Spanning Tree Protocol Thesis - Aditya Bayu Putranto
-
Upload
aditya-bayu-putranto -
Category
Education
-
view
2.493 -
download
2
Transcript of Spanning Tree Protocol Thesis - Aditya Bayu Putranto
1© 2010 Cisco and/or its affiliates. All rights reserved.
What You Make Possible
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2Cisco Confidential 2© 2010 Cisco and/or its affiliates. All rights reserved.
Aditya Bayu Putranto – Fresh Graduate & CCNA Certified
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3Cisco Confidential 3© 2010 Cisco and/or its affiliates. All rights reserved.
Aditya Bayu Putranto – Fresh Graduate & CCNA Certified
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4Cisco Confidential 4© 2010 Cisco and/or its affiliates. All rights reserved.
Actually 4 things
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5Cisco Confidential 5© 2010 Cisco and/or its affiliates. All rights reserved.
At Universitas Sanata Dharma Yogyakarta, Indonesia
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
• WebEx Meeting
• Technical & Non Technical
• Topic for My Thesis
• Only 2960 and 1900
• Spanning Tree Protocol
• My Thesis Supervisor Agree
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7Cisco Confidential 7© 2010 Cisco and/or its affiliates. All rights reserved.
Just technical issue.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8
Business Communication
Reliable Network
Redundant Network
Small Company
Cisco Switch 2960
Spanning Tree Protocol
Legacy protocol
STP timers
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
Convergence Time 30 – 50 second
Maximum Network Diameter 7
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 11
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13
Timers Setting vs Convergence Time.
Timers Setting vs Network Diameter.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14
STP Timers impact for initial convergence, failover convergence, dan recovery convergence.
Probability, Fail to Convergent.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15
• Literature Review
• Planning
• Implement
• Data Measurement
• Data Analysis
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16Cisco Confidential 16© 2010 Cisco and/or its affiliates. All rights reserved.
Aditya Bayu Putranto - 085314113
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 17
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19Cisco Confidential 19© 2010 Cisco and/or its affiliates. All rights reserved.
Let’s zoom in
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 20© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 20© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 20Cisco Confidential 20© 2010 Cisco and/or its affiliates. All rights reserved.
The legacy protocol
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21Cisco Confidential 21© 2010 Cisco and/or its affiliates. All rights reserved.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
Electing a root switch
Determining the root port
Determining the designated port
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
Hello Time
Forward Delay
Maximum Age
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25Cisco Confidential 25© 2010 Cisco and/or its affiliates. All rights reserved.
My technical constraint device constraint.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
Only 9 Catalyst 2960
Data Measurement
Whole Network
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
Network Diameter
Debug Spanning Tree Protocol
Network Time Protocol
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
Switch>enableSwitch#configure terminalEnter configuration commands, one per line. End with CNTL/Z.Switch(config)#spanning-tree vlan 1 hello 2Switch(config)#spanning-tree vlan 1 forward 15Switch(config)#spanning-tree vlan 1 max 20Switch(config)#
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
• Initial Convergence
• Failover Convergence
• Recovery Convergence
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 34
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 35Cisco Confidential 35© 2010 Cisco and/or its affiliates. All rights reserved.
…
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 36Cisco Confidential 36© 2010 Cisco and/or its affiliates. All rights reserved.
*Direct Topology Change
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 37
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 38
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 39
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 40© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 40© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 40Cisco Confidential 40© 2010 Cisco and/or its affiliates. All rights reserved.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 41
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 42
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 43
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 44© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 44© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 44Cisco Confidential 44© 2010 Cisco and/or its affiliates. All rights reserved.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 45
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 46
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 47
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 48
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 49
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 50
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 51© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 51© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 51Cisco Confidential 51© 2010 Cisco and/or its affiliates. All rights reserved.
Aditya Bayu Putranto - 085314113
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 52
• Forward Delay
• Flapping
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 53
• More Maximum Network Diameter
• Packet Filtering
• How far STP timers default can accommodate network diameter?
• How's STP 802.1D, PVST+, dan Rapid PVST+
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 54
• Hucaby, David (2010), CCNP Switch 642-813 Official Certification Guide, Chapter 7: “Traditional Spanning Tree Protocol”.
• Cisco System, Inc. (2007), CCNA Exploration 4.0: LAN Switching and Wireless, Cisco System, Inc., Chapter 1: “Switched LAN Architecture”.
• Cisco System, Inc. (2007), CCNA Exploration 4.0: LAN Switching and Wireless, Cisco System, Inc., Chapter 3: “VLANs”.
• Cisco System, Inc (2007), CCNA Exploration 4.0: LAN Switching and Wireless, Cisco System, Inc., Chapter 4: “STP”.
• Sofana, Iwan (2010), Cisco CCNA & Jaringan Komputer, Penerbit Informatika.
• Hucaby, David (2010), CCNP Switch 642-813 Official Certification Guide, Chapter 4: “VLANs and Trunks”
• Sincoskie, W. D., Cotton, C. J (1988), Extended Bridge Algorithms for Large Networks, IEEE Network Journal January
• Bryant, Chris (2011), What Are Broadcast Storms?, MC MCSE Certification Resources (www.mcmse.com/cisco/guides/broadcasts.shtml), Diakses pada tanggal: 5 Juni 2012.
• Cisco Systems, Inc. (2006), Understanding and Tuning Spanning Tree
Protocol Timers, Document ID: 19120.
• Cisco Systems, Inc. (2005), Data Sheet: Cisco Catalyst 2960 Series Switches.
• The Wireshark Team, “Wireshark FAQ”, (www.wireshark.org/faq.html), Diakses pada tanggal 9 September 2012.
• IEEE 802.1 Working Group (1998), “802.1D-1998 ANSI/IEEE Standards 802.1D, 1998 Edition Document: Media Access Control Bridges”
• Cisco Systems, Inc., “Cisco Catalyst 2960 Series Switches” (www.cisco.com/en/US/products/ps6406/index.html), Diakses pada tanggal 18 November 2012.
• Networkers 2004, “Accurate Time Synchronization on Cisco Routers”, Cisco Document ID: NMS-1N03.
• Quigley, J Colin (2011), “An Investigation into Spanning Tree Protocol 802.1D and Convergence Performance”, Honours Final Project Report.
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 55
Thank you.