Calderdale WY+TF A629 Corridor Background
Sowerby Bridge Transport Study
Local desire for intervention
Political appetite for intervention
Funding opportunities
CIP (formerly HEBP)
City Connect 2
Objective-setting workshop
Calderdale WY+TF A629 Corridor Corridor Improvement Programme A58/A672
Objectives must be SMART
(Specific, Measurable, Achievable,
Realistic, Time-bound)
Must meet the specific objectives of
the CIP
Phase 1 to include work on A58 in
Sowerby Bridge
Calderdale WY+TF A629 Corridor City Connect 2: Calderdale Canals
Improvements to the Calder Hebble Navigation for 2km
between Sowerby Bridge Basin and Hallas Lane Bridge
Improvements to the Rochdale Canal Towpath: Phase
1 is Sowerby Bridge to Stubbings Bridge
Calderdale WY+TF A629 Corridor Sowerby Bridge Objective-setting workshop
Attendance: Officers from across
CMBC and WYCA with WSP
facilitators
Goal: to define objectives for
Sowerby Bridge in order to
prioritise interventions and
reconcile conflicting outputs
Calderdale WY+TF A629 Corridor Sowerby Bridge: the function of the central streets
The streets must perform these
functions
The streets could perform these
functions
Support retail Not carry long distance HGVs
Support the economy Not carry re-routed traffic from the
M62
Enable rail use Support local heritage
Enable bus use Support improved public realm
Prevent flooding Support green infrastructure
Car parking (in some cases only) Not provide as much parking as they
currently do
Enable active travel Attract people to live in the town
Calderdale WY+TF A629 Corridor Sowerby Bridge: the key driver for improvement in the town
40%
10%
50%
Facilitatingeconomic growthand regeneration
Enhancing thebuilt and naturalenvironment
Reducingcongestion
Calderdale WY+TF A629 Corridor Vision for Sowerby Bridge
50%
20%
30%
An attractive place to live whichprovides all the essentialservices its businesses need
A growing economic centre thatcapitalises on the expandingbusiness community nearby
A popular leisure destination withexcellent transport links, whichattracts visitors from across thecity region
Calderdale WY+TF A629 Corridor Challenges to delivering the vision for Sowerby Bridge
20%
20%
50%
10% Conflictingstakeholder priorities
Contradictoryinvestment goals
Transport limitationsand congestion
Insufficient funding(public and private)
Calderdale WY+TF A629 Corridor Sowerby Bridge: Six Key Objectives
Objective
Description
1 Reducing congestion to improve quality of life, attract investment and improve
public health
2 Helping the local economy to grow to meet the needs of residents and local
businesses
3 Improve the vitality of the town centre by supporting a more diverse retail and
leisure offer
4 Improving access to public transport
5 Enhancing facilities for pedestrians and cycle users to make walking and
cycling more appealing
6 Strengthening links to environmental and heritage assets such as the river
and canal
Calderdale WY+TF A629 Corridor Sowerby Bridge Town Board Vision
To create a safe, diverse, accessible destination town with:
More open spaces
Green infrastructure
Environment and community at its heart
A celebration of waterways, heritage, and unique
attributes
Attractive, diverse retail spaces and a mixed economy
A full calendar of events
Cultural and leisure facilities
Calderdale WY+TF A629 Corridor Sowerby Bridge Town Board Wishlist (selected highlights)
Better air quality
Improved access to waterways and local green sites
Strengthen bus services
Walking buses to schools
Enhanced links to the station
Improved market
More cycle paths and cycle routes
Improve retail offer, particularly food
Find uses for empty units
Strengthen the daytime economy
Enhance and signpost heritage
Provide more trees
Reduce waste