Space Shuttle Program Transition Structure
SSP/ Lee Norbraten
February 15, 2006
TCB
Decision Filters “Leveraging off existing Structures””
SOMD/ESMDTransition WG
Filter #1
TCB
Integrat ion
AgencyIntegration
Filter #3 Filter #4 Filters #5,6,7
Directorate LevelProgram Level Agency Level
ET/US
SSME/USE
SRB/FS
Orbiter/CEV
L&L
RSRM/FS
MOD
FCOD
Integration
Integration
Integration
Filter #2
Project Level Center Level
Filter #1
S S
P
Integrat ionOther Support
Orgs
J. Olansen
Lightfoot, Norbraten, Thomas, Lucht, SSP/MD
G. Jacobs
S. Coleman
Gerstenmaier, Horowitz, Hubbard
Hawes, Hilding, West
SSP Transition Leadership Structure
SSP Transition ManagerRobert Lightfoot
LeRoy Cain
JSC Transition IntegrationJon Olansen
KSC Transition IntegrationGeorge Jacobs
MSFC Transition IntegrationSandy Coleman
Shuttle Business OfficeKaren Lucht
Wayne Thomas
Strategic Planning OfficeLee Norbraten, ManagerDoug Sander, Assistant for
Transition Integration
Human Capital OfficeSue Leibert
The Role of the 3 Center Reps
• “The finger on the pulse”- The primary channel between program and project on transition issues.
• Coordination with the elements and organizations at their respective centers.
• Coordination with center management on transition issues that affect the centers.
• Establishment of common tools, formats, and terminology.
• Advocacy for center unique transition issues.
Matrixed Transition Organization StructureP
rod
ucts
Re
qu
irem
en
ts
Processes
ElementsCross-Cutting
Functions
SOMD
Program
Centers
Orbiter MOD …. SSME SRB … L & L Log ….
Property
Environment
Human Capital
Records
JSC(Olansen)
MSFC(Coleman)
KSC (Jacobs)
SOMD Transition Manager
(Hawes)
Transition Manager (Lightfoot) Program Integration: Norbraten/Sander
Agency Transition Control Board
SSP Transition PRCB
Gerstenmaier Horowitz O’Connor Hubbard Lightfoot
SSP Cross-Cutting Support Functions
• RESOURCE PLANNING & ANALYSIS Karen Lucht
• CONTRACT MANAGEMENT Wayne Thomas
• HUMAN CAPITAL PLANNING Sue Leibert
• COMMUNICATIONS PLANNING Ashley Stockinger
• ENVIRONMENTAL PLANNING Steve Glover
• PROPERTY DISPOSITION Doug Sander
• HISTORICAL PRESERVATION TBD
• Cx TECHNICAL INTERFACE Mack Henderson
SSP/ Constellation Program Interfaces
• We are inviting Constellation participation in our emerging “Program Transition Control Board”
• We are active representatives to the “Constellation Program Control Board”
• We are active participants in their program and project level design reviews
• We are providing Shuttle background and lessons learned to key members of their leadership
• Constellation has named Scott Gahring as the liaison to the Shuttle and Station Programs
Transition Forward Activity
DOCUMENTATION- Working with SOMD/ESMD on an agency-level transition plan
STRATEGIC ASSESSMENT- Gathering key information on our capabilities and last need dates
BOARD STRUCTURE- First planned Program TCB scheduled for February 8
COLLABORATION- Working with Constellation counterparts at all levels
ANTICIPATION- Building a projection of when assets and capabilities can be transitioned or terminated
Transition Program Requirements Control Board (TPRCB) Status
SSP/ Lee Norbraten
February 15, 2006
TCB
Hierarchy of Transition Forums
(HQ) STRATEGIC MANAGEMENT COUNCIL
Establishment of Agency Policy
(SOMD/ESMD) JOINT INTEGRATION CONTROL BOARD
Co-Chaired by Gerstenmaier and Horowitz
Strategic Collaboration
(SOMD/ESMD) TRANSITION CONTROL BOARD
Co-Chaired by Gerstenmaier and Horowitz
Tactical Transition Decisions
(SSP) TRANSITION PROGRAM REQUIREMENTS CONTROL BOARD
(TPRCB)
Chaired by Lightfoot
Programmatic Transition Decisions
TPRCB Overview
• The TPRCB is formally established as a new board within the Shuttle Program Board Structure
• Chaired by Shuttle Deputy Program Manager (Lightfoot)
• Meets biweekly (2nd & 4th Weds., 10:30-12:30 CST)
TPRCB Authority and Responsibilities
a. Approve and baseline SSP transition requirements.
b. Establish and control baseline budgets and schedules for transition.
c. Disposition Space Shuttle Management Resource Transition Documents (SMRT)/transition-related decision packages.
d. Review and forward, to the HQ/Transition Control Board, SMRT/transition-related decision packages that exceed SSP budget authority and/or include issues/impacts that are external to the SSP and exceed its authority.
e. Conduct a quarterly Transition Program Management Review (QTPMR) that reviews the status of transition planning and implementation - including transition risks, issues and metrics.
f. Approve waivers, deviations and exceptions to program transition requirements.
TPRCB Status
• TPRCB will be formally chartered at the Shuttle PRCB– The charter change request (CR) is on the PRCB agenda for the
February 23rd
• One “unofficial” TPRCB was held on February 7th
– Agenda item was Environmental Assessment funding request• Action: further review required
• Next TPRCB is scheduled for February 24th
– Pending (not scheduled) agenda items include:• Environmental Assessment funding request• MOD cost sharing between programs• Santa Susana closeout decision package• Palmdale closeout decision package
• Website– http://sspweb.jsc.nasa.gov/meeting/TPRCB/