SOUTH HALL MWC Los Angeles 2019Skyworks Netcracker Technology Netcracker Technology S2.306 Sprint...
Transcript of SOUTH HALL MWC Los Angeles 2019Skyworks Netcracker Technology Netcracker Technology S2.306 Sprint...
HANGING POINTS ON EITHER SIDESOUTH HALL MEETING ROOMS HAVE
OF EVERY OTHER A/C VENT LOCATEDTHROUGH MAIN CORRIDOR.BANNER SIZE IS 10'X3'
NOTE:
301A 302 303A 304A 305 306A 307
UPPER LEVEL MEETING ROOMSSOUTH HALL
FOYER
309
308A301B 303B 304B 304C 308B306B
STORAGE
STORAGE
STORAGE
STORAGE
Convention Center
Los Angeles
TO S
OU
THLO
BB
Y
TO C
OMPASS
CAFE
4' F
re
em
an
ta
ble
6' F
re
em
an
ta
ble
6' F
re
em
an
ta
ble
S2.308A
S2.308B
Media Center
6'
ENTER
water
cooler
monitor
4'-6"
4'-6"
4'-6"4'-6"
Workspace for 76
4'-6"
5'-2"
5'
printer
food service
printer
S2.301A S2.301B S2.302 S2.303B
GSMA GSMA GSMA
S2.305
S2.303B-A
20'
15'
Cisco
Systems,
Inc
S2.303B-B
15'
20'
Cisco
Systems,
Inc
S2.304
43'
15'
EMR Lounge
S2.304-A
15'
15'
RF Pixels
S2.304-B
15'
15'
Global
Certification
S2.304-C
15'
15'
S2.304-D
20'
15'
S2.304-E
15'
15'
S2.304-F
15'
15'
Skyworks
Netcracker
Technology
Netcracker
Technology
S2.306
Sprint
Corporatiion
S2.307
Media
Village
S2.309
FREIGHT CARRIER CHECK IN DATE & TIME
Oct 22 - 24, 2019
Los Angeles, CA
Los Angeles Convention Center
TARGET MOVE IN SCHEDULE
This schedule refers to the date and time your delivering carrier must check into the marshaling area for the Los Angeles Convention Center to be placed in line for unloading (see marshaling yard directions in this section of your Exhibitor Kit).
This schedule is for the move-in of your exhibit and display equipment. You are not required to begin setting your display at this time.
OFF TARGET
If you are unable to meet your assigned target date for any reason and wish to request a change, please contact Freeman at:
No targets will be changed without written approval from Freeman.
300 Series Meeting Rooms
Disclaimer - Every effort has been made to ensure the accuracy of all information contained on this floor plan. However, no warranties, either expressed of implied, are made with respect to this floor plan. If the location of building
columns, utilities or other architectural components of the facility is a consideration in the construction or usage of an exhibit, it is the sole responsibility of the exhibitor to physically inspect the facility to verify all dimension and locations.
© Copyright 2018, Freeman, all rights reserved.
Floor plan as of March 15, 2019
INBOUND FREIGHT
TARGET SCHEDULE
MWC Los Angeles 2019
Sunday, Oct. 20,
8am-5pm