SPE/IADC 163463
Extended Reach Drilling –
new solution with a unique potential
O. Vestavik, Reelwell,
M. Egorenkov, Merlin ERD,
B. Schmalhorst, RWE Dea AG,
J. Falcao, Petrobras,M. Roedbro, Shell Technology Norway
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
2/18
CONTENT
- BACKGROUND AND TECHNOLOGY
- JOINT INDUSTRY PROJECT ON ERD
- RESULTS
- CONCLUSION
Slide 2
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
3/18
BACKGROUND
- Reelwell Drilling Method (RDM)- Dual channel drill string
- Return flow inside this string.
- 2011: Started a Joint Industry Project on ERD, funded by Shell, Total,
Petrobras, RWE Dea AG and the Research Council of Norway.
- RDM provides:
- Two well barrier MPD system
- Reduced of torque and drag
- Avoid the dynamic ECD gradient
- The following presents a case study on a 16 km ERD well.
Slide 3
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
4/18
Reelwell Drilling Method
Animation/movie
Slide 4
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
http://localhost/var/www/apps/conversion/tmp/scratch_7/RDM+Canada_without%20logo.mp4http://localhost/var/www/apps/conversion/tmp/scratch_7/RDM+Canada_without%20logo.mp4
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
5/18
RDM – Basic Drilling Method
Slide 5
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
- RDM is fully compatible with standard bits
- Uses conventional MWD, directional equipment, RCD
http://localhost/var/www/apps/conversion/tmp/scratch_7/2011_Hole%20Cleaning%20demo_30%20sec_720x576.wmvhttp://localhost/var/www/apps/conversion/tmp/scratch_7/2011_Hole%20Cleaning%20demo_30%20sec_720x576.wmv
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
6/18
Heavy Over Light - Principle
Slide 6
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
- High density fluid in the well annulus
- Low density fluid – inside string and cleaning the hole
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
7/18
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
8/18
Engineering Model Assumptions
Slide 8
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
Hole Size [in] Casing Size [in] Casing shoe depth [m]
24 20 100016 13 3/8 5000
13 1/2 10 3/4 14000
9 7/8 7 15800
Casing:
Well path:
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
9/18
Buoyancy Effects on Drag
Slide 9
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
No bouyancy Partly bouyant Full bouyancy
Well annulus
fluid density [sg]
Active fluid
density [sg]
No buoyancy 1.2 1.2
Partly buoyancy 1.56 1.2
Full buoyancy 1.75 1.15
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
10/18
Buoyancy Effects on Torque
Slide 10
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
Typical limit
- Buoyancy - Improved operating window on the pipe
- Low torque - Reduced casing wear and hole erosion
0
20
40
60
80
100
120
140
T o r q u e
[ k N m ]
Measured Depth [km]
Alu- partly boyant
Alu- full bouyancy
Steel- no bouyancy
Steel- max bouyancy
Alu- no bouyancy
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
11/18
Casing and Liner Installation
Slide 11
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
Installation of 10 ¾” casing and 7” liner - feasible by flotation.
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
12/18
Effects of Heavy Over Light
Slide 12
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
• Reduce borehole friction
• Torque & Drag – can be significantly reduced.
• MPD with two well barriers:
• Annular well fluid may be used as a well barrier fluid• Low density active circulating fluid
• Hole stability
• Optimum well pressure at all times
• Avoids dynamic ECD and flow erosion
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
13/18
MPD with two well barriers
Slide 13
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
l d
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
14/18
Effects of Heavy Over Light
Slide 14
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
• Reduce borehole friction
• Torque & Drag – can be significantly reduced.
• MPD with two well barriers:
• Annular well fluid may be used as a well barrier fluid• Low density active circulating fluid
• Hole stability
• Optimum well pressure at all times
• Avoids dynamic ECD and flow erosion
Slid 15
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
15/18
Avoid Dynamic ECD Limitations
Slide 15
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
- Dynamic ECD gradient in open hole can limit horizontal reach
- RDM – ECD gradient inside the drill pipe is screened from the well annulus
therefore overcomes the dynamic ECD limitation
Slid 16
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
16/18
ERD Comparison
Slide 16
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
Challenge for Conventional ERD Solution by RDM
• High Torque and Drag
- High capacity rigs
- high casing wear and hole erosion
• Low Torque and Drag
- Lower capacity rigs
- Utilize mature asset rigs for ERD
- Low casing wear and hole erosion
• ECD limitations- Reach limited by ECD margins
- Washouts and hole stability issues
• Avoid ECD limitations- Dynamic
static gradient
- Washouts avoided, improved stability
• May require additional MPD equipment • Built in MPD
- Two well barriers
• Other:
- Time consuming hole cleaning- ERD is limited by the above factors
• Other:
- Improved hole cleaning- ERD is improved by the above factors
Slid 17
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
17/18
Conclusion
Slide 17
SPE 163463 • ERD – New Solution with a Unique Potential • Ola Vestavik
• New solution provides ERD beyond conventional reach,case example of 16 km long ERD well is considered feasible.
• Unique features:
- MPD with two well barriers- Low torque & drag
- Avoids dynamic ECD
Slide 18
-
8/19/2019 SPE-163463 - ERD New Solution-Presentation
18/18
Acknowledgements / Thank You / Questions
Slide 18
Thanks to Shell
Total
Petrobras
RWE Dea AGResearch Council of Norway
For the support and allowing the study to be presented
Thank you to the many members of these organizations for their
valuable contributions