    Contractor

    Project Title

    Westfalia Separator Food Tec

    Description

    Pump data sheet

    Centrifugal pumpRef

    Isolux Ingeniera S.A.Customer

    LOG-WS-DSP-463-3-001

    ISOLUX Biodiesel Plant Logroo

    9110

    Westfalia Separator

    Food Tec GmbH

    Pag. 2 / 2

    61

    62

    6364

    65

    66

    67

    68

    69

    70

    71

    72

    73

    74

    75

    7677

    78

    79

    80

    81

    82

    83

    84

    85

    86

    87

    88

    8990

    91 Surface treatment

    92

    93

    94

    95

    96

    97

    98

    99

    100

    101

    102

    103

    104

    105

    106

    107

    108

    109

    110

    111

    112

    113

    114

    115

    116

    117

    118

    119

    120

    121

    Motor data

    0.37

    DIN EN 50014

    PTC thermistor

    Painting

    Speed (min-1)

    Power (kW)Manufacturer

    Ex design

    Protection type

    ATEX II 2/2G

    (1)FISO class

    Final coating must be resistant against organic solvent, Biodiesel, organic and

    Parts list

    Fabrication schedule (after order)

    Sandblasting Grade SA 2.5

    Sealing casing

    Materials

    Shaft sleeve Heating system

    1.4408 (CF8M)

    Base frame

    Shaft

    2 x epoxy-polyamide ground coating thickness 50 m each

    - Carbon steel parts:

    Transportation, erection and operation manual

    Pressure test report DIN EN 10204 - 2.2

    50

    III

    - Stainless steel parts: Matt finished pickling and passivation, washing until neutral conditions.

    Material inspection certificate DIN EN 10204 - 2.2

    PED Module

    See Inspection and Test Plan (ITP)

    RAL 6011

    anorganic acid and caustic

    Inspection

    Frequency (Hz)

    Phase

    Voltage (V) 400

    DIN and European and Spanish standards

    Date:

    ITP Report

    Revisado por:

    (3) All flanges have to be durable technical leak proof.

    (7) Magnetic coupling prepared for a temperature sensor installation. Nozzle R1/4". Sensor diameter 6 mm

    (4) All flanges according DIN2633 PN16, Form C

    (5) All flange connections = DN200, tongue and groove according DIN2512 shape F and N.

    Groove gasket material metal/gylon

    (2) Power to be confirmed by the supplier (Min. Oversizing 20%)

    Remarks

    Codes

    Documentation

    Manufacture's declaration, declaration of conformity

    General dimension sheet

    Clutch1.4408 (CF8M)

    Cooling system

    Double jacketBearing ring

    Pump casing Pipeline1.4408 (CF8M)

    Impeller

    Carbon steel painted

    (6) Grounding latch must be mounted

    (1) To be defined by the supplier

    Gasket

    Control leakage shaft seal

    Crack

    EExe IIA T2

    IP 55

    Painting colour: RAL 6011