Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

28
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008

Transcript of Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Page 1: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Southside FloodProtection

Red River Channel ExtensionClay County Courthouse

September 8, 2008

Page 2: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

1997 Spring Flood –Fargo, Moorhead

Rose Coulee

Red River

Fargo

50th Avenue South

Moorhead

Univ

ers

ity D

rive

Page 3: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

1997 Spring Flood – South of Fargo

Rose CouleeRed River

25th S

treet

Sou

th

Fargo

University DriveMoorhead

60th Ave. SW

Page 4: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Preliminary 100 & 500 Year

Floodplains

Oxbow

Horace

MoorheadWest Fargo

FargoInterstate Hwy 94

Inte

rsta

te H

wy 2

9

Southside Flood

Control

Page 5: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

RED RIVER AT FARGO - USGS GAGING STATIONHISTORICAL FLOOD DATA

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000

Years of Record

50 Year Discharge - 22,300 CFS

10 Year Discharge - 10,300 CFS

100 Year Discharge - 29,300 CFS

Pea

k D

isch

arge

(CFS)

1997 Spring Flood - 28,000 CFS

Page 6: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Southside Flood Control

North Dakota State Climate Office

Page 7: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

• FEMA levees with and without diversion channels

• Channel extensions(Red River & drain improvements)

• Storage inside of project

• Storage in upstream watershed

Project Flood Control Methods

Page 8: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Base Project

Southside Flood

Control

Wild Rice River Levee

Alternative

Page 9: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Issues Raised With Base Alternatives• Red River & Wild Rice River impacts

(Higher flood levels)

• Lost storage (Concern storage impact will simply move impacts upstream)

• Properties east of Hwy 81 and upstream receive no protection

Page 10: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Base Project withChannel Extensions

& Recoverable Storage

Southside Flood

Control

Wild Rice River Levee

Alternative

Rose CouleePump Station

& Closure Structure

Page 11: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

North Dakota

Minnesota

Red River

Red RiverChannel

Extension

Typical Red River Cross-Section

Page 12: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

STORAGE SUMMARYExisting effective storage 6,000 Acre-Ft

Base project 0 Acre-Ft

Channel extension/storage 2,000 Acre-Ft

Supplemental storage 4,000 Acre-Ft

STORAGE

Southside Flood

Control

Page 13: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

100 Year Frequency - Red River Stage Changes in Inches

Base Project with Channel Extensions & Supplemental Storage

LocationWild Rice

River Levees

70th Ave So Outlet

Rose Coulee Outlet

Wild Rice River

Diversion

Wild Rice River

BypassInterstate 94 0 0 0 0 0

Rose Coulee 0 0 0 0 0

Briarwood -6 -6 -8 -6 -6

76th Avenue -7 -7 -11 -7 -7

Wild Rice River -8 -5 -12 -8 -8

Cass Hwy 16 -4 -4 -9 -4 -5

Oxbow -1 -1 -2 -1 -2

Cass Hwy 18 -1 -1 -2 -1 -1

Page 14: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

SOUTHSIDE FLOOD CONTROL

Wild Rice River Levees Alternative – Red River Impacts

Page 15: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

SOUTHSIDE FLOOD CONTROLIn

ters

tate

94

Ros

e C

oule

e

Bria

rwoo

d

76th

Ave

Wild

Ric

e R

iver

Cas

s H

wy

16 B

ridge

Cas

s H

wy

18 B

ridge

-10.0

-8.0

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

455 460 465 470 475 480 485 490

Sta

ge

Ch

ang

e (I

nch

es)

River Mile

Southside Flood ControlRed River Stage Change - 100 Year Event

Wild Rice River Levees Alternative

w/ Supplemental Storage w/ Levees East of Hwy 81

Zero Impact Line

Page 16: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River Flood Timing

Page 17: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - Average Channel Velocity Comparison

Wild

Ric

e R

iver

Cas

s H

wy

16 B

ridge

Mai

n A

ve B

ridge

Inte

rsta

te 9

4

Ros

e C

oule

e

Bria

rwoo

d

76th

Ave

nue

Sou

th

Cas

s H

wy

18 B

ridge

52nd

Ave

Bri

dge

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

450.00 455.00 460.00 465.00 470.00 475.00 480.00 485.00 490.00

River Miles

Ave

rag

e C

han

nel

Vel

oci

tyProject Existing

0.36 fps

Page 18: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - Average Channel Velocity Change

Wild

Ric

e R

iver

Cas

s H

wy

16 B

ridge

Mai

n A

ve B

ridge

Inte

rsta

te 9

4

Ros

e C

oule

e

Bria

rwoo

d

76th

Ave

nue

Sou

th

Cas

s H

wy

18 B

ridge

52nd

Ave

Bri

dge

-0.100

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

450.00 455.00 460.00 465.00 470.00 475.00 480.00 485.00 490.00

River Miles

Vel

oci

ty C

han

ge

- F

eet

per

Sec

on

d

Page 19: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - 100 Year Flood - 32nd Ave So./River Oaks Park

880

885

890

895

900

905

9103/

24

3/26

3/28

3/30 4/

1

4/3

4/5

4/7

4/9

4/11

4/13

4/15

4/17

Wat

er S

urfa

ce E

leva

tion

Existing

Project

Page 20: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - 100 Year Flood - 32nd Ave So./River Oaks Park

904.00

904.25

904.50

904.75

905.004/

2

4/4

4/6

4/8

Wat

er S

urfa

ce E

leva

tion

Existing

Levees Only

Project

0.72 Inches

26 Hours

Page 21: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - 100 Year Flood - 52nd Ave So.

885

890

895

900

905

9103/

24

3/26

3/28

3/30 4/

1

4/3

4/5

4/7

4/9

4/11

4/13

4/15

4/17

Wat

er S

urfa

ce E

leva

tion

ExistingProject

Page 22: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Red River - 100 Year Flood - 52nd Ave S./60th Avenue SW

906.0

906.5

907.0

907.5

908.04/

1

4/3

4/5

4/7

4/9

Wat

er S

urfa

ce E

leva

tion

Existing

Levees Only

Project26 Hours

3.2 Inches

Page 23: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

1997 Spring Flood – South of Fargo

Rose CouleeRed River

25th S

treet

Sou

th

Fargo

University DriveMoorhead

Page 24: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Southside Flood Control

Red River Channel

Extension Options

Page 25: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Southside FloodProtection

Red River Channel Extension Fly Through

Page 26: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

1997 Spring Flood – South of Fargo

Interstate 29

Cass

Co

Hw

y 81

25th Street S

outh

Page 27: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Project ScheduleDevelopment of options east of University DriveDevelopment of options east of University Drive April-June 2008April-June 2008

City Commission Selection of preferred base City Commission Selection of preferred base alternativealternative

July 14, 2008July 14, 2008

Public input meetingsPublic input meetings April 15 - September 2008April 15 - September 2008

Environmental AssessmentEnvironmental Assessment July – December 2008July – December 2008

Consultant SelectionConsultant Selection July - September 2008July - September 2008

Begin DesignBegin Design October 2008October 2008

CLOMR SubmittalCLOMR Submittal July – October 2008July – October 2008

CLOMR ApprovalCLOMR Approval December 2008December 2008

ROW AcquisitionsROW Acquisitions October 2008 – October 2009October 2008 – October 2009

PermittingPermitting September 2008 – April 2009September 2008 – April 2009

Special Assessment DistrictSpecial Assessment District September – December 2008September – December 2008

Begin ConstructionBegin Construction June 2009June 2009

Functional CompletionFunctional Completion March 2011March 2011

Final CompletionFinal Completion July 2012July 2012

Page 28: Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.

Questions / Discussion

Southside Flood Control