Span Repair Logs 523683 7

download Span Repair Logs 523683 7

of 17

Transcript of Span Repair Logs 523683 7

  • 8/17/2019 Span Repair Logs 523683 7

    1/17

    BM Cen tral 2112

    Survey Geodetic Parameters

    Grid

    P (NAD 83)

    Zone

    Survey Units

    Ellipsoid

    GPS Correction

    Qty of Satellites

    RTK Fix

    2.010 tiPc

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Enbridge Project

    nbridge Project Ma nager

    W,IPJ-19972-10

    OM

    -V I

    0-

     

    Contractor

    ontractor Project Num ber

    Walla ES Spec_ Serv. 4902595.10.071

    Enbridge on-site Rep

    it A

    N

    Scvvie

    Contract supervisor

    C A P A 1 Ave/

    Dwain,

    Tins System for Tone Shutdown

    Current Year Span Length

    q

    Previous Year Span Length

    Numb er of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    Anch or Positions

    Digital File Name or DVD

    m••••

    Span Information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span (s)

    Addit. Extensions Used?

    Length of Extension(s)

    Drilling issues?

    S - - — \ 2 .

    S0

    Li

    5— 4

    I(-

    1

    ?_,- k, 1 %

    i

    1

    , 60L-

    n.

    V . 1 1 0 -

    s A l e

    Drilling Issues: Include torque sp ec not met. modified sieves, modieed assembly, etc...

    South End orth End

    epair

    Tape Counter

    LinkQuest Northing

    LinkQuest Easting

    Digital File Filename

    Digital File Time

    Display Time

     

    Bottom Type at Repair

     

    Highest Span Height

    TD O'clock Positions

     

    1:11 1;

     

    - 1 i 1:19

    citt‘ 6

    .1:3

     

    c

      1 , _ ‘ e n 4

    cok aw. 10

     

    1 5

    sl 41,i

    to ic1sloi3/0, 1.

    1 0 1 , 5 1

    Li

    1,?.\., x

    irtyci

    1114

    1 - - 1

    ,

     6

    1 1

    -

    -0

    p

    -016

    s

    c

    ,„

    c K N I

    S s v g ic A c y

    sv,

    ,

    ) I cic, v fiktr

    9.°

    DI

    •̀`

    Span Repair Sketch:

    Include North and South natural TD s, previously Installed repairs, repair numbers, debrisItresh, natural outaaps, and Medina diver s measurements,

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    2/17

    Survey Geodetic Parameters

    Grid

    one

    Survey Units

    Ellipsoid

    GPS C orrection

    Qty of Satellites

    RTK Fix

    SP

    N A D

    83

    MI Central 2112

    Am

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Enbridge

    roject nbridge Project Manager

    W.W.I-19972-18

    7 QNvN

     

    uj

    Contractor

    ontractor Project N umber

    IVeolia

    ES

    Spec. Serv. 1498 259S.10.071

    Pipeline Operation information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Enbridge

    on.sife

    Rep

    Al.

    c,

    V

    Contract supervisor

    Density

    lime System for lime Shutdown

    Span information

    Date Surveyed

    Anchor Positions

    Tape Number

    Direction Flown

    Water Depth

    5 -

    f

    Digital File Name or DV D #

    ao

    Current Year Span #

    Previous Span #(s)

    c)1A-4,

    Current Year Span Leng th

    Previous Year Span Length

    ICO

    Add

    . Extensions Used?

    Number of D ives to Complete

    2

    Length of Extension(s)

    Date(s) of Dive(s)

    c t 1

    Drilling Issues?

    9,1x,1c)

    Dive number(s) for current campaign

    Drilling Issues: include torque spec not net, modified SCTIN.S. madded assembly, etc...

    South End orth End

    epair

    Tape Counts

    UnkQuest Northing

    LinkQuest Easting

    Digital File Filenam

    Digital File Tim

    e

    Display Time

    Bottom Type at Repair

    Highest Span Height

    TD

    O clock Positions

    r

    ):3

    1 • P 2 . -

    i s's

    '°v1 - 1   ; I k

     x)

    ilco), M1

    t1g 4

    -

    1•i5

    ) c )s — f ss

      G ..o. ,--

    it

    C TKolo;, ail

    I q c

    -

    < S-

    c   L -

    g

    1 q

    e

    ._..

    I S : 1 J o

    T'. I

    c

      1

    S . . I

    Cott

    S

    ,

    tl

    GNy

    141

    -liy

    Span Repair Sketch:

    Include North and South natural M's, previously installed repairs. repair numbers, debrienresh,

    natural

    outcrops, and h ardline diver's measurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    3/17

    w

    I W J P J - 1 9 9 7 2 - 1 0

    ic,A)

    Contractor

    ontractor Project Number

    I V eoli a E S Spec. Serv. 1 49 0 2 59 8. 1 0 . 0 7 1

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    l ime Shutdow n

    Product In Line

    If flowing, flow rate

    Enb ridge Pro j ec t

    nbr idge P ro jec t Ma na ger

    Straits of Mackinac Structural

    ntegrity Support Span Repair Log

    Enbr ldge on-site Rep

    C

    N O

     

    N

    Density

    lime System for Time Shutdown

    Survey Geodetic Param eters

    'Grid

    Zone

    'Survey Units

    Ellipsoid

    GPS Correction

    Qty of Satellites

    R T K F i x

    MI C entral 2112

    li

    0

    Con tract supervisor

    v/sr s 13 yv

    Current Year Span Length

    Previous Year Span Length

    Num ber of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    Anchor P ositions

    Digital File Name or DVD

    Span Informat ion

    Date Surveyed

    Tape Number

    Direction F lown

    W ater Depth

    Current Year Span

    Previous Span (s)

    Add it. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    0 -

    s.-,,,i

    1

    ‘,A)-

    1

    to --aL )

    'it.

    Ai 0

    Drilling Issu es: include torque spec not n est, modified screws. rnodined assem bly, etc...

    South End

    orth End

    epair

    Tape Counts

    LinkQuest Northing

    LinkQuest Easting

    Digital File Filenam

    e

    Digital File Time

    Display lime

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

    r

    1

    0

    I oo

    - -

     Rk-I_

    9C,

    -

    )41e),

    --

    1,).

    o

    -

    7c-17'1,3

     

    7

    7 i 6C

    I

    .

    (1

    cgiqo c

     

    c / I

    •5'((nA,1

    ,-

     

    SI.,)ii-i

    -

    , lik

    _ . . . . - - -

    rd,od

    2'•Il

    d oh

    1) -1

     

    1

     

    Afii

    .). :pic.

    C— te,y / Ss 1 ()

    J

    ii ?

    i

    i j / .r et Cr

    2

    i •C

    Span R epair Sk etch:

    include North and South natural TM . previously installed repairs. repair num bers, debris/trash, natural outcrops, and hardline diver's m easurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    4/17

      l

    Pipeline Operation Information

    Is leg shutdow n?

    If so, date shutdow n

    Time Shutdown

    Product In line

    if flowing, flow rate

    Contract supervisor

    COvkl DOI-)

    Contractor Project Num ber

    Veolia ES Spec. Serv.

    [4902595.10.071

    L

    Enbridge Project

    nbridge Project Manager

    IMP. . .19972-10

    Contractor

    C

    l

    NA

    Survey Geodetic Parameters

    IGrid

    Zone

    Survey Units

    Ellipsoid

    WS orrection

    Qty of Satellites

    RTIC Fix

    MI Centra l 2112

    Density

    Time System for l ime Shutdown

    Enbrldge on-site Rep

    Span Repair Sketch: Include

    North and South natural TD's, previously installed repairs, repair numbers, dehriertrash, natural outcrops, and hardline d iver's measurements.

    6 3

    : 9

    Straits of Mack inac Structural

    Integrity Su pport Span R epair Log

    Span Information

    Date Surveyed

    Tape Number

    q- ;-1?,

    Anchor Positions

    Direction F lown

    Digital Ale Name or DVD

    Water Depth

    1 R o

    Current Year Span

    Current Year Span Length

    99

    Previous Span (s)

    A

    Previous Year S pan Length

    Addit. Extensions Used?

    Num ber of Dives to Complete

    Length of Extension(s)

    Date(s) of Dive(s)

    Drilling Issues?

    Dive numb er(s) for current campaign

    ) 4 .41_

    °rif ling Issues: include torque spec

    not met, modif ied screws, modMad assemb ly. etc...

    South End

    orth End

    Tape Counts

    UnkQuest Northi

    ng

    LlnkQuest Fasting

    Digital File Filenam

    Digital File Time

    Display Tim

    e

    Bottom Type at Repai

    r

    Highest Span Height

    TD O'clock Positions

    r

    Y7

    0

    - - 1 3k,

    ,•3-7

    _

    q 09 73

    g

    35

    c ; k 1 0 0 3 6 .

    -

    9 Os

    c

    57. 4 1

    ) 5 51 '19

    . I 9

    ‘c, c'S I/00

    4

    1, 0 5

    19 ssIca‘a L

    NP.1

    v3

    - - 7

    s--ys-

    C-I el

    CI 4 y

    Cl

    cy

    _

    1

    •> t 5

    - `

  • 8/17/2019 Span Repair Logs 523683 7

    5/17

    Straits of Ma ckinac Structural

    Integrity Supp ort Span Rep air

    Log

    Veolia ES Spec. Serv. 14902595.10.071

    Che, s

    fR,

    c

    .,j

     

    Enbridge Project

    nbridge Project M anager

    Enbridge on-site Rep

    Survey Geodetic Parameters

    Grid

    Zone

    Survey Units

    Ellipsoid

    GPS Correction

    Qty of S atellites

    RTK

    Fix

    MINI-19972-10

    Contractor

    7

    caw r

    Contractor Project Number

    S

    ye C._

    Contract sup ervisor

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rale

    N

    A c,

    Density

    Time System for Tons Shutdown

    Span

    Information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span (s)

    Addit. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    q-id--1.

    St

    l

    .aac)

    kli 5i

    uo-s-c

     

    b

    P-,

    It.. 1

     

    . . . . . .1

    .tor

    t - t e h e t . . \

    Current Year Span Length

    Previous Year S pan Len

    gth

    Number of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    Id '-/

    )(PI

    0

    19 )5  

    Anch or Positions

    Digital File Name or DVD

    Issues: Include torque spec not oval modified screw s, manned assembly, etc...

    South End orth End

    e air

    Tape Counts

    LinkQuest Northi

    ng

    LinkQuest Easting

    Digital File Filenam

    Digital File T ime

    Display Time

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

    r

    o: -V

     

    et ,ot..

    A 0

    _

    117.n.. .

    I1

    ‘k : : a k . i I C

    m 1 5

     

    14, (1

    -  

    is

    .

    5 5 -

    5k5S. i5

    f S

    -  3 W E P T

    '15‘1 S Li 1, st.

    0 ',5,01.

    'l tl°

     

    )-, -5.1

    6

    -

    p 1 . )

    c0

    ci0

    3'

    \

    . . . .

    Span Repair Sketch:

    Include North arid South natural ID's. previously installed repairs. repair numbers. debris/t ash. natural outcrops, and hardline diver's measurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    6/17

  • 8/17/2019 Span Repair Logs 523683 7

    7/17

  • 8/17/2019 Span Repair Logs 523683 7

    8/17

    Enbrtdge

    roject nbridge Project Ma nager

    MN-19972-10

    ;:Nian, WW.

    Contractor

    ontractor Project Number

    Pipeline Operation information

    Is leg shutdown?

    l

    If so, date shutdow n

    l ime Shutdown

    Product In Line

    If flowing, flow rate

    Enbrldge on-site Rep

    Contract supervisor

    Density

    lime System for l ime Shutdown

    AlA

    C

    A j4 Q

    Survey Geodetic Parameters

    j rid

    Zone

    1Sunrey Units

    Ell ipsoid

    GPS Correct ion

    Qty of Satellites

    RTK Fix

    Veolia ES Spec. Serv. 1400259S.10.071

    . V r

    Span Repair Sketch:

    include North and South natural ID's, previously Metalled repairs, repair numbers, debris/Sash, natural outcrops, and hardline diver's measurements.

    Notes:

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Span Informat ion

    Date Surveyed

    Anchor Positions

    Tape Number

    P

    Direction Flown

    S

    A/

    Digital i le

    Name or DVD

    Water Depth

    Current Year Span

    3, Current Year Span Length

    9

    Previous Span (s)

    k n i

    . .

    Previous Year Span Length

    9

    Addit. Extensions Used?

    Num ber of Dives to Complete

    Length of Extension(s)

    .1

    Date(s) of Dive(s)

    -1T-tx

    Drilling Issues?

    VOA L

    Dive number(s) for current campaign

    Drilling issues: Include torque spec not mat. modified screws. mod Med assem bly, etc...

    South End orth End

    ep

    a

    ir

    r_.

    . . . v

    3

     

    '.ti

    0 ()

    i

    /03

     

    f0 tl 71 0 2-

    O

    V1

    ..

    ,

    qs

    ( c

    `g1551 

    0

    c

    1511

    ,

    0

    10 , 7 1

    I . ScZ1 Z 4.4

    A

    m - 1

    -- 

    0'. 50

    o..9`?

    i

    1-

     

    0; 5

    c v , 1 - 1 ( 1

    .

    tiO

    E

    poo

    Tape Counts

    UnkQuest Northing

    LinkQuest Easting

    Digital File Filenam

    Digital File Tim

    e

    Display Time

    Bottom Ty pe at Repair

    Highest Span Heigh

    t

    TD O'clock Positions

  • 8/17/2019 Span Repair Logs 523683 7

    9/17

    q-a\

    505-

    KA

    L.)

    ( , 9

    ol

    1

    0

    11,f ilsk ck

    Enbrldge Project nbridge Project Manager

    (WJP.1-19972-14

    Contractor

    Pipeline Operation information

    Is leg shutdown?

    tto

    I f so, date shutdow n

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Enbrldge on-site Rep

    Density

    Time System for Time Shutdown

    Survey Geod etic Parameters

    Grid

    Zone

    I Central 2112

    Survey Units

    .S. Feet

    Ellipsoid

    GPS Correction

    Qty of Satellites

    RTK Fix

    I

    Sc, e

    Contractor Project Numb er ontract supervisor

    Veolia ES Spec. Serv.

    90259S.10.071

    TC ol

    r

    Ai

    tr t—

    90

    3

    -2I-)a

    Span Information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span (s)

    Add it. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    Anchor Positions

    Digital File Name or DVD

    Current Year Span Length

    Previous Year Span Length

    Number of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    Straits of M ackinac S truc tural

    Integrity Support Span Repair Log

    Drilling Issues include torque spec not met, modified screws, modified assembly, etc...

    South End

    orth End

    epair

    A/

    A

    / 1 1 4

    IcSci

    11

    Aci

    gt)

    cu.5 

    17, rs

    9 r5 ATo. fao

    les Vlial.119_

    le

    1 o i s ia o )

    ati.:1

     

    _

    .ter

    NA.

    A

     

    N - 4 -

    .fir

    ckv

    Cisy

    s

    y

    3 -

    T

    -

     

    /

    Tape Counte

    r

    UnkQuest Northing

    UnkQuest Easting

    Digital File Filenam

    e

    Digital File Time

    Display Time

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

    Span Repair Sketch:

    Include North and South natural TD s, previously installed repairs, repair numbers, debrisfErash, natural outcrops, and hardline diver s measurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    10/17

     

    y

    Contract supervisor

    I

    v e

    d

    COntractor Project Number

    Pipeline Operation Information

    Is leg shutdow n?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    No

    N A

    A A

    Dens4

    Moe System for Time Shutdown

    Enbridge Project

    nbridge Project Manager

    Enbrtd eon site Rep

    I W J P . 1 1 9 9 7 2 1 0

    Contractor

    Survey G eodet ic Parameters

    Grid

    one

    Survey Uni ts

    Ellipsoid

    GPS Correct ion

    Qty of Satellites

    R11( Fix

    SP NAD 83)

    Ml Central 2112

    Veolia ES Spec. Serv. 14902598.10.071

    Current Year Span Length

    05

    Previous Year Span Length DO

    Num ber of Dives to Complete

    Date(s) of D ive(s)

    Dive number(s) for current campaign

    2  

    Anchor Positions

    Digital File Name or D VD

    Straits of M ackinac Struc tural

    Integrity S uppo rt Span Repair Log

    Span information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span (s)

    Add it. Extensions Us ed?

    Length of Extension(s)

    Dril ling Issu es?

    9

    -a

    b - - ) ? - - -

    .s 0

    s-

    A d

    ..-

    k - - ) - - -- -

    /a. 4

    ,

    o-

    1A

    '.,

    \-3 -c „

    A0

    Drilling Issues: include torque spec not rnel, maned acme% m ast/ assembly, atm..

    South End

    orth End

    epair

    Tape Counts

    UnkQuest Northi

    ng

    UnkQuest Easting

    Digital File Filenam

    Digital File Time

    Display Tim

    e

    Bottom Type at Repai

    Highest Span Height

    TD O'clock Positions

    r

    G \ L . . 1 3

    yaAa

    ,pYie

    9-laa3(4, t

     0

    ck1.3 5- 7

    9i

    d c 7

    of

    c 5S

    3'3

    n,-7iJ

    1

    V11 t i R. 1

    o

    lc

    / 5

    fc33 3

    OA

    I irs ti

    I LI ',

    vs

    19:Ai

    14

    .1 e1

    ik 

    '.'

    1

     

    4

    Al

    C.-{e•/

    C i s y

    C I

    coi

    _

    -N

    1

    a

    Span Repair Sketch:

    Include North and South natural T6'5, previously installed repairs, repair numbers, debrisAresh, naturist outcrops, and N udgee d ivers measurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    11/17

    Enbridge Project

    ntrildge Project Manager

    1WJR1-19972 -10

    Contractor

    Pipeline Operation Information

    Is leg shutdow n?

    If so, date shutdown

    A

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Enbridge ons i te Rep

    Coneact supervisor

    Density

    Time System for Tone Shutdown

    Tom

    PretJ

    Contractor Project Number

    4 0

    Survey Geodetic Parameters

    Grid

    Zone

    Survey Units

    Ellipsoid

    GPS Correct ion

    Qty of Satellites

    RTK Fix

    SP NAD 83

    MI Cen tral 2112

    U.S. Feet

    eolia ES Spec. Serv. 14902595.10.071

    '..1.1eL q v,/

    Notes:

    Span Repair Sketch:

    Include North and South naturallD s, previously instated repairs, repair numbers, debristbash, natural outcrops, and hardline divers measurements.

    Straits of Mac kinac S truc tural

    Integri ty Su pport Span Repair Log

    Span Information

    Date Surveyed

    Tape Number

    Anchor Positions

    si

    Direction Flown

    Digital Fite Name or D VD

    Water Depth

    SO

    Current Year Span

    Current Year Span Length

    9'3

    Previous Span (s) Previous Year Span Length

    cg)

    Add it. Extensions Used ?

    Num ber of Dives to Complete

    Length of Extension(s) Date(s) of Dive(s)

    -A

    Drilling Issues?

    /1 0

    Dive number(s) for current campaign

    30

    Dril l ing Issues: inc lude torque spec not met, mod if ied screws, MOW assem bly ,

    South End

    orth End

    ep

    a

    ir

    OOoO

    `V 3 .)

    3

    cloboycl

    lci

    co0 90 g7

    ‘iobilk), -10

    1a 515a '35,̀ 71

    1CFSM64 DI

    I

    c

    ?5

     

    grAct

    cc

    E S

    _

    iq:osk

    IV;oe

    mom

    icoa,

    ig ot

    1F 09

    544.6

    ic-kv

    ,.;;,, ..)

    A-Ay

    ,v,20,

    ,

    cpy-  

    Tape Counte

     

    LinkQuest Northing

    LinkQuest Fasting

    Digital File Filenam

    e

    Digital File Time

    Display Time

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

     

  • 8/17/2019 Span Repair Logs 523683 7

    12/17

    Enbridge Pmject

    1WJPJ-19972-10

    Contractor

    Enbridge Project M anager

    I Tow efe0

    Contractor Project Number

    Enbridge on-site Rep

    I

    ccoeett-

    Contract supervisor

    Anchor Posi t ions

    Digital File Name or DVD

    ••••••••

    \-u

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Sur vey Geo det i c P ar ameter s

    Grid

    Zo n e

    Survey Units

    E l l i p s o i d

    G P S Correc t ion

    City of Satell ites

    RTK Fix

    MI Centra l 2112

    Veolla ES Spec. Serv. 14902595.10.071

    Pipel ine Operat ion informa t ion

    is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    / V A

    ivA

    o

    Densi ty

    Time System for Time Shutdown

    Span Information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span (s)

    Addit. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    Drill ing Issues: include torque spec not reel, mo dified screws, modified assembly, etc...

    South End

    Current Year Span Length

    00

    Previous Year Span Leng th

    Number of Dives to C o m p l e t e

    Date(s) of D ive(s)

    -r- \

    Dive number(s) for current campaign

    S

    North End

    epair

    -6),1-• P-

    s p

    s- V

    0 S 

    0

    vi -

    -

    PoiS

    No

    Tape Counts

    UnkQuest Nor thing

    LirikQuest t=asting

    Digital File Filenam

    Digital File Time

    Display l ime

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

    r

    c)., tsc

    3:

    s

    ( . .

    0.

    S‘ P1

      1 ,

    I1 ..

    t.i..\ \, ;A

    \

    .--

    A ')

    ,

    .T , -I

    1 t t CI 11 t

    ,   4 1

    5 551 Al

    , 0.1

    e

    l 5-, 1

    3s— S , c ) v i

    .......

    ,,. .-

    v3:. •)

    3:61

     

    3: ts 5

    l ,4Y),

    3:01

    ; ts

    i

    t

    od i

    1 . 0 . , , , A

    ;,,o0

    q

    `t

    .

    ,

    Span Repair Sketch:

    Include North en d South n atural TM, previously installed repairs. repair numbers. debris/Sash, natural outcrops, and hardline diver's m easurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    13/17

    Survey Geodetic P arameters

    (Grid

    Zone

    Survey Units

    Ellipsoid

    GPS C orrection

    Qty of Satellites

    RIK Fix

    SP

    ( N A D

    83

    MI Central 2112

    Pipeline Op eration information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Density

    Time System for rime Shutdown

    Er

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Enbridge P roject

    nbridge roject Manager

    c S Al C1

     

    0

    Contractor Project Nu mber

    Veolia ES Sp ec. Serv. 1490259S.10.071

    V 1 1 1 1

     

    .149972-10

    Contractor

    I 'cume 

    Contract supervisor

    Enbridge

    OThade

    Rep

    Span Information

    Date Surveyed

    x x

    Anch or Positions

    Tape Number

    S

    Direction Flow n

    5-

    Digital File Name or DVD #

    Water Depth

    Current Year Span

    it

    e l

    Current Year Span Length

    cla

    Previous Span it s)

     

    Previous Year Span L ength

    Addit. Extensions Used?

    IF

    Number of Dives to Complete

    Length of Exiension(s)

    Date(s) of Dive(s)

    Drilling Issues?

    la

    Dive number(s) for current campaign

    Dri l l ing Issues: nude torque spec not met m odi f ied mews, m odi f ied assembly.

    South End orth End

    e ir

    Tape Counts

    UnkQuest Northi

    ng

    UnkQuest Easting

    Digital File Filenam

    Digital File Time

    Display Time

    Bottom Type at Repelr

    Highest Span Height

    TO O'clock Positions

    r r . t

     

    tiolit5

    -

    vo.).

    v A 1

    I 'IV' woo to , '

     

    .q

    15 1;44,

    t

    oNTST314,4

    0

    . . . . . -

    \ r)

    k, IT

    tv',15

    \V

    S tir

    015

    tott)

    ' ,Vic)

    A 0

    Span Repair Sketch:

    Include North and South natural TD s, previously installed repairs. repair numbers, debris/bash, natural outcrops. and hardline diver s m easurements.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    14/17

    MI Central 2112

    Survey Geodetic Parameters

    Grid

    P (NAD 83)

    Zone

    Survey Units

    Ellipsoid

    GPS Correction

    Qty of Satellites

    FOX Fix

    111

    Pipeline Operation Infommflon

    Is leg shutdown?

    If so, date shutdown

    lime Shutdown

    Product In Line

    If flowing, flow rate

    Enbridge Project

    nbridge Pro ect Manager

    I W J R . I 1 9 9 7 2 1 0

    Contractor

    Veolia ES Spec. Serv. 1490259S.10.071

    Enbridge on-site Rep

    Contract supervisor

    ut/

    Density

    Time System for Tam Shutdown

    TO

    h1

    PreA--)

    Contractor Project Number

    AiA

    Current Year Span Length

    Previous Year Span Length

    Numb er of Dives to Complete

    Date(s) of Dive(s)

    91

    65

    -

    1 ) -

    Dive number(s) for current campaign

    5 5

     

    - lot c

    Straits of Mackinac Structural

    IntegriV Support Span Re air Log

    Span information

    Date Surveyed

    Tape Number

    Direction Flow n

    Water Depth

    Current Year Span

    It

    Previous Span (s)

    Adrift. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    •Drilling Issues: include torque spec not met, modified screws, modified assembly, etc...

    Anchor Positions

    Digital File Name or D VD

    -D_I -a

    St-

     

    s_,)

    if

    - is

     

    .-- s1 c

    F. . . -0 c

    1

    : -- - ,

    A/o

    South End

    orth End

    epair

    Tape Counter

    UnkQuest Northing

    LinkQuest Easting

    Dig ital File Filename

    Digital File Time

    Display lime

    Bottom Type at Repair

     

    Highest Span Height

    TD O'clock Positions

    o

     oo

    q /°

    I.. -s 5-

    _

    9 L 1?-10, I o

    co ,

    --

    ls

     

    . . , b a _

    -

    1

    3aC.c3

    9

    5 v i 3 f . s

    . t

    ;  >35- 

    I 9 5

    -

    55 t.111, 7b

    _ _ _ _

    1 c Y Y .

    16:5 FS

    in.35 

    /c ) : F

    t o :145

    / C :, 5'

    ..-

    C 1c1

    I

    el

     

    Cl. ; Y

    \

    Span Repair Sketch:

    Include North end South natural nes, previously Installed repairs, repair numbers, dobrisArash, natural outcrops, and h ardline diver's measurements,

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    15/17

    Survey Geodetic Parameters

    (Grid

    Zone

    Survey Units

    Ellipsoid

    GPS Correction

    Qty of Satellites

    RT Fix

    MI Central 2112

    Veal's' ES Spec. Serv. 1490259S.10.071

    ar,' 4 gqi)of

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    l ime Shutdown

    Product In Una

    If flowing , flow rate

    No

    A L A

    N4

    Density

    Erna System far Erne Shutdown

    Enbridge Project

    nbridge Project M anager

    Enbridge on-site Rep

    It/Mt 19972 10

    Contractor

    I Tun

    POLO

    Contractor Project Number

    C5 rrle

    Contract supervisor

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Span information

    Date Surveyed

    Tape Number

    Direction Flown

    Water Depth

    Current Year Span

    Previous Span Ws)

    Addit. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    9,--a- \I-,

    SO t

    5-N

    1a-c-

    t

    1

    —•3 ' .

    `

    i

    -1'

    Current Year Span Length

    Previous Year Span Length

    Number of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    1 6

    1

     

    \

    9-a '11

    6

    Anchor Positions

    Digital File Name or DV D

    Drilling Issues: Include torque spec not wet, mod ided screws, mud died assembly. etc...

    South End orth End

    epair

    Tape Counter

    LinkQuest Northing

    UnkOuest Easting

    Digital File Filenam

    e

    Digital File Time

    Display Time

    Bottom Type at Repair

    Highest Span Height

     

    TD O'clock Positions

    13:a3

    1 6 ' . o s . . ) - , 1 11 .v

    cil of-rib, D)

    q io4

    ci,

    t

    `1t 1 •K‘,

    -

    74

    ..

    t e 5-

    5v--)36,

    al

    cir5

    1

    4 1 4 ) ,

    C''?q i's?

    .daP

    ---

    .

    I Y 5 Ll

    11,'

    ,

    51

    1

    -3S5

    15: 51

    r3 5

    1

    tbtV5

    C44

    i

    CA kf

    CisY

    ON

     

    i c : D ‘

    1 , ‘

    Span Repair Sketch:

    Include North and S outh natural ID s, previously installed repairs. repair numbers, debris/1mb, natural ou tcrops,

    and

    hardline diver s measurem ents.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    16/17

    Survey Geodetic Parameters

    Grid

    Zone

    'Survey Units

    Ellipsoid

    GPS Correction

    Qty of Satellites

    FOX Fix

    Anchor Positions

    Digital File Name or DV D

    Current Year Span Length

    Previous Year Span Length

    Numb er of Dives to Complete

    Date(s) of Dive(s)

    Dive number(s) for current campaign

    •ct

    17

    - 1 6 0 3

    Straits of Mackinac Structural

    Integrity Support Span Repair Log

    Enbridge on-site Rep

    nbridge Project

    nbridge Project Manager

    1WJPJ-19972-10

    am

    prt41

    Contractor

    ontractor Project Number

    1Veolia ES Spec. Serv. 14902595.10.071

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If flowing, flow rate

    Are

    414

    I

    cill 4

    Contract supervisor

    Density

    Time System for T ime Shutdown

    Span Information

    Date Surveyed

    Tape Number

    Direction Flow n

    Water Depth

    Current Year Span

    Previous Span (s)

    Adrift. Extensions Used?

    Length of Extension(s)

    Drilling Issues?

    s 5

    N

    ) s5

     

    k _ J

    - -,, 0_5

    ‘,3

    --606

    c _ 3

    --

    ‘•

    00

    O d h T l n

    Issues: include torque spec not met mod ified screws mod ified assembly. etc...

    South End orth End

    e air

    Tape Counts

    Linkauest Northing

    UnkQuest Easling

    Digital File Fitenam

    Digital File Time

    Display Time

    Bottom Type at R epair

    High est Span Height

    TD O'clock Positions

    G 4

    -

    R1

    - 1

    - ll

    .1

    66

     

    6101 \ 6

    1 C r 1 ) ,

    l)

    1 ci t

    Z

     

    I

    6

    i c l Vit la,a)-

    19S-5.180,°,1`)

    . . . . . -

    ,

    1

    9  11

    15 • ir

    1

    yn

    clky

    _

    tcv

    (1,

    1

    1‘

    c , ` •

    a •

    Span Repair Sketch:

    Include North and South natural T6 s prevfously installed repairs rep air numbers. debris/Ma. natural outcroes and hanlline divers MeaS Urernents.

    Notes:

  • 8/17/2019 Span Repair Logs 523683 7

    17/17

    Contractor Project Number

    Contract supervisor

    ontractor

    C kee

      s

    t /

    eolia ES Spec. Serv. 14902598.10.071

    SP

    (NAD

    83

    MI Central 2112

    Grid

    Zone

    Survey Units

    .S. Feet

    Ellipsoid

    GPS Correction

    Qty of Satellites

    RTK Fix

    -HA

    Straits of Mackinac Structural

    rity Support Span Repair Log

    Enbridge Project

    nbridge Project Manager nbridge on-site Rep

    Inte

    Survey Geodetic Parameters

    Pipeline Operation Information

    Is leg shutdown?

    If so, date shutdown

    Time Shutdown

    Product In Line

    If towing, flow rate

    A

    Ai

    WJP.1-19972-10

    Density

    Time System for Tone Shutdown

    Span Information

    Date Surveyed

    Tape Number

    Anchor Positions

    i -01

    s

    Direction Flown

    3

    D igital File Name or DVD

    Water Depth

    Current Year Span

    L a m . A

    Current Year Span Length

    C4 a

    Previous Span (s)

    trii 4

    Previous Year Span Length

    s

    Addit. Extensions Used?

    Ye

      1

    Number of D ives to Complete

    Length of Extension(s)

    Drilling Issues?

    1-2k

    Date(s) of D ive(s)

    Dive number(s) for current campaign

    1),

    NO

    3c

    • rilling Issues: include torque spec not mat, modified screws, modified assembly, elm..

    South End orth End

    enal

    Tape Counts

    UnkQuest Northin

    LinkQuest Eastin

     

    Digital File Filenam

    Digital File Tim

    e

    Display lime

    Bottom Type at Repair

    Highest Span Height

    TD O'clock Positions

    16(

    4

    -11, VT

    0\ 0,;;Y`c,Ilo

    0 i g

    tl, C;1

    5

    I c 7 V.1

    -

    1 VJi c.

    1

    e

    N

    4

    K41. In

    is 51

    .

    . )L..)

    .....,

    fllw....

    -

    1111

     

    \ I

    '

    I l .1?)

    -

    11:11

    11.11

     

    /1 4

    ci

    cle,y

    c i c y

    Span Repair Sketch:

    Include North and South natural ID's, previously Installed repairs, repair numbers. debris/Hash, natural outcrops, and hardline diver's

    m e a s u r e m e n t s .

    Notes: