    COAL HANDLING PLANT

    FUNCTION - Automatic feeding of coal to boiler furnace

    PROCESS - 1) Coal is unloaded from rail wagons in IV unit of

    KSTPS

    2) Coal is sent to crusher where coal is reduced to

    very small size

    Consumption of coal/Unit of electricity - 0.6 Kg

    Consumption/day - 20000 tons/day

    DEVICES -

    1) Wagon Tripler - 5 (32 wagons/hr)

    2) Vibration Feeders - Electromagnetic Type

    3) Conveyor belts

    4) Crushers - 6 (550 tons/hr)

  • 8/22/2019 Spec Pics r3

    3/19

    Raw coal from bharatcoal ltd. Dhanbad &bilaspur(MP)

    To KSTPS from gudla via a

    single railway track

    Wagon

    tippler

    hoppersCrusher housebunkers

    Row coal

    feeders

    Coal mills

    (pulverization)

    Boiler furnace ( tangential firing of

    pulverized coal)

  • 8/22/2019 Spec Pics r3

    4/19

    WATER CLEANING

    CHEMICAL

    MIXER

    FILTER

    BED

    CLARIFLOCULATOR

    TANK

    CLARIFY

    WATER

    SUMP

    FLASH

    MIXER

    PUMP

    PUMP

    CLARIFY

    WATER

    STORAGE

    VALVE

    RAW

    WATER

  • 8/22/2019 Spec Pics r3

    5/19

    CWPH

    1-5

    CONDENSOR

    6-7

    COOLING

    TOWER 6-7

    CWPH

    6-7

    DM PLANTWTP

    CONDENSOR

    1-5

    CLOSED LOOP

    SYSTEM

    SOFT

    WATERDM

    WATERCLARIFIED

    WATER

    RAW

    WATER

    FILTER

    WATER

    OPEN LOOP

    SYSTEM

    WATERCYCLECHAMBAL

    UPSTREA

    M

    RIVE

    R

    HOT

    WATER

  • 8/22/2019 Spec Pics r3

    6/19

    BOILER

  • 8/22/2019 Spec Pics r3

    7/19

    TURBINE

  • 8/22/2019 Spec Pics r3

    8/19

    AIR PRI-HEATER

    Function - To raise the temperature of air

    Benefit - Increases the efficiency of plant

    Type - plate, tubular, regenerative

    KSTPS - uses REGENERATIVE type

  • 8/22/2019 Spec Pics r3

    9/19

    Primaryair

    Secondaryair

    Fluegas

    AIR PRE-HEATER

  • 8/22/2019 Spec Pics r3

    10/19

    GENERATOR

    It converts mechanical power into electrical power.

    PRINCIPLE- Electromechanical energy

    conversion

    TECHNICAL SPECIFICATION-

    Apparent output137.5 MVA

    Active output - 110 MW

    Power factor

    0.85 lagExcitation voltage - 230 Volt

    Rated voltage11 KV

    Rated speed3000 rpm

    Phase connection star-star

  • 8/22/2019 Spec Pics r3

    11/19

    ECONOMISER

    Function-To extract some part of

    heat from flue gases & heat the

    feedwater

    Process- Counter flow of flue

    gases & water

    Benefits- Increases efficiency

  • 8/22/2019 Spec Pics r3

    12/19

    CONDENSER

    To provide lowest economic heat rejection

    temperature for the steam. Thus saving on

    steam required per unit of electricity.

    To convert exhaust steam to water for reuse

    thus saving on feed water requirement.

  • 8/22/2019 Spec Pics r3

    13/19

    COLLING TOWER

    It converts hot water from into cold water.

    Its purpose is to re use of the water.

    Its increase the efficiency of plant. It increase the per capital investment of plant.

    In K.S.T.P.S. only unit 6th and 7th has cooling

    tower.

  • 8/22/2019 Spec Pics r3

    14/19

  • 8/22/2019 Spec Pics r3

    15/19

    ELECTROSTATIC PRECIPITATOR

    15

    Used for the removal of suspended particles and fly ash fromindustrial flue gases

    PRINCIPLE- Produces an electrostatic field which attracts the

    ionized carbon particles and other such particulates which cause

    environmental pollution.

  • 8/22/2019 Spec Pics r3

    16/19

    SWITCHYARD

    Place where switching operations of power

    distribution is perfomed.

    Outgoing FeederBeawer feeder -1,2

    Heerapura feeder - 1,2

    Sakatpura Feeder - 1,2,3

  • 8/22/2019 Spec Pics r3

    17/19

    220KV SWITCHYARD

    Main Equipment Of Switchyard

    Bus Bar Bus Coupler Isolating switch Earthing Switch Lightning Arrester Current & Potential Transformer (CT&PT) Circuit Breaker Capacitive Voltage Transformer (CVT) Wave Trap Supporting Structures

  • 8/22/2019 Spec Pics r3

    18/19

    TRANSFORMER

    GENERATINGTRANSFORMER

    UNIT AUXILLARYTRANSFORMER

    STATION

    TRANSFORMER

    EXCITATION

    TRANSFORMER

    TRANSFORMER

  • 8/22/2019 Spec Pics r3

    19/19

    CONCLUSION