achievement

Project Plan 15.08.2014 Definition of tasks, responsibility and deadlines

Requirement specification 15.08.2014 Release requirement specification.

Request for Quotation 15.08.2014 Provide Requirement Specification to Supplier.

Request for 2nd Quotation 16.02.2015 Provide Requirement Specification to Supplier.

Quotation Review 27.02.2015 Review Quotation with Purchase Dep. and Supplier

Implementation phase @ supplier 02.03.2015 Supplier starts with reman factory planning.

Sample evaluation 1 - 10 weeks

before

audit

Send test samples per each part number including

functional test results. All qualification tests must be

passed successfully. Send sample that covers / fulfils

concept for visual criteria. Results must be described

in a technical report and report has to be submitted to

DAI.

Remanufacturing Process Prepa-

ration for audit

- 8 weeks

before

audit

Prepare supplier audit. Production layout. Operation

steps documentation. Test procedures documenta-

tion.

Sample evaluation 2 - 6 weeks

before

audit

Samples per each part number meet all technical re-

quirements of specification and validation documenta-

tion is available.

Supplier audit - end of

august

2015

Reman process and product audit.

Initial sample report and release within audit Process release.

SOP + 6 Month af-

ter contract, 1

week after

successful

audit.

Product and delivery release.

SOP - 09/2015

Page 12: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 12

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

2.3 Planned unit numbers

2.3.1 Sample Parts

Sample parts are required in the following unit numbers:

Samples for testing and

release:

Each Part number minimum one validation procedure (includes all tests men-

tioned in chapter 4.3.1) for validation of:

- Functionality

- Appearance

- paintwork durability

- labelling durability

- tightening/loosening torque housing

2.3.2 Series Parts

Estimated Reman Volumes per Year (European demand only)

2015 5.700

2016 5.400

2017 5.200

The exact quantity and delivery schedule will be determined by the Global Logistics Center (GLC) in

Germersheim.

2.4 Duration contract

Contract duration of official sales contract is valid.

Page 13: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 13

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3 General Requirements

3.1 General Information

The goal of the remanufacturing technology is to remanufacture and reuse defective, used or non-

functioning Urea-Pump Module-Air Assisted with definded, specified processes.

Not reusable parts must be labelled and declared to Daimler AG and must be sent back to Daimler AG Core

Consolidation Center in Offenbach.

To avoid failures or customer complaints the remanufactured Urea-Pump Module-Air Assisted must meet all

specified technical requirements. Deviations are not acceptable unless statistical data or tests ensured the

functionality and reliability of the part or additional agreements are made.

Urea-Pump Module-Air Assisted which are not listed in this specification have to be handled separately

according to separate agreed specifications.

Page 14: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 14

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.2 Costs and Cost-Effectiveness

Beside qualitative aspects, also the remanufacturing process and incidential costs will be checked by

responsible contact person at Daimler AG Pre-Cost Planning.

3.3 Tooling Costs

Supplier provides all necessary tooling and is therefore owner of all tooling equipment provided by

themselves.

3.4 Core Process

For remanufacturing of air-assisted urea pump module, cores are provided by Daimler AG.

The acquisition of cores depends on delivery order from Global Logistics Center Germersheim and is steered

by Supplier.

The accounting of cores is executed by Daimler AG with a price per unit negotiated with Daimler AG purchas-

ing Department. Daimler AG delivers the cores to Supplier Germany exclusively for remanufacturing purpos-

es for Daimler AG.

The number of cores used for remanufacturing is documented and will be communicated to Core Consolida-

tion Center in Offenbach on a quarterly basis.

Scrapping of cores which cannot be used for remanufacturing will be documented by Supplier. Scrapping

documentation can be claimed by Daimler AG at any time. Daimler AG is allowed to conduct random inspec-

tions.

Page 15: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 15

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.5 Core Acceptance and Infill Strategy

Daimler is responsible for reviewing and approving acceptable core before sending to Supplier Germany

accoring to the core acceptance criteria.

Mercedes-Benz Genuine Remanufactured Parts Standard Core Return Criteria Requirements are binding.

1. Mechanical

2. Assembled/ Disassembled

3. Outer Corrosion

� see Appendix

Supplier is responsible for notifying Daimler if any core received does not meet acceptable core criteria for

remanufacturing.

Daimler receives100 remanufactured finished goods in return for 100 acceptable* cores sent to Supplier

Germany.

*Acceptable is defined by Mercedes-Benz Genuine Remanufactured Parts Standard

Core Return Criteria Requirements.

Page 16: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 16

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.6 Logistics

Unless otherwise expressly agreed, general agreements regarding logistics are included in Mercedes-Benz

Special Terms.

3.6.1 Core – Return Process

In general Core Return Process is defined as follows:

1. Delivery (Back-in Box) via CORS (Dealer � LC/ELC � CCC)

2. Appraisal in Core Consolidation Center

3. Shipping via Supplier Order (Based on Delivery Order from Global Logistics Center Germersheim) to

Supplier Germany � done by Daimler AG

• Shipping from Supplier Germany to remanufacturing plant � done by Supplier (Sufficiently protected

during storage and transportation. (shock-proof, avoid scratches, avoid direct moisture, avoid

damage by crushing or impacts)

3.6.2 Logistic Process – Remanufactured Part

Logistics for remanufactured part analogue to new part:

1. Shipping from remanufacturing plant to Supplier Germany done by Supplier

2. Remanufactured parts must be delivered to Global Logistic Center in Germersheim, analogue

to series parts logistic process

3.6.3 Transportation, Packaging and storage

Remanufactured parts have to be packed according to following criteria:

Transport / safety criteria:

• Sufficiently protected during storage and transportation. (shock-proof, avoid scratches, avoid direct

moisture, avoid damage by crushing or impacts)

• Additionally packed in closed VCI-Bag

Page 17: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 17

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.7 Warranty

General agreements regarding warranty are equal to new part number A0001404478 which is 24 months.

3.8 Currency

The remanufactured UA1 sale price between supplier and Daimler will be in euros, which is analogous to the

New UA1 sales price agreement.

Page 18: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 18

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.9 Documentation and Product Data Management

Supplier has to document all relevant remanufacturing processes and store appropriate data. Supplier has to

commit to Daimler AG to verify correct Remanufacturing processes based on requirement specification, prod-

uct specification, drawings with Verification Tests and calculations. Daimler AG is authorized to have complete

inspection of process data and documentation.

All Cores (Mercedes-Benz Genuine Part and Mercedes-Benz Genuine Remanufactured Part and Mercedes-

Benz Genuine Parts for Recycling Process) have to be documented and labelled according to this requirement

specification and Mercedes-Benz-Norm (MBN).

Specified data have to be transferred via defined processes and data interfaces to Daimler AG if required.

If Data transfer is required, Data Transfer requirements will be specified by Daimler AG.

Page 19: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 19

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.10 Quality Management

Supplier hast to establish quality management system based on minimum standard DIN EN ISO 9001.

Daimler AG is authorized to perform process oriented Supplier Audit to revalue and verify Quality Capability.

Supplier Audit is based on VDA 6.3.

Supplier is obligated to come under regular inspection, to revalue supplier Quality Management System.

Except when otherwise stipulated, Daimler AG is authorized to perform additional Supplier Audit referred to

VDA 6.3.

For long term planning and realization of quality assurance, a quality management plan has to be established.

Daimler AG is authorized to inspect quality management plan. Supplier has to allow Daimler AG to inspect

QM-Plan.

3.10.1 Quality Management 1 – Product Quality

Audit Process Steps, Sample Test Plan, will be provided 10 weeks before audit.

3.10.2 Quality Management 2 – Remanufacturing Process Audit

Audit Process Steps, Sample Test Plan, will be provided 10 weeks before audit.

3.10.3 Quality Management 3 – Initial Sample Release

Audit Process Steps, Sample Test Plan, will be provided 10 weeks before audit.

3.11 Environmental Protection

Binding environmental fields of operation are included in Daimler AG policy.

Page 20: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 20

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.12 Labelling

The marking is to be made – depending on the existing or planned marking system, service life and quality re-

quirements – directly on the component by an inkjet printer, laser or a dot marking machine. In exceptional

cases, i.e., where there is good reason to use alternative marking processes, these are to be approved by

Daimler. Every part that is given a marking is to be presented to Daimler for inspection of code quality and

surface.

Humanly legible marking must be chemically and physically resistant; resistant to mechanical strains arising

during the remanufacturing process, transportation and the processing of common materials; resistant to

temperatures between –40°C … +85°C; and legible by machine for the duration of a vehicle service life of 15

years.

For the traceability of all parts, the supplier must ensure that a link is established between human readable

identification number and its database. The type of link is left to the manufacturer.

When issues with noticeable parts arise, Daimler shall provide the supplier with the data of the component in

question and must receive from the supplier a reply stating which other components named by the human

readable identification number are affected or which individual parts / individual part numbers are installed.

These documents are to be archived and made available on demand at the supplier after the expiration of the

15-year series production.

The respective markings of individual components must not in any way influence the functionality, safety or

established values from the specifications for the components and the overall system for the duration of the

product service life of individual components and the overall system.

Page 21: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 21

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.12.1 General Marking Quality

Readability:

Marking must be readable over specified part life time. 100% biunique identification must be ensured.

Unmarked, incorrectly marked, and unidentifiable deliveries must not be put in circulation. Mirror-inverted

markings are not permitted. Rotation of markings is not permitted without prior coordination and approval.

Symbol quality

(according to ISO/IEC 16022 and AIM)

Quality of markings on

metallic surfaces

Min. 4 (numerical scale)

Min. A (alphanumerical scale)

Page 22: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 22

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.12.2 Mercedes-Benz Genuine Part – Standard Labelling

Following Labelling requirements according to MBN-33015-1 und 33015-2

on Mercedes-Benz Urea Pump Module – Air Assisted is binding:

1. Logo Mercedes-Benz Logo

2. Part Number A XXX 140 XX 78

3. Drawing status ZGS 00X

4. Identification number Ident: XXX XXX XXX XXX

5. Drawing number XXXXXXXXXXXX

Page 23: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 23

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

3.12.3 Mercedes-Benz Genuine Remanufactured Part – Labelling Requirements

Following Labelling requirements according to MBN-33015-1 und 33015-2 are binding:

Following Labelling content on Mercedes-Benz Urea Genuine Remanufactured Part – Urea Pump Module – Air

Assisted is binding:

1. Logo Mercedes-Benz Logo (Mercedes-Benz Star)

2. Part Number A XXX 140 XX 78 80

(All reman parts must be labelled with latest design status � currently A 000 140 15 78 80)

(Part number will be specified during project)

3. Drawing status ZGS 00X

4. Serial number to be defined

5. Supplier Logo

Behind part number, a _ _ 80 number is added to symbolize Mercedes-Benz Genuine Remanufactured Parts.

The “ES1” (means 80) index is appended with a distance of two spaces to the part number.

Following Labelling content on Mercedes-Benz Urea Genuine Remanufactured Part – Urea Pump Module – Air

Assisted are minimum binding:

1. Mercedes-Benz Logo Mercedes-Benz Logo (Mercedes-Benz Star)

6. Part number including _ _ A XXX 140 XX 78 80

2. Serial number to be defined

Labelling Location:

- All labels on plastic housing must be removed completely.

- Labelling for Mercedes-Benz Genuine remanufactured part is recommended to be placed on the

aluminium body.

Additional supplier labelling:

- Additional supplier labelling allowed.

- Supplier labelling must not interfere with labelling requirements specified in chapter 3.12.3.

- Supplier labelling must not influence functionality.

Page 24: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 24

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

Page 25: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 25

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4 Technical Requirements

4.1 Remanufacturing Specification

The objective of remanufacturing technology is to recover, remanufacture and reuse defective parts also

known as core parts. The goal of the remanufacturing technology is to have a high ratio of remanufactured

parts versus the supplied core parts.

Not reusable Urea pump Modules – Air Assisted must be declared to Daimler AG and must be send back.

Investigation on route cause can be made upon specific DAI request.

To avoid failures or customer complaints the remanufactured Urea-Pump Module-Air Assisted must meet all

technical requirements. Deviations are not acceptable unless statistical data or tests ensured the

functionality and reliability of the part.

4.1.1 General Requirements

Ambient Temperature: Tamb = -40°C … + 85°C

Storage Temperature: Tsto = -40°C … + 85°C (max. 90°C only one time for 120min.)

Medium Temperature: Tmed = -40°C … + 65°C (in operation: -10°C … + 65°C)

Nominal voltage. 12 / 24 VDC depending on model

Flow rate: min. 20L/hour at delta pressure = 4.5 bar and Imax. = 0.4 A

Filter fineness: 20 – 30 µm

Filter surface: 700 cm2

Operation Temperature: -40°C to +85°C

Page 26: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 26

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.1.2 Component specification

The following chapter contains apperance and functional requirements.

Appearance

Housing - If no paintwork necessary, surface must be even

and concolorous.

- Scratches (for example of abrasive removed

labels) must not appear.

- Paintwork if necessary.

- Paintwork must be in black.

- Paintwork must be even.

- Paintwork must resist climate environment

conditions mentioned in 4.1.1 General

requirements.

- Paintwork must resist usage environment,

mounted at vehicle frame and/or being subject

to vehicle vibration.

- Paintwork must not peel of within climate

conditions mentioned in 4.1.1 and/ or vehicle

vibration.

- Paintwork must fulfil IMDS requirements.

- Cracks are not allowed.

Accumulator body - base material appearance, consistent nature

throughout after chemical and/or mechanical

cleaning

- Paintwork not allowed.

- Cracks are not allowed.

- Scratches are not allowed.

Fittings - discoloration allowed.

- residuals (staining) not allowed.

- Paintwork not allowed.

- Cracks are not allowed.

Connections - discoloration allowed.

- residuals (staining) not allowed.

- Paintwork not allowed.

- Cracks are not allowed.

Labelling - Engraved/ Stamped into accumulator body.

- location to be defined. Based on readability

requirements during vehicle maintance and

labelling conditions in reman process line at

Page 27: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 27

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

supplier facility.

- additional paper labels allowed (only barcode/

2Data Matrix Code, human readable part

number allowed). Paper label must not influence

appearance requirements.

- additional supplier logo on accumulator body

allowed. (Supplier labelling must not interfere

with specified reman logo in chapter 3.12.3.

Functionality

Relief/ Air Valve:

- Latest relief/ air valve must be assembled.

- External valves may be installed as necessary

for conversion to diaphragm design

(A000 140 04 78)

Pump Head Heating feature:

- all urea pump designs must have a pump head

heating

Pump Head and Motor:

- As necessary, Aquatec assemblies will be used

as replacement.

Motor:

- Bearing replacement

- Commutator machining

- Brush replacement

- Label removal and painting

- Valve replacement

- Seal replacement

- Bearing replacement

Pressure Bladder:

Latest LU Bladder Accumulator ribbed including

cover must be assembled (in the course of no

function/ and or corrosion found on

accumulator body/cover/screw near pressure

bladder. (Daimler QM: Oiling of screw/cover

recommended to prevent corrosion caused by

moistness inside screw thread/accumulator

body.

- Shipped with ambient pressure.

- appropriate “tag” stating “Accumulator bladder

not filled” similar to current service products

Replacement Parts:

- O-rings on all fittings

- Diaphragm valve

- Filters

- Plastic fitting shipping caps

- Replaceable gaskets

- Pump housing (based on appearance and

Page 28: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 28

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

functionality after restoration/salvage). Cracks

are not allowed.

- Accumulator housing (based on appearance and

functionality after restoration/salvage)

- Bladder cover and pressure cap (based on

appearance and functionality after

restoration/salvage)

- Latest LU Bladder Accumulator ribbed must be

assembled

- Brushes must be replaced. (shortening < 80%).

Springs must be replaced.

- Inlet filter must be replaced.

Components reuse:

- Fittings (based on appearance and functionality

after cleaning)

- Screws, nuts, clips, fasteners, other hardware,

etc. (appearance and functionality after clean-

ing), (thread movement must be ensured)

- Grommets (appearance and functionality after

cleaning)

Salvage: - Motor – brushes, commutator, bearings, etc.

- Pump – valves, seals, fittings

- Housing – painting, restoration via plastic

blending, etc.

- Accumulator – media blasting, thread repairs,

conversion, etc.

Page 29: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 29

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.1.3 General component repair

A general component repair is not acceptable unless statistical and reliability data prove that repaired

components meet the OEM technical requirements. Component repair on critical parts i.e. housing, motor is

not accepted.

4.1.4 Electric Components Requirements

Winding must be checked for short to ground or for short between the windings. Winding resistance must be

measured and verified.

Brush holder functionality must be given. Any kind of damage of the brush holder are not acceptable and

must be replaced. Brushes must be replaced by shortening (length < 80%). Springs must be replaced.

Commutator roundness must be within cirularity tolerance. Commutator must be even by lathe to remove

brush marks to achieve necessary grinding surface for high and stable functionality and durability.

Picture 4 and 5: Commutator and Brush Assembly

Page 30: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 30

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.2 Miscellaneous

4.2.1 General data

According to Drawings.

4.2.2 Tightening – Loosening torque

The tightening torque for bolts and nuts must achieve OE values according to drawing specification.

Deviations can be agreed on a separate appendix sheet if required and must be validated for tightness.

For part numbers A 000 140 15 78, A 000 140 27 78 and all urea pump modules without metal screw

thread in plastic housing, loosening torque must be validated and documented, to ensure tight closed

housing during operation conditions. Test results and reports must be provided to Daimler AG.

4.2.3 Operating condition

Temperature limits of individual components shall not be exceeded while operating at specified temperature

range.

4.2.4 IMDS – International Material Data Sheet

International Material Data Sheet must be considered to fulfil international laws und regulations regarding

materials used in automobile industry. IMDS can be considered in /be part of process and product audit

performed by Daimler AG.

Page 31: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 31

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.3 Testing and Validation

A testing and validation of all remanufactured urea pump module – Air Assisted part numbers is required

prior to the technical release of each part. For replacement parts from non OE supplier and for paintwork

and screw connection/ Gluing concepts a temperatur shock test under continous monitoring of the device

under test and a sinusoidal vibrations test are required. Supplier must provide samples to Daimler AG.

Validation tests (salt spray, temperature shock test, sinusoidal vibration) will be performed by Daimler AG.

Test results must be documented in a final test report and be provided.

4.3.1 Product Validation

For product validation, test samples (one piece per each part number) have to be tested according to the

following procedure and have to be fully functional afterwards.

4.3.2 Functional Test

Supplier must perform 100% functional test.

Supplier must specifiy functional test procedure.

Supplier must perform functional test for each part number in reman process.

Supplier must fulfil drawing specifications.

A 000 140 04 78

Salt Spray

Endurance test

Temperatur Shock test

A 000 140 05 78 A 000 140 15 78 A 000 140 27 78

Functional test

Vibration test

for paintwork, connection concepts and non-OE parts.

Appearance check

Page 32: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 32

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.3.3 Endurance Test

Procedure and Implementation: Continuous Operation Duty

Duty Cycle: 95%

Dosing Clock Frequency: 1 Hz

Operating Pressure 4.5 bar

Test Duration: 250 hours

Functional Test: Before Start and After test

Ambient Temperature: Room Temperature (20°C)

Supply Voltage: 12 / 24 VDC depending on model

Operation Medium: Double distilled water with up to 3% urea.

4.3.4 Vibration Resistance (sinus shake)

Sinus shake test according to IEC86 Part2-6.

4.3.5 Temperature Shock Test (with in operation mode)

To be specified.

4.3.6 Salt spray test (with urea pump module – air assisted in operation)

Based on DIN 50021 and ASTM B117

Component in mounting position, all electrical lines connected.

Test time: 96 h

Salt concentration: 5% NaCl

Spray time: 6 min/h

Rest: 30 min after every 11 h

Temperatur: 35 ± 5 °C

Rating: After test with the specified values the urea pump module – air assisted must be fully functional by

definition.

Page 33: Specbook Air-assisted pump QEV111AGBSSR_LH_AdBlue Pump Module AA_V6.pdf

Version 2015/02/09 Daimler Object-No.:

Daimler KEM-No.:

QEV111AGBSSR

R-00036114

Daimler AG

Mercedes-Benz

ALL RIGHTS RESERVED

- Property of Daimler AG -

Requirement Specification Draft

Mercedes-Benz

Genuine Remanufactured Part

Urea Pump Module – Air Assisted

Page 33

This document is protected by copyright. Any usage outside of the strict boundaries of copyright law without the approval of

Daimler AG is impermissible.

4.4 Residual requirements

Every component has to fulfill a certain degree of cleanliness in order to assure proper functionality of the

Urea Pump Module – Air Assisted. Cleaning results have to be verified. A certain amount of residuals can

cause malfunctions. Malfunctions are not allowed. The functional and visual cleanliness of components has

to be specified during the project to ensure constantly high quality.

Residual requirements of Mercedes-Benz Genuine Remanufactured Part - Urea Pump Module – Air Assisted