SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
-
Upload
titus-kernel-maestria -
Category
Documents
-
view
225 -
download
0
Transcript of SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
1/34
Test : SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO)Speialist
Passez en revue vos réponses, les commentaires en retour et les notes ci-dessous. Un astérisque (*)indique la réponse correcte.
This 13 - question assessment test is the !nal component o" the #P$%& 'nterprise -#eries 'ntr-evel and
Server Prod!ts Overvie"
(%épondez 6 toutes les questions de cette section.)
#$ racle 'nterprise inu7 is supported on 728, 728-89, and #P$%&89 architec
:rai
;au7 (*)
&orrect
%$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
2/34
&orrect
$ racle 'nterprise ana+er ps &enter provide phsical and virtual sstem
:rai (*)
;au7
ncorrect. %e"er to the #erver vervie/
Pa+e 1 sur C8 Suivant Récapitulatif S!n SPARC Enterprise M*** Server Overvie" and Ar+itet!re
(%épondez 6 toutes les questions de cette section.)
,$ Eo/ man Phsical #stem ?oard sets (P#?s) can reside in a 2server=
Fuestion 6
revoir (1) Points
T/elve
'i+ht
;our (*)
#i7teen
&orrect
$ Eo/ man cores does each #P$%&89 : &PU have= Fuestion 6
revoir (1) Points
ne
;our
#i7
T/o (*)
ncorrect. %e"er to the #un #P$%& 'nterprise G #erververvie/ and $rchitecture trainin+ "or more in"ormation.
.$ Eo/ man Phsical #stem ?oard sets (P#?s) can reside in a H-89server=
Fuestion 6
revoir (1) Points
#i7teen (*)
;our
'i+ht
T/ent-"our
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
3/34
ncorrect. %e"er to the #un #P$%& 'nterprise G #erververvie/ and $rchitecture trainin+ "or more in"ormation.
/$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
4/34
Ultra#P$%& T1
#P$%&89 :I: (*)
Ultra#P$%& I:
&orrect
#&$ one o" the a4ove.
&PUs and memor reside on diJer
ncorrect. %e"er to the #un #P
#'$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
5/34
uni-mode, dual-mode, and quad-
dual-mode and quad-mode
uni-mode and quad-mode (*)
ncorrect. %e"er to the #un #P
#$ one o" the a4ove
ncorrect. %e"er to the #un #P
%*$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
6/34
&orrect
Précédent Pa+e 9 sur C8 Suivant Récapitulatif
S!n SPARC(TM) Enterprise M&*** Server Ad0inistration
(%épondez 6 toutes les questions de cette section.)
%#$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
7/34
ncorrect. %e"er to the #un #P
%$ Eo/ man +roups is memor divided into=
T/o - Lroups $ and ? (*)
T/o - Lroups 1 and C
;our - Lroups 1, C, 3, and 9
;our - Lroups $, ?, & and
ncorrect. %e"er to the #un #P
Précédent Pa+e B sur C8 Suivant Récapitulatif
S!n SPARC(TM) Enterprise M&*** Server Ad0inistration
(%épondez 6 toutes les questions de cette section.)
%,$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
8/34
&orrect
%/$ Eo/ do ou see /hich version o" !rm/are our service processor
Ktt7sc"versionKItt
Kttversion -c 7cpKItt (*)
Kttsho/versionKItt
Kttsho/!rm/areKItt
&orrect
&*$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
9/34
&orrect
&&$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
10/34
ncorrect. %e"er to the #un #P
&$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
11/34
(%épondez 6 toutes les questions de cette section.)
'#$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
12/34
(%épondez 6 toutes les questions de cette section.)
'$ one o" the a4ove
isa4les the account "or su4sequ
eletes the user
isa4les the account immediatel
&orrect
Précédent Pa+e H sur C8 Suivant Récapitulatif
S!n SPARC Enterprise M*** Server S!pport Readiness Training
(%épondez 6 toutes les questions de cette section.)
',$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
13/34
ncorrect. %e"er to the Q#un #P
'/$ Eo/ /ould ou set the hostname "or G#&; =
Ktthostname 7sc"SKItt
Kttsethostname KhostnameK
Kttsethostname 7sc"S Khostn
KtthostnameKItt
&orrect
*$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
14/34
ncorrect. %e"er to the Q#un #P
&$ one o" the a4ove.
&orrect
'$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
15/34
ncorrect. %e"er to the Q#un #P$%& 'nterprise G #erver#upport %eadiness Trainin+R "or more in"ormation.
$ Prior to per"ormin+ an Kttadd4oardKItt command /hat must the4oard 4e assi+ned to=
Fuestion 6
revoir (1) Points
The domainDs $&
$nother domainDs &
>one o" the a4ove
The domainDs & (*)
&orrect
.$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
16/34
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
17/34
;ault mana+ement
>TP
$ll o" the a4ove
ncorrect. %e"er to the Q#un #P$%& 'nterprise G #erver#upport %eadiness Trainin+R "or more in"ormation.
,$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
18/34
revoir (1) Points
&on!+ures the service processor as an $P server
&on!+ures the service processor as an $P client
'na4les or disa4les the use o" $P (*)
isplas the $P con!+uration "or the service processor
&orrect
,/$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
19/34
%$ one o" the a4ove.
&orrect
'$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
20/34
#upport %eadiness Trainin+R "or more in"ormation.
Précédent Pa+e 1B sur C8 Suivant Récapitulatif S!n SPARC Enterprise M*** Server S!pport Readiness Training
(%épondez 6 toutes les questions de cette section.)
,$ T used to mana+e ># on the
service processor=
Fuestion 6
revoir (1) Points
Kttsho/nameserverKItt
KttsethostanmeKItt
KttsetdnsKItt (*)
KttsetnameserverKItt
ncorrect. %e"er to the Q#un #P$%& 'nterprise G #erver
#upport %eadiness Trainin+R "or more in"ormation.
$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
21/34
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
22/34
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
23/34
. #un ;ire G91 and #un ;ire G9C servers
&orrect
.$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
24/34
. in0 ca4le "ailure
. &ard port "ailure
. &ard "ailure (*)
. >ormal operation
&orrect
Précédent Pa+e 12 sur C8 Suivant Récapitulatif S!n E1ternal I O E1pansion 2nit Installation and Ad0inistration
(%épondez 6 toutes les questions de cette section.)
/#$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
25/34
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
26/34
nstallation and $dministration trainin+ "or more in"ormation.
/.$ $t revenue release o" the #un '7ternal I '7pansion Unit /hich"eature is >T supported=
Fuestion 6
revoir (1) Points
. T/o I ?oats in one #un '7ternal I '7pansion Unit chassis
. &opper lin0 connection "rom a host to the #un '7ternal I'7pansion Unit. ptical lin0 connection "rom a host to the #un '7ternal I'7pansion Unit. I ?oat-to-I ?oat dais chainin+ (*)
&orrect
//$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
27/34
. U#?
. ;i4re &hannel
ncorrect. %e"er to the #un '7ternal I '7pansion Unitnstallation and $dministration trainin+ "or more in"ormation.
#*%$Eo/ man lin0 ca4les does a ;i4re optic lin0 0it contain= Fuestion 6
revoir (1) Points
. T/o (*)
. Three
. ;our
. ne
&orrect
ESD Prevention
(%épondez 6 toutes les questions de cette section.)
#*&$o/ humidit environments reduce the volta+e +enerated "rom "rictionand movin+,
Fuestion 6
revoir (1) Points
:rai
;au7 (*)
&orrect
#*'$ The leadin+ cause o" semiconductor "ailure is due to= Fuestion 6
revoir (1) Points
ncorrect po/er suppl used /ith the sstem
'lectrostatic dischar+e (*)
The increased use o" 9Bnm technolo+ in manu"acturin+semiconductorsama+e durin+ shipments
&orrect
#*$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
28/34
The a4ilit o" a part to /ithstand a static char+e /ithout "ailure.
ama+e to sstem components due to the use o" an incorrectpo/er suppl
The "ailure o" an item that /ould result in "ailure o" the sstem.
&orrect
Précédent Pa+e C1 sur C8 Suivant Récapitulatif ESD Prevention
(%épondez 6 toutes les questions de cette section.)
#*,$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
29/34
#*/$#tandin+ up can +enerate up to 1,9 volts. Fuestion 6
revoir (1) Points
:rai (*)
;au7
ncorrect. %e"er to the '# Prevention trainin+ "or morein"ormation.
##*$
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
30/34
##&$Eo/ o"ten is the '#-: released= Fuestion 6
revoir (1) Points
nce a month (*)
T/ice a month
nce a quarter
nce a ear
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or morein"ormation.
##'$urin+ the #stem #peci!cation and Test e!nitions stepX Fuestion 6
revoir (1) Points
e!ne details such as host names, P addresses, and 4oot dis0laout "or the ne/ sstems. ;urthermore, the testes that /ill 4eper"ormed durin+ customer handover are de!ned. (*)a0e sure the pro5ect can ran+e "rom a sin+le server installationto a comple7 international con!+uration involvin+ multiple sites,servers, stora+e, and services.&reate customer documentation and hand over "or si+noJ.
'nsure that e7plorer (/ith the instin"o option) has 4een run andthe e7plorer data !le has 4een uploaded to the correct con!+?.
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or morein"ormation.
##$ True or ;alse= The '# ethodolol+ can 4e applied to other post-installation activities such as a #olaris # up+rade.
Fuestion 6
revoir (1) Points
:rai (*)
;au7
&orrect
Précédent Pa+e C3 sur C8 Suivant Récapitulatif 2sing EIS Met+odology
(%épondez 6 toutes les questions de cette section.)
##,$urin+ the Pro5ect nitiation stepX Fuestion 6
revoir (1) Points
[ou ensure that e7plorer (/ith the instin"o option) has 4een runand the e7plorer data !le has 4een uploaded in the correct
con!+?.&ustomer details, the installation team, %adiance case num4ers,and order num4er (as appropriate) are documented.
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
31/34
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
32/34
#%*$ True or ;alse= '# is an optional service "or installations carried out 4#un staJ and their installation partners.
Fuestion 6
revoir (1) Points
:rai
;au7 (*)
&orrect
Précédent Pa+e C9 sur C8 Suivant Récapitulatif 2sing EIS Met+odology
(%épondez 6 toutes les questions de cette section.)
#%#$Eo/ do ou identi" a sstem that has 4een installed usin+ '#=(#elect all that appl)
Fuestion 6
revoir
(1) Points
(&hoisir toutes les réponses correctes)
the !le IvarIsunI'#-&.lo+ is populated /hen runnin+ the setup-standard script and the patch installation scripts. (*)
The '#-: e5ects "rom the : reader.
The sstem 4oots /ithout error.
The results "rom LriJon should 4e clean. (*)
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or more
in"ormation.
#%%$urin+ the '# &ompliance #i+n J stepX Fuestion 6
revoir (1) Points
4tain pro5ect si+noJ and handover o" pro5ect documentation
Per"orm the sstem tests as de!ned.
;ollo/ the additional steps throu+h P# or Partners. n L#, thisdepends on the availa4lilit o" templates reNectin+ these services.
&reate customer documentation and hand over "or si+noJ. (*)
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or morein"ormation.
#%&$Plannin+ is a ver important phase o" a success"ul installation andhelps determine, and con!rm, the delivera4les /ith the customer.
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
33/34
>#T$plan
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or morein"ormation.
#%'$ True or ;alse= The ?oot is0 aout and irrorin+ #tandard is intendedto help installation planners "ormat their 4oot dis0s in a consistent and
supporta4le manner.
Fuestion 6
revoir (1) Points
:rai (*)
;au7
&orrect
#%$ True or ;alse= 'nterprise installation #tandards ('#) is a methodolo+that ensures consistent, hi+h-qualit, cost-eJective #un sstems andstora+e installations "or #un customers.
Fuestion 6
revoir (1) Points
:rai (*)
;au7
&orrect
Précédent Pa+e CB sur C8 Suivant Récapitulatif 2sing EIS Met+odology
(%épondez 6 toutes les questions de cette section.)
#%,$ The +roundin+ standard states thatX Fuestion 6
revoir (1) Points
$ll server installations are to 4e properl +rounded accordin+ tothe methods descri4ed in the appropriate #un hard/aredocumentation. (*)$ clean data center environment must 4e maintainedX sstemsshould 4e unpac0ed outside o" the data center, and then movedinto the center.
$ sstem should not e7perience a ma7imum positive or ne+ativetemperature +radient o" more than C de+rees &elsiuls or 9de+rees ;arenheit per hour.Processes are in place to ensure that equipment is not dama+eddue to improper handlin+ or clima+e chan+es 4et/eentransportation and the !nal destination.
ncorrect. %e"er to the Usin+ '# ethodolo+ trainin+ "or morein"ormation.
#%$ True or ;alse= '# does not and cannot cover ever sin+le productavaila4le "rom #un.
Fuestion 6
revoir
(1) Points
:rai
-
8/18/2019 SPARC Enterprise M-Series Entry-Level and Midrange Servers Installation (IDO) Specialist
34/34