SPAIN 2013 Mineral Exploracin Network
-
Why Spain?Prospective geological situationLandscape conditions allow quick prospectingExcellent infrastructurePossibility to work during winter and use MEN Finland human and technical resources all year around
-
Project Extremadura Area of interest is located on the intersection of NW striking regional thrust zone and corridor of faults of SW orientation.
-
Pro Mining GovernmentQuick and transparent licence application processEasy available geological informationProject Extremadura
-
Long mining history starting from prehistoric time till the middle of 20th centauryAugustobriga - Talavera la ViejaProject Extremadura
-
Augustobriga - Talavera la ViejaProject ExtremaduraProject licenses123451 Trojillo Logrosan, prospecting license, 945 sq. km.2 Maria exploration license, 78 sq. km.3 Antonio exploration license, 85 sq. km.License Applications:4 Berzocana exploration license, 84 sq. km.5 St. Cristobal exploration license, 63,7 sq. km.Total: 1.255,7 sq.km.
-
Project area is located in inner zone of multistage volcanogenic ring complex active from pre Cambrian till Tertiary period
Radiometric survey -PotassiumMagnetic survey vertical componentProject Extremadura
-
Project ExtremaduraExploration model
-
Historical mines:
"El Aguijn. Operational 1850-1950. Zn, Pb, Ag, Au"La Favorita": Cu, Py, P "El Aguijoncillo": Mining stopped in 1904. Sb, Cu, Au."El Piojo": Mining stopped in 1876. Zn, Pb."El Serranillo": Mining stopped in 1970. As, Sn, Mo. La Costanaza: Operational in 1907-1946. Phosphorous.
6Project Extremadura
-
By 30th of November following work was done:
Stream sediments sampling- 3014 samples Soil sampling - 17053 samples Magnetic survey - 680 line km Pan concentrates - 69 samples
MEN Finland had started full scale prospecting in September 2013Project Extremadura
-
Project Extremadura1 mm1 mm1 mm1 mm1 mm1 mm1 mm1 mm
-
Results of soil sampling and ground magnetic survey,Logrosan area.Detailed areaProject Extremadura
-
ABABProject Extremadura
-
Project ExtremaduraOur plansMinimumMaximumFinalize stream sediment sampling on existing licensesCarry out magnetic survey and soil sampling on selected targetsLimited trenching
Minimum +
Expand ground holdingIntensive trenchingVerification drillingResource drilling Spring 20142014 - 1 M Euro 25% of the project
2015 - 2 M Euro 25% of the projectBy own financial resourcesWith JV partner investment
**