South Dakota Tribal Transportation Improvement Plans 2013 – 2017

36
South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Transcript of South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Page 1: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

South Dakota Tribal

Transportation Improvement Plans

2013 – 2017

Page 2: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 3: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Cheyenne River
Page 4: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

19-APR-2012 03:08 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 2 of 5

A0106200

A0110300

A0111000

A0119000

A0122400

A0123000

205,000

0

0

0

0

0

0

0

70,000

0

15,000

0

0

0

0

0

850,000

0

0

0

0

0

230,000

0

355,000

550,000

90,500

115,500

1,095,000

157,500

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

5,000 190,000

0 10,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

5,000 60,000

0 5,000

0 0 0 0

0 0

15,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

55,000 750,000

0 45,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

15,000 175,000

0 40,000

0 0 0 0

10,000 325,000

0 20,000

70,747 439,599

0 39,654

5,000 70,000 10,500 5,000

5,000 80,000 25,500 5,000

70,000 925,000 15,000 85,000

5,000 142,500

4,000 6,000

RT 7 & 8 F ACNT CULV RPL

THUNDER BUTTE / IRON LIGHTNING S

CHERRY CREEK WEST SURF TRMT

ARMSTRONG CO ROAD SURF TRMT

MOREAU RIVER ROAD II

WHITEHORSE RD SURF TRMT

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

OVRLAY

REHAB

REHAB

RECONS

REHAB

R

R

R

R

R

R

C4

7

5

5

2

5

46 - South DakotaState A01340 - Cheyenne River

041 - Dewey

041 - Dewey

041 - Dewey

041 - Dewey

041 - Dewey

041 - Dewey

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 2,229,187

FIRST PAGE FOR CSTIPA01340 - Cheyenne RiverEntity Name

5,000 135,000

0 10,000

70,747 439,599

0 39,654

0 10,000 10,500

0

5,000 80,000 25,500 5,000

0 0 0 0

5,000 142,500

4,000 6,000

150,000

550,000

20,500

115,500

0

157,500

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

18-APR-12

Page 5: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

19-APR-2012 03:08 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 3 of 5

A0123500

A0132000

A0132200

A0132400

A0136000

A0136200

0

0

0

1,298,890

95,000

0

302,500

0

254,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

302,500

7,500

254,000

1,298,890

95,000

5,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0 0 0

0 0 0 0

40,000 1,168,890

0 90,000

0 0

95,000 0

0 0 0 0

20,000 250,000 12,500 20,000

0 0 0 0

15,000 205,000 14,000 20,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

20,000 250,000 12,500 20,000

5,000 0

2,500 0

15,000 205,000 14,000 20,000

40,000 1,168,890

0 90,000

0 0

95,000 0

0 0

5,000 0

RESERVATION WIDE PATCH AND SEA

VEO CREEK BRIDGE REPLACEMENT

MOREAU RV BRIDGE E SURF TRMT

GRAVEL RESURFACING

DUPREE WEST HOUSING

RED ELM HOUSING STREETS

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

SAFETY

BRIDGE

REHAB

REHAB

NEWCON

NEWCON

R

B

R

R

R

R

S4

SD

5

3

7

7

46 - South DakotaState A01340 - Cheyenne River

- ---46-

041 - Dewey

041 - Dewey

137 - Ziebach

137 - Ziebach

137 - Ziebach

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 2,229,187

A01340 - Cheyenne RiverEntity Name

0 0 0 0

5,000 0

2,500 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

5,000 0

0

7,500

0

0

0

5,000

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

18-APR-12

Page 6: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

19-APR-2012 03:08 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 4 of 5

A0138300

A0138500

A0141200

A0147600

A0162500

A0162600

0

0

13,000

0

60,000

0

635,000

0

0

78,500

945,000

0

0

0

0

1,115,000

0

96,500

0

0

0

0

0

1,940,000

763,500

250,000

13,000

1,193,500

1,101,500

2,036,500

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0 0 0

0 13,000

0 0

0 0 0 0

0 0

60,000 0

0 0 0 0

50,000 550,000

0 35,000

0 0 0 0

0 0 0 0

0 0

78,500 0

50,000 860,000

0 35,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

55,000 1,015,000

0 45,000

0 0 0 0

0 0

96,500 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

175,000 1,565,000

0 200,000

50,000 550,000 128,500 35,000

15,000 220,000

0 15,000

0 13,000

0 0

55,000 1,015,000

78,500 45,000

50,000 860,000 156,500 35,000

175,000 1,565,000

96,500 200,000

EAGLE BUTTE SOUTH MAIN & WILLOW

HAWK EAGLE PATHWAY

MULTI-ROUTE STRIPING

TAKINI SCHOOL STREETS

BIA 12 CHERRY CK EAST PH I

BIA 12 CHERRY CK EAST PH II

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

RECONS

WALKWY

SAFETY

RECONS

RECONS

RECONS

R

R

O

R

R

R

7

6

P2

7

5

5

46 - South DakotaState A01340 - Cheyenne River

041 - Dewey

041 - Dewey

041 - Dewey

137 - Ziebach

137 - Ziebach

137 - Ziebach

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 2,229,187

A01340 - Cheyenne RiverEntity Name

0 0

128,500 0

15,000 220,000

0 15,000

0 0 0 0

0 0 0 0

0 0

96,500 0

0 0 0 0

128,500

250,000

0

0

96,500

0

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

18-APR-12

Page 7: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

19-APR-2012 03:08 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 5 of 5

2,229,187 2,212,250 2,450,000 2,261,500 2,370,000 11,522,937

2,229,187 2,212,250 2,450,000 2,261,500 2,370,000 11,522,937

11,522,937

2,229,187 2,212,250 2,450,000 2,261,500 2,370,000 11,522,937

A0163000

A0174400

A0174500

A0174600

A01RM550

0

0

0

0

557,297

0

0

0

0

150,000

0

0

0

0

200,000

0

0

0

0

200,000

563,250

7,500

7,500

3,000

1,257,297

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

557,297

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

150,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

200,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

200,000

25,000 477,250 41,000 20,000

5,000 0

2,500 0

5,000 0

2,500 0

500 0

2,500 0

0 0 0

1,257,297

BIA ROUTE 6 SURF TRMT & SLIDE RE

GREEN GRASS STR REPLACEMENT

BUFFALO SKIN STR REHAB

STOVE CK STR REPLACEMENT

ROAD MAINTENANCE 23 USC 204(c)

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

2,229,187 2,212,250 2,450,000 2,261,500

REHAB

BRIDGE

BRIDGE

BRIDGE

SAFETY

R

B

B

B

O

5

B0

B0

B0

T3

46 - South DakotaState A01340 - Cheyenne River

041 - Dewey

041 - Dewey

041 - Dewey

041 - Dewey

041 - Dewey

Name

Name

Name

Name

Name

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 2,229,187

A01340 - Cheyenne RiverEntity Name

2,370,000

25,000 477,250 41,000 20,000

5,000 0

2,500 0

5,000 0

2,500 0

500 0

2,500 0

0 0 0

150,000

563,250

7,500

7,500

3,000

150,000

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

18-APR-12

Page 8: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 9: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Crow Creek
Page 10: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:04 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 2 of 3

A1442700

A1445000

A1445500

A1462500

A1483101

A1483102

16,000

0

0

442,457

10,000

5,000

0

0

474,000

0

0

0

0

0

474,000

0

0

0

0

0

0

0

0

0

16,000

398,500

989,000

442,457

10,000

5,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 16,000

0 0

0 0 0 0

0 0 0 0

30,000 412,457

0 0

0 0

10,000 0

0 0

5,000 0

0 0 0 0

0 0 0 0

35,000 430,000

0 9,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

35,000 430,000

0 9,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 16,000

0 0

50,000 325,000 13,500 10,000

70,000 860,000 41,000 18,000

30,000 412,457

0 0

0 0

10,000 0

0 0

5,000 0

MULTI-ROUTE STRIPING

BAD NATION NORTH

ROUTE 14 REHAB

SHELBY ROAD

Inventory Update

Long Range Transportation Plan

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

SAFETY

RECONS

REHAB

OVRLAY

PLANING

PLANING

O

R

R

R

O

O

P2

7

7

7

P8

P9

46 - South DakotaState A14342 - Crow Creek

017 - Buffalo

017 - Buffalo

017 - Buffalo

017 - Buffalo

017 - Buffalo

017 - Buffalo

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 473,457

FIRST PAGE FOR CSTIPA14342 - Crow CreekEntity Name

0 0 0 0

50,000 325,000 13,500 10,000

0 0

41,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0

398,500

41,000

0

0

0

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 11: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:04 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 3 of 3

473,457 440,500 475,000 475,000 1,000 1,864,957

473,457 440,500 475,000 475,000 1,000 1,864,957

1,864,957

473,457 440,500 475,000 475,000 1,000 1,864,957

A14RM550

0 1,000 1,000 1,000 4,000

CECONS

PEZ

0 0 0 0

0 0 0

1,000

0 0 0

1,000

0 0 0

1,000

0 0 0

4,000

ROAD MAINTENANCE 23 USC 204 (C)

TotalPhase

473,457 440,500 475,000 475,000

PLANING

R

T1

46 - South DakotaState A14342 - Crow Creek

017 - BuffaloNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 473,457

A14342 - Crow CreekEntity Name

1,000

0 0 0

1,000 1,000Total

FY 2012 ($) FY 2013 ($) FY 2014 ($) FY 2015 ($) FY 2016 ($)

29-MAY-12

Page 12: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 13: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Flandreau Santee Sioux Tribe
Page 14: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 11:59 AM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 2 of 3

112,695 114,500 114,000 115,000 155,000 611,195

611,195

112,695 114,500 114,000 115,000 155,000 611,195

A0327000

A0328000

A0331000

A0383101

A0383102

A03RM550

0

29,143

58,552

15,000

5,000

5,000

0

109,000

0

0

0

5,000

20,000

90,000

0

0

0

5,000

150,000

0

0

0

0

5,000

170,000

337,643

58,552

15,000

5,000

25,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0

29,143 0

5,000 40,000 8,552 5,000

0 0

13,500 1,500

0 0

4,500 500

0 0 0

5,000

0 0 0 0

3,000 101,000

0 5,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

0 0

20,000 0

5,000 82,500

0 2,500

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

5,000 140,000

0 5,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

5,000 140,000 20,000 5,000

8,000 248,500 73,643 7,500

5,000 40,000 8,552 5,000

0 0

13,500 1,500

0 0

4,500 500

0 0 0

25,000

CENTER STREET EXTENSION

THREE MILE ROAD

BROAD AVE REALIGNMENT

Flandreau Inventory Update

Flandreau Long Range Transportation Pl

ROAD MAINTENANCE 23 USC 204 C

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

112,695 114,500 114,000 115,000

NEWCON

RECONS

RECONS

PLANING

PLANING

PLANING

R

R

R

O

O

O

7

7

7

P8

P9

T1

46 - South DakotaState A03341 - Flandreau Santee Sioux Tribe

101 - Moody

101 - Moody

101 - Moody

101 - Moody

101 - Moody

101 - Moody

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 112,695

FIRST PAGE FOR CSTIPA03341 - FlandreauEntity Name

155,000

0 0 0 0

0 65,000 44,500

0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

5,000

0

109,500

0

0

0

5,000

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 15: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Lower Brule
Page 16: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:06 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 2 of 3

A1510400

A1511000

A1542800

A1564400

A1564500

A1564600

467,264

2,000

14,000

0

0

0

465,000

0

0

47,000

13,000

0

465,000

0

0

6,000

32,000

19,500

465,000

0

0

1,555,000

10,500

59,500

2,327,264

2,000

14,000

1,625,500

55,500

79,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 467,264

0 0

500 0 0

1,500

0 14,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 465,000

0 0

0 0 0 0

0 0 0 0

0 0

46,000 1,000

0 0

12,500 500

0 0 0 0

0 465,000

0 0

0 0 0 0

0 0 0 0

0 0

5,000 1,000

0 0

31,000 1,000

0 0

18,500 1,000

0 465,000

0 0

0 0 0 0

0 0 0 0

100,000 1,305,000

0 150,000

0 0

10,000 500

0 0

58,500 1,000

0 2,327,264

0 0

500 0 0

1,500

0 14,000

0 0

100,000 1,305,000

68,000 152,500

0 0

53,500 2,000

0 0

77,000 2,000

FARM ROAD RECONSTRUCTION

LOWER BRULE PATHWAY

MULTI-ROUTE STRIPING

BIA 10 W BRULE TO TRIBAL ADMIN BL

BIA 10 MEDICINE CREEK GRADE RAIS

BIA 10 W BRULE TO MEDICINE CREEK

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

NEWCON

WALKWY

SAFETY

RECONS

RECONS

RECONS

R

R

O

R

R

R

7

6

P2

7

7

7

46 - South DakotaState A15343 - Lower Brule

085 - Lyman

085 - Lyman

085 - Lyman

085 - Lyman

085 - Lyman

085 - Lyman

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 633,264

FIRST PAGE FOR CSTIPA15343 - Lower BruleEntity Name

0 465,000

0 0

0 0 0 0

0 0 0 0

0 0

17,000 500

0 0 0 0

0 0 0 0

465,000

0

0

17,500

0

0

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 17: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:06 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 3 of 3

633,264 637,555 680,055 677,555 2,275,055 4,903,484

633,264 637,555 680,055 677,555 2,275,055 4,903,484

4,903,484

633,264 637,555 680,055 677,555 2,275,055 4,903,484

A1564700

A1583101

A1583102

A15RM550

0

10,000

5,000

135,000

0

0

0

155,055

0

0

0

155,055

30,000

0

0

155,055

30,000

10,000

5,000

755,220

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0

8,500 1,500

0 0

4,500 500

0 0 0

135,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

155,055

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

155,055

0 0

30,000 0

0 0 0 0

0 0 0 0

0 0 0

155,055

0 0

30,000 0

0 0

8,500 1,500

0 0

4,500 500

0 0 0

755,220

BIA 10 MEDICINE CREEK TO KENNEB

Lower Brule Inventory Update

Lower Brule Long Range Transportation

ROAD MAINTENANCE 23 USC 204 (C)

Total

Total

Total

Total

Phase

Phase

Phase

Phase

633,264 637,555 680,055 677,555

OVRLAY

PLANING

PLANING

SAFETY

R

O

O

O

6

P8

P9

T3

46 - South DakotaState A15343 - Lower Brule

085 - Lyman

085 - Lyman

085 - Lyman

085 - Lyman

Name

Name

Name

Name

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 633,264

A15343 - Lower BruleEntity Name

2,275,055

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0

155,055

0

0

0

155,055

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 18: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 19: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Transportation Improvement ProgramOglala Sioux Tribe

Construction Year 2012Funds RouteProject No. County Length Location Type of Work Amount

IRR 41 and 115SEAL Shannon 13.9 Rt 41 from the Nebraska State Line to US 18 and Rt. 115

from US18 to Oglala Housing

Reshaping the existing base course, prime seal and then a

double chip seal

$590,000

Presently a gravel road with base course and millings mixture. Remaining funding from prevous years.Comments:

IRR 5050 Shannon 0.75 BIA 50 from Junction with BIA Route 115 through the

Housing Development and

Reconstruction and paving of the streets

$370,000

$370,000 of this project is from remaining FY2011 funds that were transferred from the BIA to the Fed. Lands and then to OST on an RFA. This will be a OST DOT Construction Force Account project.

Comments:

IRR Multiple *Seal Shannon and Jackson

50.6 Roads and streets in various locations *

Chip sealing $1,000,000

Rt. 35 = 6.0 miles, Rt. 41 From Res. Line So. = 15.3 miles (Rt. 2 = 1.8 miles), Rt. 27 Vis. Ctr. So = 24.0 miles, Rt. 60 = 1.2 miles, Rt. 47 = 1.0 miles, Rt. 51 =1.0 miles, and Rt. 55 = 0.3 Miles. Remaining 2011 funds

Comments:

IRR and BIA 3636-10 Shannon 0.1 The Tribal Office street in Pine Ridge

Eliminate islands on both sides of the street, construct needed

parking areas and improve

$680,000

Widen the street and add parking on both sides of the street. Sanitary Sewer will be replaced with $50,000 BIA funding. $700,000 will be from remaining FY2011 IRR Funds and $50,000 will be from remaining BIA funds.

Comments:

IRR and PLH-D 22-12 Shannon 2 From the Junction with BIA Rt. 27 then 2 miles westerly

Replace CMP's with RCP, new bridge railing, reshape roadway

and asphalt paving

$2,120,000

$1,900,000 funded with PLH-D, the rest is remaining past years IRR funding.Comments:

Total Amount for Construction Year $4,760,0002012

Page 1 of 5

Page 20: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Construction Year 2012 and2013Funds RouteProject No. County Length Location Type of Work Amount

IRR 2525 Shannon 6.7 BIA 25 from BIA 2 west of Kyle north

Reconstruct and Partial length of Asphalt Pavement

$7,745,000

$1,765,000 will be used from remaining IRR funds.Comments:

Total Amount for Construction Year $7,745,0002012 and2013

Construction Year 2012 or 2013Funds RouteProject No. County Length Location Type of Work Amount

IRRBP & County/SDDOT

2656BRF 6488(01)

Custer 0.1 5 miles west of the Pine Ridge Reservation Line

Construction of New Bridge $1,000,000

Jointly funded with $1,000,000 IRRBP funds matched with a minimum of 20% Custer County funding. The remainder of the funding will be obtained by Custer County thru SDDOT and others. These funds will be

Comments:

Total Amount for Construction Year $1,000,0002012 or 2013

Construction Year 2013Funds RouteProject No. County Length Location Type of Work Amount

IRR 22-13 Shannon 4 From Sharps Corner Junction with BIA Rt. 27 to Kyle

Asphalt Repairs and Leveling $388,000

Complete repairs and leveling to maintain safe driving conditionsComments:

IRR 3232-12 Shannon 13 Between Pine Ridge and BIA Route 41

Asphalt leveling repairs $388,000

Do asphalt leveling over the badly settled areas for driving safetyComments:

Page 2 of 5

Page 21: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

IRR N/ABLDG Shannon N/A OST Transportation Department Building in Pine

Ridge

Construction of a pre-engineered metal office building

$905,000

Construction and engineering personnel now occupy the maintenance building and have outgrown the available space. $40,000 is remaining previous years funding.

Comments:

IRRBP 49BR49 Shannon 0.1 Structure Number A133 on BIA 49 0.1 mile south of BIA

27 near Wounded Knee

Replace Functionally Obsolete bridge with a box culvert

$720,000

The bridge is rated as functionally obsolete and needs replacement. The bridge design will be completed this year and then Construction funds will be requested. $16,000 design funds are remaining FY2011.

Comments:

Multiple* 141 and 142141-142 Shannon 3.5 Oglala to Loneman Pedestrian Trail and SuAnne Big Crow Trail from SuAnne Center to

Install Lighting for Safety $461,917

*$486,917 is funded from T-HUD. The Oglala-Loneman Trail lighting is 2 miles and the SuAnne Big Crow Trail lighting is 1.5 miles. Design will be remaining IRR Program funds. Const. will be under PL 93-638 with BIA

Comments:

TIGER III Grant, IRR

22-TIGER III Shannon 5 From BIA Route 27 to Section 20 near BIA Route 41

Planning, Preliminary Engineering, Reconstruction and Paving plus Construction

$5,600,000

The planning and grant submittal for the Cuny Table TIGER III project is being completed with IRR funds. The design will also be with IRR funding

Comments:

Total Amount for Construction Year $8,462,9172013

Construction Year 2014Funds RouteProject No. County Length Location Type of Work Amount

IRR MultipleCrush Shannon, Jackson and Bennett

N/A Stockpile locations throughout the Pine Ridge Indian

Reservation

Crush base course material $420,000

Crush base course material to be utilized on various IRR Program Funded projects. Material will be crushed on the reservation to reduce the long haul for present material purchases.

Comments:

IRR & SDDOT Enhancemnt

245Man-Tr. Shannon .1 From Manderson Housing to the Wounded Knee School

Construct a hiking trail for students to get to school

$60,000

Trail will be for safe access to school and for crossing BIA Rt. 33Comments:

Page 3 of 5

Page 22: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

IRRBP 6BR6 Jackson 0.1 Structure Number A122 over Corn Creek on BIA 6, 13 miles

northeast of Allen

Replace Structurally Deficient bridge with a box culvert

$600,000

The $50,000 FY 2010 funding for bridge design are on hold as it has not been determined whether this is a BIA Road or a Jackson Co. Road. Will only be done if a Project Agreement can be reached between the Oglala

Comments:

IRRBP 90BR90 Shannon 0.1 Bridge over White Clay Creek on Route 90, Moccasin Park

Lane, 0.5 mi. W. of US 18

Replace bridge with box culvert $700,000

Replace single lane bridge on Tribal Road 90. Bridge has been inventoried and the engineers are in the process of adding it to the bridge inventory, then design funds will be requested.

Comments:

Total Amount for Construction Year $1,780,0002014

Construction Year 2015Funds RouteProject No. County Length Location Type of Work Amount

IRR 4848 Shannon 1.3 Housing streets in Manderson Reconstruction of failing streets with PCC pavement on steep

hills

$1,440,000

Portions of the streets are on steep grades and the existing asphalt has crept and slid downhill.Comments:

IRRBP 88BR88 Shannon 0.2 White River bridge on Tribal Route 88, 7.9 miles northwest

of Oglala

Bridge Replacement $2,450,000

Existing bridge is deficient. It has been inspected and is presently being entered into the bridge inventory system. Will request funding as soon as a SI&A form is available this fall

Comments:

Total Amount for Construction Year $3,890,0002015

Construction Year 2016Funds RouteProject No. County Length Location Type of Work Amount

IRR 4949 Shannon 1.1 Wounded Knee Housing along BIA Route 28

Reconstruct Streets including drainage, curb and gutter plus

Asphalt Surfacing

$1,540,000

Existing streets are deteriorating. Construction funding planned for 2016Comments:

Page 4 of 5

Page 23: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

IRR 244244 Jackson 1.91 From Wanblee School along BIA 2 to the Housing areas

Construct and surface new trail $720,000

The trail is needed for safety of students and others moving from the housing areas to the villageComments:

IRR 246246 Shannon 0.53 From the theatre center and housing to the school in Kyle

Construction of a hiking and bike trail with hot asphalt

concrete pavement

$365,000

The trail is needed for safety of the students and othersComments:

IRR and PLH-D 4 Extension4-16 Bennett 3 The north end of Allen Road from BIA 22 to BIA 4

Reconstruction and hot asphalt surfacing plus adjacent trail

work

$1,910,000

If the PLH-D $2,000,000 is received the project will be completed in 2014. The funding shown below is IRRComments:

Total Amount for Construction Year $4,535,0002016

Page 5 of 5

Page 24: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 25: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Transportation Improvement ProgramRosebud Sioux Tribe

Construction Year 2012Funds RouteProject No. County Length Location Type of Work Amount

IRR BIA 14 / Sect 10-20

14-10, 20(1) Mellette 0.8 White River, SD (West of SD Hwy 83 and North SD Hwy 44

Milling, Patching, Overlay of all streets in housing development.

$1,380,000

$1,440.00, carry over from FY 2011.Comments:

IRR SD Hwy 83 /Sect

Todd 0.8 Mission, SD, and along SD Hwy 83 between the Rosebud

Casino Housing area.

New Pathway Construction $408,256

SDDOT project, State will reimburse less Tribe portion $102,065.00.Comments:

IRR See Comment

Todd BIA Route 1, Old SWA Hollywood, Soldier Hill, and

within Rosebud, SD.

Preparation of PS&E for Phase II and reconstruct existing

streets.

$3,332,138

$249,150 carry over from FY 2011. Schedule A 2013 ($1,123,200-Other Funding Source)(HPP)[Rt 1101;S 10.20; L .7]; Schedule B 2014 (IRR)[Rt 1103; S 10; L 1.5]; and Schedule C 2015 (IRR)[Rt BIA#1; S 20.10; L

Comments:

Total Amount for Construction Year $5,120,3942012

Construction Year 2013Funds RouteProject No. County Length Location Type of Work Amount

IRR SD HWY 83 & 44 / Sect

Mellette 1.4 Horse Creek 3 miles S of White River, SD. Corn Creek

6 miles of Noris,SD. Butte

Restoration and reconstruction of streets, and provide

sidewalks.

$1,812,658

$145,000 carry over from FY 2011.Horse Creek Rte # BIA 29; Section # 10; Corn Creek Rte # BIA 28; Section # 10 ; Butte Creek Rte # BIA 27; Section # 10 . 2012 PE is all 3 communities. 2013 Construction-Butte Creek.

Comments:

Total Amount for Construction Year $1,812,6582013

Page 1 of 2

Page 26: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Construction Year 2015Funds RouteProject No. County Length Location Type of Work Amount

IRR BIA 24 / Sect 10-20

24-10,20(1) Mellette 0.9 Norris, SD off of SD Hwy 63 in the tribal community of Black

Pipe.

Reconstruction of existing streets.

$1,694,918

$145,000 carry over from FY 2011.Comments:

Total Amount for Construction Year $1,694,9182015

Construction Year 2016Funds RouteProject No. County Length Location Type of Work Amount

IRR BIA 7 / Sect 10-20-40

Todd 7.5 Rosebud, SD to begin NW on top of Rosebud hill, or South of SD Hwy 18 (Parmelee Jct.) to

Crack sealing followed by chip seal application.

$166,144

Comments:

Total Amount for Construction Year $166,1442016

Page 2 of 2

Page 27: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Sisseton-Wahpeton Oyate
Page 28: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:02 PM

REPORT FILTERS: Location = A-09-347 program_class_code = F31 CSTIP Type = CSAny level CS/ECS/A/EA Report

Reporting each CSTIP that meets the filter.

Page 2 of 4

A0931700

A0945500

A0965000

A0965100

A0974500

A0975500

37,800

1,586,200

0

0

1,052,500

30,000

0

0

795,000

62,500

0

2,720,000

0

0

1,760,000

715,000

0

0

0

0

0

0

0

0

37,800

1,591,200

2,635,000

777,500

3,702,500

2,805,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 37,800

0 0

125,000 1,373,350

0 87,850

0 0 0 0

0 0 0 0

5,000 1,000,000

42,500 5,000

0 0

30,000 0

0 0 0 0

0 0 0 0

75,000 675,000

0 45,000

0 0

62,500 0

0 0 0 0

150,000 2,420,000

0 150,000

0 0 0 0

0 0 0 0

135,000 1,500,000

0 125,000

55,000 600,000

0 60,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 37,800

0 0

130,000 1,373,350

0 87,850

210,000 2,175,000

80,000 170,000

55,000 600,000 62,500 60,000

155,000 3,300,000

42,500 205,000

150,000 2,420,000

85,000 150,000

Short Foot Creek Bridge Replacement

Barker Hill Housing Streets

Long Hollow Road

Long Hollow Housing Streets

BIA 7 Roberts Co 5 to Barker Hill

BIA 7 Barker Hill to SD 10

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REPLACE

NEWCON

RECONS

RECONS

RECONS

RECONS

B

R

R

R

R

R

SD

7

7

7

7

7

46 - South DakotaState A09347 - Sisseton-Wahpeton Oyate

091 - Marshall

109 - Roberts

109 - Roberts

109 - Roberts

109 - Roberts

109 - Roberts

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

F31Program Class CodeCSTIP Type Fiscal YearCS 2012

Funding Amount 3,371,500

FIRST PAGE FOR CSTIPA09347 - SISSETON-WAHPETON OYATEEntity Name

0 0 0 0

5,000 0 0 0

0 0

80,000 0

0 0 0 0

150,000 2,300,000

0 200,000

0 0

55,000 0

0

5,000

80,000

0

2,650,000

55,000

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

Page 29: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:02 PM

REPORT FILTERS: Location = A-09-347 program_class_code = F31 CSTIP Type = CSAny level CS/ECS/A/EA Report

Reporting each CSTIP that meets the filter.

Page 3 of 4

3,371,500 3,390,000 4,258,000 5,355,000 3,975,000 20,349,500

20,349,500

3,371,500 3,390,000 4,258,000 5,355,000 3,975,000 20,349,500

A0976200

A0976400

A0976600

A0976800

A0983100

A09RM550

0

0

0

0

65,000

600,000

25,500

75,000

2,500

2,500

75,000

500,000

225,000

1,910,000

85,000

80,000

80,000

500,000

0

0

1,220,000

2,170,000

85,000

500,000

253,000

1,987,500

1,307,500

2,252,500

375,000

2,625,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

65,000 0

0 0 0

600,000

0 0

25,500 0

0 0

75,000 0

0 0

2,500 0

0 0

2,500 0

0 0

75,000 0

0 0 0

500,000

15,000 200,000

0 10,000

150,000 1,635,000

0 125,000

0 0

85,000 0

0 0

80,000 0

0 0

80,000 0

0 0 0

500,000

0 0 0 0

0 0 0 0

100,000 995,000

0 125,000

150,000 1,895,000

0 125,000

0 0

85,000 0

0 0 0

500,000

15,000 200,000 28,000 10,000

150,000 1,635,000

77,500 125,000

100,000 995,000 87,500

125,000

150,000 1,895,000

82,500 125,000

0 0

375,000 0

0 0 0

2,625,000

Peever Housing Streets

Sisseton Housing Streets

Waubay Housing Streets

Old Agency Housing Streets

Transportation Planning

Road Maintenance 23 USC 204 (C)

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

3,371,500 3,390,000 4,258,000 5,355,000

RECONS

RECONS

RECONS

RECONS

PLANING

PLANING

R

R

R

R

O

R

7

7

7

7

P8

T1

46 - South DakotaState A09347 - Sisseton-Wahpeton Oyate

109 - Roberts

109 - Roberts

037 - Day

109 - Roberts

109 - Roberts

109 - Roberts

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

F31Program Class CodeCSTIP Type Fiscal YearCS 2012

Funding Amount 3,371,500

A09347 - SISSETON-WAHPETON OYATEEntity Name

3,975,000

0 0

2,500 0

0 0

2,500 0

0 0 0 0

0 0 0 0

0 0

70,000 0

0 0 0

525,000

2,500

2,500

0

0

70,000

525,000

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

Page 30: South Dakota Tribal Transportation Improvement Plans 2013 – 2017
Page 31: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Transportation Improvement ProgramStanding Rock Sioux Tribe

Construction Year 2010/2011;close2012Funds RouteProject No. County Length Location Type of Work Amount

ERFO 44; Sec 60M09-00-132 Corson 0.4 4.5 Miles SE of Mahto SD Replacement / Construction $25,000

Existing Structure washed out in spring 2009 flooding; 100% ERFO Funds $1,737,120Comments:Oak Creek Bridge Replacement and

Total Amount for Construction Year $25,0002010/2011;close2012

Construction Year 2011; close2012Funds RouteProject No. County Length Location Type of Work Amount

PLHD 3900; Sec 10

A10-3900-2009(02)

Corson 1.6 Community Wide NEWCON $9,300

Received $588,950 in PLH-D Grant spent in FY 2011; Balance project costs paid with IRR funds estimated at $61,400, Closeout costs being paid with carry over dollars from previous FY

Comments:New Bear Soldier Street Improvements

Total Amount for Construction Year $9,3002011; close2012

Construction Year 2011; closeout 2012Funds RouteProject No. County Length Location Type of Work Amount

PLH-D 3; Sec 10 & 20 Partials

A10-3-2009(01)

Corson 2 From 6 mi north of Kennel north and west 2 +/- mi.

Surf. Patch / level / Rehab. in FY 2011

$10,000

Project & Added work completed in 2011; Closeout 2012; ARRA Funds $1,169,796, PLHD $1,862,000, Re-Dist Funds $2,000,000, Closeout costs being paid with carry over dollars from previous FY IRR Dollars

Comments:Kennel Road Reconstruction /

Page 1 of 2

Page 32: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Total Amount for Construction Year $10,0002011; closeout 2012

Construction Year 2016Funds RouteProject No. County Length Location Type of Work Amount

IRR 19; Sec 50A100019050________

Corson 0.2 Four Miles West and Two Miles South of Bullhead SD

Low Water Crossing Construction Over the Grand

River

$1,005,400

Design & Construction is pending arrangement of funds & approval of PLH-D Grant(s).; Design may start in 2015 with IRR program dollars

Comments:Joe Leaf Crossing

IRR 3400; Sec 80

A10-3400-2009(02)

Corson 1.5 From south end Running Antelope Dr south and east to

Big Foot Drive & West

NEWCON $1,100,000

IRR Funds then Possible Advanced Funding. Const is pending arrangement of funds & approval of PLH-D Grant(s).; Est Eng CE $250,000 / PE $165,000 [ IRR $$ &Larger Scope Expansion]; Const - $2,650,000

Comments:Little Eagle Street Expansion

Total Amount for Construction Year $2,105,4002016

Page 2 of 2

Page 33: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

INDIAN ROADS RESERVATION PROGRAMCSTIPS Module of ITIMS

CSTIP Report

The CSTIP report shows the full contents of one or more CSTIPS.For example, if the report is requested for a particular reservation with a managing entity that also manages two other reservations, then projects for all threereservations are reported. This means that subtotal amounts are always correct, no matter what the filter might be. However, see the next remark on how toread subtotals.

The CSTIP Subtotal is the full total for values on the CSTIP.The state subtotal is the sum of the values in the state and on the current CSTIP. This report does not show overall state totals.The location subtotal is the sum of values for projects on a particular reservation and in a particular state. When a reservation lies in two states, project datafor each part including the subtotal is presented in separate places.

Any type of CSTIP may be the subject of the report.

trpr13590
Text Box
Yankton Sioux Tribe
trpr13590
Text Box
Page 34: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:01 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 2 of 4

A0814100

A0821100

A0832100

A0833400

A0833500

A0840000

0

2,500

78,600

0

14,000

245,500

400,000

125,000

1,000

348,000

0

0

0

125,000

0

0

0

0

0

0

0

0

0

0

400,000

269,500

80,600

853,000

14,000

245,500

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

0 0

2,500 0

78,600 0 0 0

0 0 0 0

0 14,000

0 0

15,000 185,000 35,500 10,000

25,000 350,000 10,000 15,000

0 125,000

0 0

1,000 0 0 0

10,000 325,000

3,000 10,000

0 0 0 0

0 0 0 0

0 0 0 0

0 125,000

0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

25,000 350,000 10,000 15,000

4,000 261,500

2,500 1,500

80,600 0 0 0

37,000 775,000

6,000 35,000

0 14,000

0 0

15,000 185,000 35,500 10,000

TOWNSHIP MULT-ROUTE GRAVELING

NORTH WAGNER STREETS

YANKTON TRANSIT PROJECT

WAGNER SOUTH HOUSING STREETS

MULTI-ROUTE STRIPING

SD HWY 46 TURN LANE

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

RECONS

TRANSIT

REHAB

SAFETY

RECONS

R

R

R

R

O

R

3

7

T2

7

P2

7

46 - South DakotaState A08346 - Yankton Sioux Tribe

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 960,600

FIRST PAGE FOR CSTIPA08346 - Yankton Sioux TribeEntity Name

0 0 0 0

4,000 11,500

0 1,500

1,000 0 0 0

27,000 450,000

3,000 25,000

0 0 0 0

0 0 0 0

0

17,000

1,000

505,000

0

0

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 35: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:01 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 3 of 4

A0840100

A0843500

A0843600

A0883101

A0883102

A0883103

0

330,000

0

15,000

5,000

65,000

0

0

0

0

0

65,000

0

0

569,000

0

0

85,000

0

0

525,000

0

0

85,000

350,000

330,000

1,094,000

15,000

5,000

365,000

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

CECONS

PEZ

0 0 0 0

20,000 290,000

0 20,000

0 0 0 0

0 0

13,500 1,500

0 0

4,500 500

0 0

65,000 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

65,000 0

0 0 0 0

0 0 0 0

50,000 425,000 49,000 45,000

0 0 0 0

0 0 0 0

0 0

85,000 0

0 0 0 0

0 0 0 0

60,000 400,000

0 65,000

0 0 0 0

0 0 0 0

0 0

85,000 0

15,000 320,000

5,000 10,000

20,000 290,000

0 20,000

110,000 825,000 49,000

110,000

0 0

13,500 1,500

0 0

4,500 500

0 0

365,000 0

MARTY MAIN STREET

MARTY NORTH ACCESS RD

FIFTH STREET EXTENSION

Yankton Sioux Inventory Update

Yankton Sioux Long Range Transportatio

YANKTON SIOUX TRANSPORTATION

Total

Total

Total

Total

Total

Total

Phase

Phase

Phase

Phase

Phase

Phase

REHAB

NEWCON

NEWCON

PLANING

PLANING

PLANING

R

R

R

O

O

O

6

7

7

P8

P9

P9

46 - South DakotaState A08346 - Yankton Sioux Tribe

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

023 - Charles Mix

Name

Name

Name

Name

Name

Name

County

County

County

County

County

County

Project Type

Project Type

Project Type

Project Type

Project Type

Project Type

Work Type

Work Type

Work Type

Work Type

Work Type

Work Type

PCAS

PCAS

PCAS

PCAS

PCAS

PCAS

Class

Class

Class

Class

Class

Class

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 960,600

A08346 - Yankton Sioux TribeEntity Name

15,000 320,000

5,000 10,000

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0

65,000 0

350,000

0

0

0

0

65,000

Total

Total

Total

Total

Total

Total

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2012 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2013 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2014 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2015 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

FY 2016 ($)

29-MAY-12

Page 36: South Dakota Tribal Transportation Improvement Plans 2013 – 2017

Indian Reservation Roads ProgramsFederal Lands Highway

30-MAY-2012 12:01 PM

REPORT FILTER: Reporting one CSTIP.

CSTIP Report

Page 4 of 4

960,600 1,038,000 1,039,000 1,029,000 860,000 4,926,600

960,600 1,038,000 1,039,000 1,029,000 860,000 4,926,600

4,926,600

960,600 1,038,000 1,039,000 1,029,000 860,000 4,926,600

A08RM550

205,000 100,000 250,000 250,000 905,000

CECONS

PEZ

0 0 0

205,000

0 0 0

100,000

0 0 0

250,000

0 0 0

250,000

0 0 0

905,000

ROAD MAINTENANCE 23 USC 204 (C)

TotalPhase

960,600 1,038,000 1,039,000 1,029,000

PLANING

O

T1

46 - South DakotaState A08346 - Yankton Sioux Tribe

023 - Charles MixNameCountyProject TypeWork Type

PCASClass

Location Covers that part of the reservation within the current state.Projects on the CSTIP withn this state are listed and subtotaled in this section

Location Subtotal

State Subtotal

CSTIP Subtotal

Report Total

31EProgram Class CodeCSTIP Type Fiscal YearTIP 2012

Funding Amount 960,600

A08346 - Yankton Sioux TribeEntity Name

860,000

0 0 0

100,000 100,000Total

FY 2012 ($) FY 2013 ($) FY 2014 ($) FY 2015 ($) FY 2016 ($)

29-MAY-12