South Santa Fe PD Phase 1 Drainage Report · plan of the historical drainage basin is included in...
Transcript of South Santa Fe PD Phase 1 Drainage Report · plan of the historical drainage basin is included in...
PHASE I DRAINAGE REPORT
FOR
CONIFER COMMONS
January 27, 2020
Prepared for: PWN Architects and Planners, Inc.
4949 S. Syracuse St., Suite 320 Denver, Colorado 80237
Prepared by:
1120 Lincoln Street, Suite 1000
Denver, CO 80203 Ph: 303-623-6300, Fax: 303-623-6311
Mark A. West, P.E., CFM
Harris Kocher Smith Project No. 200115
TABLE OF CONTENTS
II. General Location and Description ............................................................................ 2
A. Location .................................................................................................................... 2 B. Description of Property ............................................................................................. 2 C. Existing Facilities and Historical Flows ..................................................................... 3
III. Major/Minor Drainage Basin ..................................................................................... 3 A. Major Basin Description ............................................................................................ 3
B. Sub-Basin Description .............................................................................................. 4 IV. Drainage Design Criteria .......................................................................................... 5
A. Regulations............................................................................................................... 5
B. Development Criteria Reference Constraints ........................................................... 5 C. Hydrologic Criteria .................................................................................................... 6 D. Hydraulic Criteria ...................................................................................................... 7
E. Stormwater Quality/Sediment Erosion Control ......................................................... 7 F. Modifications of Criteria ............................................................................................ 9
V. Drainage Facility Design ........................................................................................... 9
A. General Concept ...................................................................................................... 9 B. Specific Details ....................................................................................................... 10
VI. CONCLUSIONS ..................................................................................................... 10 A. Compliance with Standards .................................................................................... 10 B. Drainage Concept ................................................................................................... 11
VII. REFERENCES ....................................................................................................... 12
APPENDIX A – ALTA, FIRM MAP
APPENDIX B – SOILS SURVEY
APPENDIX C – SITE SUB-BASIN RATIONAL CALCULATIONS
APPENDIX D – MAJOR BASIN CUHP CALCULATIONS
APPENDIX E – WATER QUALITY AND DETENTION POND CALCULATIONS
APPENDIX F – SITE DRAINAGE PLAN
APPENDIX G – MAJOR BASIN DRAINAGE PLAN
1
I. Engineers Certification
This report for the drainage design of Conifer Commons was prepared by me (or under my
supervision) in accordance with the provisions of Jefferson County Storm Drainage Design
and Technical Criteria, and was designed to comply with the provisions thereof. I
understand that the County of Jefferson does not, and will not, assume liability for drainage
facilities designed by others.
_________________________________________________________________
Mark A. West, P.E., C.F.M.
State of Colorado Registration No. 38561
On behalf of Harris Kocher Smith
2
II. General Location and Description
A. Location
The proposed Conifer Commons project (hereinafter referred to as “Site”) is located in the
Southwest quarter of Section 13 and the Southeast quarter of Section 14, Township 6
South, Range 71 West of the 6th Principle Meridian, County of Jefferson, State of
Colorado. The property is comprised of approximately 47.12 acres of undeveloped land,
of which 16.39 acres will be developed with this project. The Site is bounded by a
shopping center to the North, a channel to the East, Pleasant Park Rd to the South, and
US Highway 285 to the West.
According to an ALTA Title Commitment prepared by Baseline, dated August 31, 2018, the
Site. An ingress egress easement (Book 2611 at page 911) exists within the Southeast
corner of the property. The ALTA for the site is included in Appendix A.
B. Description of Property
The Site is currently comprised of an undeveloped parcel. The 16.39-acre site is
undeveloped and consists of wooded areas and native grasses and weeds with some
sparse trees and shrubs.
The majority of the existing Site generally slopes from a highpoint in the Southwest corner
of the Site to Northeast at grades of 13% to 20% and has a total fall of approximately 140
to 150 feet. The proposed site grading will have general slopes of 2% to 6% from a
highpoint along the Western portion of the site towards the Northern end of the site.
The Site is shown to be Zone X (unshaded) Flood Area according to FIRM Map
08059C0370F, Jefferson County, Colorado, and dated effective February 5, 2014. Zone X
3
(unshaded) is described in this map as determined to be as areas of 0.2% annual chance
flood; areas of 1% annual chance flood with average depths of less than 1 foot or with
drainage areas less than 1 square mile; and areas protected by levees from 1% annual
chance flood of minimal flood hazard. A copy of the Site FIRMette map is in Appendix A.
According to the Soil Conservation Service’s Soil Survey for the Golden Area, the soils are
predominately Grimstone-Hiwan-Rock outcrop complex, 30 to 60 percent slopes (55),
Legault-Hiwan stony loamy sands, 15 to 30 percent slopes (76), and Venable loam, 3 to 9
percent slopes (171). The entire site is therefore comprised of SCS hydrologic soil groups
C & D and exhibit a moderately high runoff potential and low infiltration rate. A copy of the
Soil Survey is included in Appendix B.
C. Existing Facilities and Historical Flows
The property primarily consists of predeveloped area. Flows would historically run from
southwest to northeast across the property to a low point that runs north parallel with the
property and ultimately to North Turkey Creek. There is one 30” CMP that is shown on the
ALTA, running beneath the asphalt entrance on the western side of the property.
III. Major/Minor Drainage Basin
A. Major Basin Description
The existing major drainage basin is comprised of approximately 297.5 acres of primarily
undeveloped land consisting of wooded areas and native grasses and weeds with some
sparse trees and shrubs. The majority of the major drainage basin contains steep terrain
and slopes from a highpoint in the southwest to the northeast at grades of 13% to 20% and
has a total fall of approximately 500 to 800 feet. The Site and the major drainage basin lie
along an unnamed tributary within the upper portion of basin that is tributary to North
Turkey Creek downstream of the Site.
4
The major basin was delineated into one 297.5 acre basin with a design point in the
channel just downstream from the site. The major basin consists of highpoints to the East,
South, and West of the channel. See basin calculations in Appendix D and plan in
Appendix G. Due to the size of the basin Colorado’s Urban Hydrograph Procedure (CUHP)
was required and was used to find pre and post peak 100-year flows of 444.40 CFS and
455.84 CFS respectively.
For further reference, a plan detailing the major drainage basin is included in Appendix G,
and basin calculations are included in Appendix D.
B. Sub-Basin Description
Historically the Site consisted of one basin A-1 historic. Runoff would sheet flow southeast
to northwest across the site to the Channel on the northern end of the property. The
channel conveyed flows north beneath US 285 and ultimately to North Turkey Creek. The
calculated percent imperviousness of the historical site is 1.5%. For further reference, a
plan of the historical drainage basin is included in Appendix G, and basin calculations are
included in Appendix C.
For the proposed development the site was delineated into 1 sub-basin, A-1 developed, for
the purpose of this Report and is shown on Final Drainage Plan (see Appendix F) and
further described below.
Basin A-1 (16.39 acres) is located in the central portion of the parcel and will consist of
roof area, sidewalk, landscape area and roads. All Runoff from this basin is routed
towards the proposed full spectrum detention pond at Design Point 1 (DP-1).
5
IV. Drainage Design Criteria
A. Regulations
This report has been prepared in accordance with the following criteria.
1. Jefferson County Colorado (SDDTC) Storm Drainage & Technical Criteria Revised
June 01, 2019.
2. Urban Drainage and Flood Control District’s (MHFD) Urban Storm Drainage Criteria
Manual, Vol. 1 Revised August 2018.
3. Urban Drainage and Flood Control District’s (MHFD) Urban Storm Drainage Criteria
Manual, Vol. 2 Revised September 2017
4. Urban Drainage and Flood Control District’s (MHFD) Urban Storm Drainage Criteria
Manual, Vol. 3 Revised October 2019,
B. Development Criteria Reference Constraints
Historically the runoff from the site is conveyed un-detained and directly discharging to the
unnamed tributary to North Turkey Creek. The developed site will produce a higher runoff
volume due to increased imperviousness, and this runoff will be detained to (or below)
existing runoff rates through the addition of storm sewer and the on-site full spectrum
detention pond. Detailed Hydrologic calculations can be found in Appendix C and
Detention Calculations can be found in Appendix E.
Off – Site Flows:
Historically the Site experiences off-site flows from a highpoint west and south west of the
site. The proposed site will convey these offsite flows overland through the site. With the
final report a hydraulic analysis of the site will verify that no proposed buildings would be
inundated and that the water surface elevations of the flow through the Site are below the
finished floor elevations of any proposed structures.
6
C. Hydrologic Criteria
The method used to calculate runoff and analyze the hydrology of the site was the Rational
Method. The 5-year storm event was used as the minor storm and the 100-year storm
event was used as the major storm. One-hour point rainfall values were obtained from
Table 501 of the Jefferson County’s SDDTC for Jefferson IIB County Zone. The values
listed in Table 501 were obtained from NOAA Atlas 14.
One hours point rainfall data for the Site is listed below:
One Hour Rainfall (in.)
5-Year 100-Year
1.19 2.20
The following formula, from the MHFD Criterial Manual, was used to determine rainfall
intensities:
- USDCM Volume 1, Equation 5-1
Runoff “C” coefficients were determined using equations for soil type C/D in table 6-4
MHFD Criteria Manual Volume 1 by determining the percent imperviousness of each sub
basin based on values outlined in Table 6-3. Details of the Rational Method Calculations
are included in Appendix C & D
7
D. Hydraulic Criteria
Final details on the hydraulic design will be included with the Phase III drainage report.
The Hydraulic Capacity for the proposed storm sewer system will be designed in
accordance with MHFD Criteria Manual Volume 1, Chapter 7.
Flows will be directed to the proposed full spectrum Detention Pond by storm sewer
system or via surface drainage and roadside ditches.
As needed, inlet capacities for the 5-year and 100-year events will be analyzed using UD-
Inlet v4.05 (March 2017) assuming a clogged inlet condition. The Hydraulic Grade Line
(HGL) and head loss in the proposed storm sewer system will be designed in accordance
with the MHFD Criteria Manual Volume 1, 2 and 3.
The minimum and maximum velocities in storm sewer pipe are generally designed to fall
between 2 and 10 feet per second (fps), respectively. Hydraulic grade lines (HGLs) for the
minor and major storm will be analyzed using StormCAD V8i. The intent will be to maintain
the HGL below finished grade for all proposed storm sewer during the 100-year event.
E. Stormwater Quality/Sediment Erosion Control
On-site detention and water quality storage will be provided through the construction of a
full spectrum detention pond at the downstream point in the development area. Detention
Runoff Summary Table
BASIN TOTAL AREA
(ACRES)
PERCENT IMPERVIOUS
(%)
Q 5 (cfs)
Q 100 (cfs)
A-1
(Historic) 16.39 0% 1.36 34.90
A-1
(Developed) 16.39 55.9% 19.25 51.43
8
volumes and allowable release rates were calculated for the detained area and associated
imperviousness in accordance with the SDDTC manual. The Water Quality Capture
Volume (WQCV) was determined based on the area and imperviousness of the entire site
using the MHFD-Detention spreadsheet.
Maintenance requirements for all best management practices shall be in accordance with
the SDDTC and MHFD Criteria Manuals. The detention pond will be maintained as
recommended in Section 7.0 of the MHFD Criteria manual. The onsite water quality and
detention basin will have low to moderate maintenance requirements, but may require
significant maintenance once every 15 to 25 years.
Pond Maintenance Procedures:
Inspect the water quality and detention basin at least twice annually, observing the amount
of sediment in the forebay and checking for debris at the outlet structure. Remove debris
and litter from the detention area to minimize clogging of the outlet.
When starting from seed, mow native/drought tolerant grasses only when required to deter
weeds during the first there years. Following this period, mowing of native/drought tolerant
grass may stop or be reduced to maintain a height of no less than 6 inches (higher mowing
heights are associated with deeper roots and greater drought tolerance). In general,
mowing should be done as needed to maintain appropriate height and control weeds.
Remove sediment from the forebay and trickle channel annually. The forebay should be
maintained in such a way that it does not provide a significant source of resuspended
sediment in the stormwater runoff. Sediment removal from the micropool is required about
once every one to four years. Small micropools may be vacuumed and larger pools may
need to be pumped in order to remove all sediment from the micropool bottom. Removing
sediment from the micropool will benefit mosquito control. Ensure that the sediment is
disposed of properly and not placed elsewhere in the basin.
9
Remove sediment from the bottom of the basin when accumulated sediment occupies
about 20% of the water quality design volume or when sediment accumulations results in
poor drainage within the basin. The required frequency may be every 15 to 25 years or
more frequently in basins where construction activities are occurring.
Repair basin inlets, outlets, trickle channels, and all other structural components required
for the basin to operate as intended. Repair and vegetate eroded areas as needed
following inspection.
F. Modifications of Criteria
No modifications are being requested for this Site at this time.
V. Drainage Facility Design
A. General Concept
The majority of the Site’s flows will be intercepted by storm sewer and proposed roadside
ditches directed to the on-site water quality detention pond by private storm sewer. Flows
will be treated for water quality, detained, and released to the existing unnamed tributary to
North Turkey Creek adjacent to the Site.
The site is a single basin draining to a full spectrum detention pond, designed in
accordance with the Manual, will provide water quality treatment and stormwater detention.
The pond has been designed to discharge at the 100-year maximum release rate of 18.3
cfs. Additional orifices release the WQCV and the Excess Urban Runoff Volume (EURV) at
the required rates. The flow from these storm events will outfall through a storm sewer pipe
which will discharge to the existing unnamed tributary northeast of the Site. Erosion control
protection in the form of riprap will be placed at the outlet per MHFD criteria.
10
B. Specific Details
The detention facility provides the function of a Detention Pond and is sized to provide the
required detention and water quality volumes. The facility incorporates an outlet structure
to control the water quality release rate, paired with an outlet structure that will release
detained storm water from larger storm events from the developed site at approximately
90% of predeveloped runoff rates for multiple storm events including the WQCV, EURV, 2,
5, 10, 25, 50, and 100-year events. This is known as full spectrum detention and can
reduce urban peak discharges to levels similar to pre-development conditions for the full
spectrum of runoff events from small, frequent storms up to the 100-year event.
To provide sizing for the WQCV, EURV, 2, 5, 10, 25, 50, and 100-year detention as well as
release rates for the Detention Pond, the Detention Basin Volume Estimating Workbook,
MHFD-Detention from MHFD was used. Detention and Storage Calculations are included
in Appendix E.
Proposed Water Quality Detention Pond Summary
Drainage Area
(Acres)
Required WQCV (ac-ft)
Required 100 Year
Volume (ac-ft)
Volume Provided
(ac-ft)
100 Year Release
Rate (CFS)
16.39 0.323 1.472 2.103 18.3
VI. CONCLUSIONS
A. Compliance with Standards
This Site drainage design complies with the Jefferson County’s Storm Design & Technical
Criteria Manual, and the Urban Storm Drainage Criteria Manuals.
11
B. Drainage Concept
This drainage design when properly constructed and maintained will effectively control
stormwater runoff, in accordance with the criteria. As full spectrum detention is proposed,
the drainage design for the proposed development will not have a negative impact on the
receiving drainageway. No adverse effects to either the upstream or downstream adjacent
properties are anticipated.
12
VII. REFERENCES
1. Storm Design & Technical Criteria, Jefferson County, Revised June 01, 2019
2. Urban Storm Drainage Criteria Manual, Vol. 1, Urban Drainage and Flood Control
District, Revised August 2018.
3. Urban Storm Drainage Criteria Manual, Vol. 2, Urban Drainage and Flood Control
District, Revised September 2017.
4. Urban Storm Drainage Criteria Manual, Vol. 3, Urban Drainage and Flood Control
District, Revised October 2019.
5. FIRM map 08059C0370F, Jefferson County, Colorado, February 5, 2014, Federal
Emergency Management Agency.
6. United States Department of Agriculture, Natural Resources Conservation Service.
Custom Soil Resource Report.
APPENDIX A – ALTA & FIRM MAP
P
R
E
L
I
M
I
N
A
R
Y
P
R
E
L
I
M
I
N
A
R
Y
APPENDIX B – SOIL SURVEY
APPENDIX C – SITE SUB-BASIN RATIONAL CALCULATIONS
Project Name: Conifer Commons Composite C-Value ComputationsPost-Development
Project No: 200115Date: 01/23/20Revised:Design by: PJHChecked by:Soil Group: "C/D"
BASIN TOTAL AREA (ACRES)
ROOFS (90%) DRIVES &
WALKS (90%)
GARAGE & STREETS (100%)
LANDSCAPE AREA (0%)
PERCENT IMPERVIOUS
C2= C5= C10= C100=
DA-1 Pre 16.39 0.000 0.000 0.000 16.393 0.00% 0.00 0.04 0.13 0.48DA-1 Post 16.39 8.487 1.697 0.000 6.208 55.91% 0.43 0.49 0.55 0.71
Conifer Commons Rational Calc.xlsx
Project Name: Designed By: PJH
Project No: Checked By:
Date:
Revised:
FINAL REMARKS
BASIN AREA C5 LENGTH SLOPE Ti LENGTH SLOPE Cv VELOCITY Tt COMPOS. TOTAL Tc = (L/180) + 10 Tc
(AC) (FT) % (MIN) (FT) % (FPS) (MIN) Tc (MIN) LENGTH (MIN) (MIN)DA-1 Pre 16.39 0.04 615 15.00 19.63 1075 13.00 7.00 2.52 7.10 26.73 1,690 19.39 19.39DA-1 Post 16.39 0.49 615 2.00 21.89 1075 3.00 20.00 3.46 5.17 27.06 1,690 19.39 19.39
STANDARD FORM SF-2TIME OF CONCENTRATION
SUB-BASIN INITIAL/OVERLANDDATA TIME (Ti)
200115
Conifer Commons
(URBANIZED BASINS)Tc CHECKTRAVEL TIME
(Tt)
1/23/20
Conifer Commons Rational Calc.xlsx
Project Name: Designed By:
Project No: Checked By:
Date: Design Storm: 5 YR
Revised: 10-yr 1 hr Rainfall 1.19 IN
BASIN (s) DE
SIG
N P
OIN
T
AR
EA
(AC
)
RU
NO
FF C
OE
FF
Tc (m
in)
C x
A (A
C)
I (IN
/HR
)
DIR
EC
T R
UN
OFF
, Q (C
FS)
Tc (M
AX
)
Σ(C
x A
) (A
C)
I (IN
/HR
)
TOTA
L R
UN
OFF
, Q (C
FS)
DA-1 Pre 1 16.39 0.04 19.39 0.57 2.38 1.36 19.39 0.57 2.38 1.36DA-1 Post 2 16.39 0.49 19.39 8.09 2.38 19.25 19.39 8.09 2.38 19.25
REMARKS
01/23/20 Rational Method Procedure
DIRECT RUNOFF TOTAL RUNOFF
Conifer Commons STANDARD FORM SF-2 PJH
200115 Post-Development
Conifer Commons Rational Calc.xlsx
Project Name: Designed By:
Project No: Checked By:
Date: Design Storm: 100 YR
Revised: 100-yr 1 hr Rainfall 2.2 IN
BASIN (s) DE
SIG
N P
OIN
T
AR
EA
(AC
)
RU
NO
FF C
OE
FF
Tc (m
in)
C x
A (A
C)
I (IN
/HR
)
DIR
EC
T R
UN
OFF
, Q (C
FS)
Tc (M
AX
)
Σ(C
x A
) (A
C)
I (IN
/HR
)
TOTA
L R
UN
OFF
, Q (C
FS)
DA-1 Pre 1 16.39 0.48 19.39 7.93 4.40 34.90 19.39 7.93 4.40 34.90DA-1 Post 2 16.39 0.71 19.39 11.69 4.40 51.43 19.39 11.69 4.40 51.43
REMARKS
Rational Method Procedure
STANDARD FORM SF-2Post-Development
DIRECT RUNOFF TOTAL RUNOFF
Conifer Commons
200115
01/23/20
PJH
Conifer Commons Rational Calc.xlsx
APPENDIX D – MAJOR BASIN CUHP CALCULATIONS
DCIA
Subcatchment Name
EPA SWMM Target Node Raingage
Area(acre)
Length to Centroid (ft)
Length(ft) Slope (ft/ft)
Percent Imperviousness Pervious Impervious
Initial Rate
(in/hr)
Decay Coefficient (1/seconds)
Final Rate
(in/hr)
Level 0, 1, or
2
DA-1 Pre 100 YR 297.53 2400 4675 0.168582888 1.54 0.35 0.1 3 0.0018 0.5 0DA-1 Post 100 YR 297.53 2400 4675 0.168582888 4.68 0.35 0.1 3 0.0018 0.5 0
CUHP SUBCATCHMENTS
Columns with this color heading are for required user-inputColumns with this color heading are for optional override valuesColumns with this color heading are for program-calculated values
Maximum Depression Storage (Watershed inches)
Horton's Infiltration Parameters
Summary of 5 Year Unit Hydrograph Parameters Used By Program and Calculated Results (Version 2.0.1)
Catchment Name/ID User Comment for Catchment CT CpW50
(min.)
W50 Before Peak
W75 (min.)
W75 Before Peak
Time to Peak
(min.) Peak (cfs)Volume
(c.f)Excess
(inches)Excess (c.f.)
Time to Peak (min.)
Peak Flow (cfs)
Total Volume
(c.f.)
Runoff per Unit Area (cfs/acre)
DA-1 Pre 0.158 0.290 25.4 7.15 13.2 5.05 11.9 549 1,080,034 0.14 155,705 40.0 72 155,177 0.24DA-1 Post 0.149 0.273 25.3 6.81 13.2 4.82 11.4 551 1,080,034 0.17 186,773 40.0 80 186,275 0.27
Summary of 100 Year Unit Hydrograph Parameters Used By Program and Calculated Results (Version 2.0.1)
Catchment Name/ID User Comment for Catchment CT CpW50
(min.)
W50 Before Peak
W75 (min.)
W75 Before Peak
Time to Peak
(min.) Peak (cfs)Volume
(c.f)Excess
(inches)Excess (c.f.)
Time to Peak (min.)
Peak Flow (cfs)
Total Volume
(c.f.)
Runoff per Unit Area (cfs/acre)
DA-1 Pre 0.158 0.289 25.4 7.13 13.2 5.04 11.9 549 1,080,034 1.21 1,303,787 40.0 444 1,299,300 1.49DA-1 Post 0.148 0.271 25.3 6.76 13.1 4.78 11.3 552 1,080,034 1.24 1,337,707 40.0 456 1,334,381 1.53
Unit Hydrograph Parameters and Results Excess Precip. Storm Hydrograph
Unit Hydrograph Parameters and Results Excess Precip. Storm Hydrograph
�����
����
����
��
��
� ��
��
� ��
�
�����
����
����
��
��
� ��
��
� ��
�
5 0.00 0.00 5 0.00 0.0010 0.00 0.00 10 0.00 0.0015 0.01 0.09 15 0.01 0.1220 0.04 0.40 20 0.06 0.4325 2.52 8.01 25 3.24 9.0330 34.50 45.84 30 151.68 171.9135 65.16 76.32 35 345.88 366.7940 71.53 79.93 40 444.40 455.8445 61.08 68.49 45 444.24 451.5550 51.22 58.01 50 420.83 426.4455 41.80 48.32 55 382.91 388.0260 35.69 41.77 60 350.36 355.4465 30.28 35.79 65 322.75 327.6370 25.10 30.04 70 284.34 287.8475 19.98 24.48 75 235.43 238.1480 16.36 20.56 80 192.04 195.2785 14.10 17.83 85 160.33 163.4690 12.17 15.47 90 134.52 137.3495 10.35 13.24 95 112.98 115.44100 8.50 10.95 100 93.52 95.58105 6.62 8.59 105 75.51 77.19110 4.76 6.25 110 58.66 59.98115 2.91 3.99 115 42.98 43.96120 1.17 2.02 120 27.92 28.70
flow in cfs
5 Year Storm Hydrographs 100 Year Storm Hydrographs
flow in cfs
APPENDIX E – WATER QUALITY AND DETENTION POND CALCULATIONS
Project:
Basin ID:
Depth Increment = 1.00 ft
Watershed Information Top of Micropool -- 0.00 -- -- -- 0 0.000
Selected BMP Type = EDB -- 1.00 -- -- -- 100 0.002 50 0.001
Watershed Area = 16.39 acres -- 2.00 -- -- -- 12,000 0.275 6,100 0.140
Watershed Length = 1,605 ft -- 3.00 -- -- -- 19,000 0.436 21,600 0.496
Watershed Length to Centroid = 800 ft -- 4.00 -- -- -- 22,000 0.505 42,100 0.966
Watershed Slope = 0.150 ft/ft Steep Slope > 0.06 ft/ft -- 5.00 -- -- -- 25,000 0.574 65,600 1.506
Watershed Imperviousness = 60.00% percent Spillway -- 6.00 -- -- -- 27,000 0.620 91,600 2.103
Percentage Hydrologic Soil Group A = 0.0% percent -- -- -- --
Percentage Hydrologic Soil Group B = 0.0% percent -- -- -- --
Percentage Hydrologic Soil Groups C/D = 100.0% percent -- -- -- --
Target WQCV Drain Time = 40.0 hours -- -- -- --
Location for 1-hr Rainfall Depths = Columbine Valley - Town Hall -- -- -- --
-- -- -- --
-- -- -- --
Optional User Overrides -- -- -- --
Water Quality Capture Volume (WQCV) = 0.323 acre-feet acre-feet -- -- -- --
Excess Urban Runoff Volume (EURV) = 0.944 acre-feet acre-feet -- -- -- --
2-yr Runoff Volume (P1 = 0.85 in.) = 0.624 acre-feet 0.85 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.19 in.) = 0.999 acre-feet 1.19 inches -- -- -- --
10-yr Runoff Volume (P1 = 1.39 in.) = 1.247 acre-feet 1.39 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.65 in.) = 1.641 acre-feet inches -- -- -- --
50-yr Runoff Volume (P1 = 1.93 in.) = 2.016 acre-feet 1.93 inches -- -- -- --
100-yr Runoff Volume (P1 = 2.2 in.) = 2.423 acre-feet 2.20 inches -- -- -- --
500-yr Runoff Volume (P1 = 3 in.) = 3.541 acre-feet inches -- -- -- --
Approximate 2-yr Detention Volume = 0.601 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.959 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 1.096 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 1.219 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 1.308 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 1.472 acre-feet -- -- -- --
-- -- -- --
Define Zones and Basin Geometry -- -- -- --
Zone 1 Volume (WQCV) = 0.323 acre-feet -- -- -- --
Zone 2 Volume (EURV - Zone 1) = 0.622 acre-feet -- -- -- --
Zone 3 Volume (100-year - Zones 1 & 2) = 0.528 acre-feet -- -- -- --
Total Detention Basin Volume = 1.472 acre-feet -- -- -- --
After providing required inputs above including 1-hour rainfalldepths, click 'Run CUHP' to generate runoff hydrographs using
the embedded Colorado Urban Hydrograph Procedure.
Volume (ft 3)
Volume (ac-ft)
Area (acre)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional Override Area (ft 2)
Length (ft)
Optional Override Stage (ft)
Stage(ft)
Stage - StorageDescription
Area (ft 2)
Width (ft)
Conifer Commons
A-1
MHFD-Detention, Version 4.00 (December 2019)
Example Zone Configuration (Retention Pond)
Conifer Commons-MHFD-Detention_v4 00.xlsm, Basin 1/23/2020, 6:16 PM
Project:
Basin ID:
Estimated Estimated
Stage (ft) Volume (ac-ft) Outlet Type
Zone 1 (WQCV) 2.57 0.323 Orifice Plate
Zone 2 (EURV) 3.96 0.622 Orifice Plate
Zone 3 (100-year) 4.95 0.528 Weir&Pipe (Restrict)
Total (all zones) 1.472
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for UnderdrainUnderdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft2
Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for PlateInvert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = N/A ft2
Depth at top of Zone using Orifice Plate = 3.96 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feetOrifice Plate: Orifice Vertical Spacing = 15.80 inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = N/A inches Elliptical Slot Area = N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft) 0.00 1.32 2.64
Orifice Area (sq. inches) 1.38 1.38 3.14
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical OrificeNot Selected Not Selected Not Selected Not Selected
Invert of Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft2
Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feetVertical Orifice Diameter = N/A N/A inches
User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir (and No Outlet Pipe) Calculated Parameters for Overflow Weirgrate Zone 3 Weir Not Selected Zone 3 Weir Not Selected
Overflow Weir Front Edge Height, Ho = 5.42 N/A ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht = 5.42 N/A feetOverflow Weir Front Edge Length = 37.00 N/A feet Overflow Weir Slope Length = 37.00 N/A feet
Overflow Weir Grate Slope = 0.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 521.32 N/AHoriz. Length of Weir Sides = 37.00 N/A feet Overflow Grate Open Area w/o Debris = 958.30 N/A ft2
Overflow Grate Open Area % = 70% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 479.15 N/A ft2
Debris Clogging % = 50% N/A %
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction PlateZone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected
Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 1.84 N/A ft2
Outlet Pipe Diameter = 21.00 N/A inches Outlet Orifice Centroid = 0.70 N/A feetRestrictor Plate Height Above Pipe Invert = 15.00 inches Half-Central Angle of Restrictor Plate on Pipe = 2.01 N/A radians
User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for SpillwaySpillway Invert Stage= 5.60 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.88 feet
Spillway Crest Length = 16.00 feet Stage at Top of Freeboard = 7.48 feetSpillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.62 acres
Freeboard above Max Water Surface = 1.00 feet Basin Volume at Top of Freeboard = 2.10 acre-ft
Max Ponding Depth of Target Storage Volume = 5.57 feet Discharge at Top of Freeboard = 33.50 cfs
Routed Hydrograph ResultsDesign Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 YearOne-Hour Rainfall Depth (in) = 0.53 1.07 0.85 1.19 1.39 1.65 1.93 2.20 3.00
CUHP Runoff Volume (acre-ft) = 0.323 0.944 0.624 0.999 1.247 1.641 2.016 2.423 3.541Inflow Hydrograph Volume (acre-ft) = 0.323 0.944 0.624 0.999 1.247 1.641 2.016 2.423 3.541CUHP Predevelopment Peak Q (cfs) = 0.0 0.0 0.2 3.4 5.9 12.1 16.6 21.6 34.7
OPTIONAL Override Predevelopment Peak Q (cfs) = 0.0 0.0Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.01 0.21 0.36 0.74 1.01 1.32 2.12
Peak Inflow Q (cfs) = 6.0 18.1 11.6 19.2 23.3 31.3 38.5 47.1 67.7Peak Outflow Q (cfs) = 0.1 0.3 0.2 0.3 0.3 0.4 4.3 18.3 32.2
Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 0.1 0.1 0.0 0.3 0.8 0.9Structure Controlling Flow = Plate Plate Plate Plate Plate Plate Overflow Weir 1 Outlet Plate 1 Spillway
Max Velocity through Grate 1 (fps) = N/A N/A N/A N/A N/A N/A 0.0 0.0 0.0Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) = 39 70 56 72 80 92 96 94 90Time to Drain 99% of Inflow Volume (hours) = 40 73 59 75 85 97 102 102 100
Maximum Ponding Depth (ft) = 2.51 3.87 3.21 3.98 4.44 5.14 5.47 5.57 5.98Area at Maximum Ponding Depth (acres) = 0.36 0.50 0.45 0.50 0.54 0.58 0.60 0.60 0.62
Maximum Volume Stored (acre-ft) = 0.301 0.896 0.589 0.951 1.195 1.581 1.781 1.835 2.084
DETENTION BASIN OUTLET STRUCTURE DESIGNMHFD-Detention, Version 4.00 (December 2019)
Conifer Commons
A-1
The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF).
Example Zone Configuration (Retention Pond)
COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2Count_Underdrain = 0 0.11(diameter = 3/8 inch) 2 1 1
Count_WQPlate = 1 0.14(diameter = 7/16 inch)
Count_VertOrifice1 = 0 0.18(diameter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch) 4 1 5yr, <72hr 0
Count_Weir1 = 1 0.29(diameter = 5/8 inch) >5yr, <120hr 0
Count_Weir2 = 0 0.36(diameter = 11/16 inch) Max Depth Row
Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch) WQCV 252 Watershed Constraint Check
Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch) 2 Year 322 Slope 0.040
COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch) EURV 388 Shape 3.61
Hidden Parameters & Calculations 0.67(diameter = 15/16 inch) 5 Year 399
MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch) 10 Year 445 Spillway Depth
Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches) 25 Year 515 0.88
WQ Plate Flow at 100yr depth = 0.38 0.97(diameter = 1-1/8 inches) 50 Year 548
CLOG #1= 35% 1.08(diameter = 1-3/16 inches) 100 Year 558 1 Z1_Boolean
Cdw #1 = 1.15 1.20(diameter = 1-1/4 inches) 500 Year 599 1 Z2_Boolean
Cdo #1 = 1.07 1.32(diameter = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean
Overflow Weir #1 Angle = 0.000 1.45(diameter = 1-3/8 inches) 1 Opening Message
CLOG #2= 0% 1.59(diameter = 1-7/16 inches) Draintime Running
Cdw #2 = #VALUE! 1.73(diameter = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4)
Cdo #2 = #VALUE! 1.88(diameter = 1-9/16 inches) Vertical Orifice 1 0 0 1
Overflow Weir #2 Angle = #VALUE! 2.03(diameter = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean
Underdrain Q at 100yr depth = 0.00 2.20(diameter = 1-11/16 inches) Overflow Weir 1 1 1 0 Max Depth
VertOrifice1 Q at 100yr depth = 0.00 2.36(diameter = 1-3/4 inches) Overflow Weir 2 0 0 0 500yr Depth
VertOrifice2 Q at 100yr depth = 0.00 2.54(diameter = 1-13/16 inches) Outlet Pipe 1 1 1 1 Freeboard
2.72(diameter = 1-7/8 inches) Outlet Pipe 2 0 0 1 Spillway
Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches) 0 Spillway Length
CountA_3 (EURV & 100yr) = 1 3.09(diameter = 2 inches) FALSE Time Interval
CountA_4 (100yr Only) = 1 3.29(use rectangular openings) Button Visibility Boolean
COUNTA_5 (FSD Weir Only)= 0 0 WQCV Underdrain
COUNTA_6 (EURV Weir Only)= 1 1 WQCV Plate
0 EURV-WQCV Plate
Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice
Outlet2_Pulldown_Boolean 1 Outlet 90% Qpeak
Outlet3_Pulldown_Boolean 0 Outlet Undetained
0 Weir Only 90% Qpeak
0 Five Year Ratio Plate
0 Five Year Ratio VertOrifice
EURV_draintime_user
Spillway Options
Offset
Overlapping
S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axisminimum bound 0.00 0 0maximum bound 8.00 100,000 40
DETENTION BASIN OUTLET STRUCTURE DESIGNMHFD-Detention, Version 4.00 (December 2019)
0
10
20
30
40
50
60
70
80
0.1 1 10
���
����
�
TIME [hr]
500YR IN
500YR OUT
100YR IN
100YR OUT
50YR IN
50YR OUT
25YR IN
25YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
EURV IN
EURV OUT
WQCV IN
WQCV OUT
0
1
2
3
4
5
6
7
0.1 1 10 100
���
����
���
�����
DRAIN TIME [hr]
500YR
100YR
50YR
25YR
10YR
5YR
2YR
EURV
WQCV
0
5
10
15
20
25
30
35
40
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
���
���
����
�
����
�����
����
���
���
�����
PONDING DEPTH [ft]
User Area [ft^2]
Interpolated Area [ft^2]
Summary Area [ft^2]
Volume [ft^3]
Summary Volume [ft^3]
Outflow [cfs]
Summary Outflow [cfs]
APPENDIX F – SITE DRAINAGE PLAN
AC
BASIN
AREA CMINORMAJOR
A-116.39
0.710.49
1
FILE
PATH
: K:\2
0011
5\ENG
INEE
RING
\DRA
INAG
E\DR
AINA
GE_P
LAN.
DWG
LAYO
UT: L
AYOU
T12 X
REFs
: ccr-
conif
er co
mmon
s rez
one -
titleb
lock[U
], co_
conif
er_b
ase-
final[
U]
R
Know what's below.
Call before you dig.
CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER
UTILITIES.
ISSUE DATE:DATE REVISION COMMENTS
SHEET NO.
DESIGNED BY:CHECKED BY:DRAWN BY:
PROJECT #:
PLOT
TED:
FRI
01/24
/20 11
:02:40
A B
Y: P
AT H
ERLIH
Y
1120 Lincoln Street, Suite 1000
Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311
HarrisKocherSmith.com
11 OF 2
####
PJHREVIEWERDRAFTER
200115
CONIFER COMMONSDRAINAGE PLAN
PWN ARCHITECTS AND PLANNERS. INC.#### ####
#### ####
#### ####
#### ####
#### ####
#### ######## ####
NO C
HANG
ES A
RE T
O BE
MAD
E TO
THI
S DR
AWIN
G W
ITHO
UT W
RITT
EN P
ERMI
SSIO
N OF
HAR
RIS
KOCH
ER S
MITH
.
P
R
E
L
I
M
I
N
A
R
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
0
SCALE: 1" =
60 60 120
60'
BASINDESIGNATION
BASIN SIZEIN ACRES
C COEFFICIENT
C COEFFICIENT0.450.67
1.23AC
BASIN
AREA CMINORMAJOR
OS 1
1 BASIN DESIGN POINT
5-YR RATIONAL (POST-PROJECT)
100-YR RATIONAL (POST-PROJECT)
RUNOFF SUMMARY TABLEBASIN DESIGN POINT AREA (AC) % IMPERVIOUS Q5 (CFS) Q100 (CFS)A-1 Pre 1 16.39 0.00% 1.36 34.90A-1 Post 1 16.39 55.91% 19.25 51.43
APPENDIX G – MAJOR BASIN DRAINAGE PLAN
8800
9000
8600
8600
9000
9000
8400
8200
8360
83208280
8240
8440
8480
AC
BASIN
AREA CMINORMAJOR
DA-1297.5
0.500.07
1
FILE
PATH
: K:\2
0011
5\ENG
INEE
RING
\DRA
INAG
E\OV
ERAL
L_DR
AINA
GE_P
LAN.
DWG
LAYO
UT: L
AYOU
T13 X
REFs
: ccr-
conif
er co
mmon
s rez
one -
titleb
lock[U
], co_
conif
er_b
ase-
final,
drain
age_
plan
R
Know what's below.
Call before you dig.
CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER
UTILITIES.
ISSUE DATE:DATE REVISION COMMENTS
SHEET NO.
DESIGNED BY:CHECKED BY:DRAWN BY:
PROJECT #:
PLOT
TED:
FRI
01/24
/20 12
:12:15
P B
Y: P
AT H
ERLIH
Y
1120 Lincoln Street, Suite 1000
Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311
HarrisKocherSmith.com
22 OF 2
####
PJHREVIEWERDRAFTER
200115
CONIFER COMMONSMAJOR BASIN DRAINAGE PLAN
PWN ARCHITECTS AND PLANNERS. INC.#### ####
#### ####
#### ####
#### ####
#### ####
#### ######## ####
NO C
HANG
ES A
RE T
O BE
MAD
E TO
THI
S DR
AWIN
G W
ITHO
UT W
RITT
EN P
ERMI
SSIO
N OF
HAR
RIS
KOCH
ER S
MITH
.
P
R
E
L
I
M
I
N
A
R
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
0
SCALE: 1" =
300 300 600
300'
BASINDESIGNATION
BASIN SIZEIN ACRES
C COEFFICIENT
C COEFFICIENT0.450.67
1.23AC
BASIN
AREA CMINORMAJOR
OS 1
1 BASIN DESIGN POINT
5-YR RATIONAL (POST-PROJECT)
100-YR RATIONAL (POST-PROJECT)
RUNOFF SUMMARY TABLEBASIN DESIGN POINT AREA (AC) % IMPERVIOUS Q5 (CFS) Q100 (CFS)DA-1 Pre 1 297.53 1.54% 71.53 444.40DA-1 Post 1 297.53 4.68% 79.93 455.84