South Massachusetts Avenue Corridor Safety Improvements
SMA Advisory Committee Meeting #4| Sept. 12, 2018
![Page 2: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/2.jpg)
• Welcome• Review of Project
Background & Goals• Recent Process• Review of Current Issues• Discussion of Evaluation
Questions and Metrics• Schedule Update• Discussion/
Questions
AgendaMassachusetts Avenue – Sidney Street to Memorial Drive
![Page 3: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/3.jpg)
PROJECT BACKGROUND
Municipal Policies
Complete Streets are designed and operated to enable safe access for all users –regardless of age, ability, or mode of transportation (2016).
Vision Zero calls for the elimination of fatalities and serious injuries resulting from traffic crashes, and emphasizes that they can, and should be prevented (2016).
Vehicle Trip Reduction Ordinance established programs to encourage alternatives to single-occupancy vehicle travel (1992).
Cambridge Growth Policy emphasizes sustainable modes of transportation such as walking, biking and using transit and low-emission vehicles, which promote livability and help to improve air quality and reduce greenhouse gas emissions (1993/2007).
![Page 4: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/4.jpg)
PROJECT BACKGROUND
Flexible Implementation
Based on Policies and Plans and direction of City leadership:
• Evaluate and implement “quick build” solutions to enhance the comfort and promote sustainable transportation for people walking, biking, driving and using transit
Designs that are flexible after implementation
Modifications possible based on evaluation (including feedback)
![Page 5: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/5.jpg)
CORRIDOR INFORMATION
Corridor Safety HistoryReported Crashes Requiring EMS Transport, 2015-2016
5
![Page 6: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/6.jpg)
6
CORRIDOR INFORMATION
People Bicycling
Throughout the entire corridor length, users experience the second lowest level of comfort.
![Page 7: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/7.jpg)
People Walking
7
CORRIDOR INFORMATION
Local and regional destinations and connections
Evaluating ease and comfort of crossing at and between intersections
Walking in this corridor:
![Page 8: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/8.jpg)
Transit Service AnalysisMBTA Bus Route 1*: AM Peak
8
Composite Grade*
Excellent (A)
Good (B)
Satisfactory (C)
Unsatisfactory (D)
Poor (E)
Failing (F)
N/A
CORRIDOR INFORMATION
Areas of most concern
*Route 1 is ranked in top 5 MBTA bus routes for ridership.
*Criteria:Excess vehicle travel time compared to a minimumPassenger time (travel time x riders)Reliability (how much the travel time varies)
![Page 9: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/9.jpg)
Transit ServiceMBTA Bus Route 1: PM Peak
9
Method: Automatic Passenger Counter (APC) Data (MBTA)
CORRIDOR INFORMATION
Composite Grade
Excellent (A)
Good (B)
Satisfactory (C)
Unsatisfactory (D)
Poor (E)
Failing (F)
N/A
Areas of most concern
![Page 10: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/10.jpg)
Project Goals Address safety
issues and reduce crashes - Vision Zero
Reduce transit delays
Enable/encourage people of all ages and abilities to choose sustainable transportation
![Page 11: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/11.jpg)
Public ProcessAppointed Advisory Committee
Wikimap online
Survey online and at public meetings
Outreach to Businesses Direct meetings with XX local businesses
Coordination with CSBA
Individual Stakeholder meetings
Transit/Ped/Bike Committees
Communitywide Meetings
Posted and electronic
announcements
![Page 12: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/12.jpg)
Public FeedbackNeed for safer conditions for bicyclists
Motorists and delivery vehicles block bike lanes Desire for greater separation from moving vehicles
Need for additional crosswalks traversing Mass Ave
Desire to improve transit operations
Concerns about unpredictable ridesharing, tour bus, food truck, commercial loading & pick-up/drop-off activity
Relocate MIT-related tour buses loading/unloading
Concerns about long vehicle queues, traffic at Vassar Street
Minimize conflicts, bus/bike conflicts and bike/ped conflicts at 77 Mass Ave.
![Page 13: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/13.jpg)
Actions Since Last Public Meeting
• Additional outreach – 3 farmers markets, 2 senior coffees, 1 senior town meeting, 2 Central Fleas, 1 Taste of Cambridge,
• Review curb use changes with MIT• Investigate additional queue jumps for the bus in NB
direction• Coordination with state agencies on additional
measures in short and long-term on state facilities• Additional review of traffic analysis
• Ascertain that design does not negatively impact corridor bus service prior to implementation
13
![Page 14: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/14.jpg)
South Mass. Ave. CorridorDraft Design – Before and After
Before After
![Page 15: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/15.jpg)
15
Proposed Design Three Main Sections
Section 1:Sidney St to Albany St
![Page 16: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/16.jpg)
16
Proposed Design Section 1: Sidney St to Albany St (A)
Sid
ney
St
Bla
nche
St
DRAFT
![Page 17: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/17.jpg)
17
Proposed Design Section 1: Sidney St to Albany St (B)
DRAFT
New Crosswalk& RRFB (rectangular rapid flash beacon
![Page 18: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/18.jpg)
18
Proposed Design Section 1: Sidney St to Albany St (C)
DRAFT
New Crosswalk& Rectangular Rapid Flash Beacon
![Page 19: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/19.jpg)
19
Proposed Design Section 2: Albany St & Vassar St
DRAFT
Bike signal&
Right-turn lane
![Page 20: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/20.jpg)
20
Proposed Design
Mass. Ave
DRAFT
Potential future opportunity to increase space for bicyclists by modifying curb extensions
Bike signal &right-turn laneseparate movements
![Page 21: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/21.jpg)
21
Proposed Design
Mass. Ave
DRAFT
Bike signal &right-turn laneseparate movements
Vehicle Movement
![Page 22: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/22.jpg)
22
Proposed Design
Mass. Ave
DRAFT
Bike signal &right-turn laneseparate movements
Bicycle MovementPedestrian Movement
![Page 23: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/23.jpg)
23
CORRIDOR INFORMATION
Proposed Design Three Main Sections
Section 3:MIT
![Page 24: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/24.jpg)
24
Proposed Design Section 3: MIT (A)
DRAFT
![Page 25: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/25.jpg)
25
Proposed Design Section 3: MIT (B)
Mem
oria
l Dr
DRAFT
Am
hers
t St
Remove MBTA Bus Stop, consistent with MBTA Service Plan
![Page 26: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/26.jpg)
Project Evaluation Questions & Data Collection
• User Feedback• On-line survey; hard copies available• Wikimap• Intercept surveys
• Technical Data• Counts: motor vehicles, pedestrian, cyclists• Speeds• Travel times along corridor
• Transit vehicles• Motor vehicles
• Safety Data• Crash analysis (requires 3 years for statistical validity, but will
monitor for issues and trends 26
![Page 27: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/27.jpg)
Project Evaluation Questions & Data Collection
• Signal intersections• Vehicle queues• LOS for Pedestrians• Conflicts
• New Pedestrian Crossing• Counts: number of users• Yield study (based on standard protocols)
• Parking/Loading/Ride Hail• Parking study• Delivery vehicles• Observations: where are ride hail vehicles stopping?
27
![Page 28: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/28.jpg)
ScheduleBicycle, pedestrian,traffic countsApril
Refine DesignMay - August
Public Meeting #1May 3
Parking studyWeek of April 30
Anticipated ImplementationFall/Oct 2018
Evaluation
AdvisoryCommittee Meetings #2-3May, Sept.
NEXT STEPS
AdvisoryCommittee Meeting #1April 11
Public Meeting #2/Open HouseJune 19
![Page 29: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/29.jpg)
Blank Slide
29
![Page 30: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/30.jpg)
30
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
The corridor has been divided into 3 sections for clarity
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sidn
ey S
t
![Page 31: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/31.jpg)
31
CORRIDOR INFORMATION
Transportation/Traffic AnalysisCross Sections
• The three general cross sections (intersections vary)
3131
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
31
Most Complicated
![Page 32: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/32.jpg)
32
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sidn
ey S
t
32
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facilities
Bus lanes proposed for two sections, to address the key areas of delay
![Page 33: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/33.jpg)
33
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details - After
![Page 34: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/34.jpg)
34
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details - Before
![Page 35: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/35.jpg)
35
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
Bus lanes at intersections: Right turning motorists may use bus lane
National Precedent
Design Sample
![Page 36: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/36.jpg)
36
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBicycle Facilities
For most of the corridor, separated bike lanes can be created using on-street parking and flex posts
36
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sidn
ey S
t
36Flexpost/Parking ProtectionBike Lanes
![Page 37: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/37.jpg)
37
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
Bus lanes at intersections: Right turning motorists may use bus lane
National Precedent
Design Sample
![Page 38: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/38.jpg)
38
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
Bus Lanes with Parking
Boston, MA - Wikimedia Commons
![Page 39: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/39.jpg)
Bicycle FacilitiesSeparated Bike Lane –Parking Protected
DESIGN OVERVIEW
Parking Protected Bicycle Lanes
![Page 40: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/40.jpg)
Bicycle FacilitiesBike Lane with Curbside Parking
DESIGN OVERVIEW
Curbside parking/Accessible Parking
![Page 41: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/41.jpg)
41
DESIGN OVERVIEW
Parking FacilitiesAccessible Parking
414141Denver, CO
![Page 42: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/42.jpg)
Bus Stop OptionsDESIGN OVERVIEW
Bus stop at curb Floating bus stop(possible future item)
![Page 43: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/43.jpg)
43
CORRIDOR INFORMATION
Bus Stop Options
Potential for a future modular floating bus stop under evaluation
![Page 44: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/44.jpg)
44
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
• Detailed Design
Section 1:Sidney St to Albany St
![Page 45: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/45.jpg)
45
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (A)
Sid
ney
St
Bla
nche
St
DRAFT
![Page 46: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/46.jpg)
46
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (B)
DRAFT
New Crosswalk& RRFB
![Page 47: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/47.jpg)
47
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (C)
DRAFT
New Crosswalk& RRFB
![Page 48: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/48.jpg)
49
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 2: Albany St & Vassar St
DRAFT
Bike signal&
Right-turn lane
![Page 49: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/49.jpg)
50
Vassar Street
Design Analysis
Mass. Ave
Potential future opportunity to increase space for bicyclists by modifying bulb-outs
DRAFT
Bike signal &Right-turn laneSeparates movements
![Page 50: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/50.jpg)
51
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
Other Design Details
Section 3:MIT
![Page 51: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/51.jpg)
52
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 3: MIT (A)
DRAFT
![Page 52: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/52.jpg)
53
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 3: MIT (B)
Mem
oria
l Dr
DRAFT
Am
hers
t St
Remove MBTA Bus Stop, consistent with MBTA Service Plan
![Page 53: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/53.jpg)
Existing Conditions Mass. Ave. Cross-Section (at Amherst Street)
88’ wide
On-street bike lane
On-street vehicle parking
Mix of meters and other parking
Bus stops
Curb extensions at multiple locations
14’Sidewalk
9’Parking
12’Travel
11’Travel
8’Parking
13’Sidewalk
5’BikeLane
11’Travel
5’BikeLane
CORRIDOR INFORMATION
![Page 54: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/54.jpg)
CORRIDOR INFORMATION
Safety History Reported Bicycle Crashes, 2015-2016
57
Project Limits
![Page 55: South Massachusetts Avenue Corridor Safety Improvements/media/Files/CDD/Transportation/Projects/southmassave/s...• Review of Project Background & Goals • Recent Process • Review](https://reader030.fdocuments.us/reader030/viewer/2022040810/5e50f07f1b3d1f2a4f57b81d/html5/thumbnails/55.jpg)
58
CORRIDOR INFORMATION
Transportation/Traffic Analysis
• Corridor-wide transportation analysis to determine where:
• Bus lanes can be added• Vehicle lanes can be repurposed• Signal operations can be modified• Bicycle lanes can be separated• Bicycle buffers can be added• Parking can be re-located for better operations