IMARC 2017Dr Paul Heithersay
Department of the Premier and Cabinet, South Australia
SOUTH AUSTRALIA’S MINING INFRASTRUCTURE PLANNING
Public
DisclaimerThe information contained in this presentation has been compiled by the Department of the Premier and Cabinet (DPC) and originates from a variety of sources. Although all reasonable care has been taken in the preparation and compilation of the information, it has been provided in good faith for general information only and does not purport to be professional advice. No warranty, express or implied, is given as to the completeness, correctness, accuracy, reliability or currency of the materials.
DPC and the Crown in the right of the State of South Australia does not accept responsibility for and will not be held liable to any recipient of the information for any loss or damage however caused (including negligence) which may be directly or indirectly suffered as a consequence of use of these materials. DPC reserves the right to update, amend or supplement the information from time to time at its discretion.
www.minerals.dpc.sa.gov.au
Public
What is the outlook?
Metals and Mining Index indicates heading out of the down-cycle
Public
Existing minesBHP: Olympic Dam copper-gold-uranium mine expanding
OZ Minerals: Prominent Hill copper-gold mine expanding
Liberty OneSteel: Middleback Ranges new owner
Heathgate Resources : Beverley and Four Mile potential
Hillgrove Resources: Kanmantoo Copper mine potential
New/recommissioned* MinesHavilah Resources: Portia gold mine
WPG Resources: Challenger gold mine*
WPG Resources: Tarcoola gold mine
Cu-River: Cairn Hill magnetite iron ore mine* New investor
Advanced PermittingOz Minerals; Carrapateena copper mine ( CAPEX $1 bill)
Iron Road : Central Eyre Iron Project ( CAPEX $4 bill)
Major Mines and Projects 2017
Public
SA Mineral and Energy Resources Exports
Mineral and petroleum resources continue to deliver as one of the State’s major export sectors.
Contributing $3.6 billion(33%) to the State’s $10.9 billion exports in 2016.
Public
Economic Priority: Unlocking the full potential of South Australia’s resources
Discovering Resources Giving Confidence
Transforming Resources
Innovation for complex challenges
Readiness for commodity cycle upswing – Cu, Au, Fe, oil/ gas
Urgent / critical response to industry and community needs
Econom
ic and social developm
ent for SA
Public
Discovering Resources
8
PACE Discovery program and PACE Gas
Copper Strategy and Magnetite Strategy
South Australia Drill Core Reference Library
Strategic global, local agreements,
partnerships
Public
PACE ProgressCoompana Radiometric / Magnetic Survey – Magnetics Q2 2016 and Radiometrics Q3 2016
Minerals System Drilling Program – final debrief / workshop delivered August 2016
Eucla Basin / Basement Deep Crustal Seismic Survey – final release August 2016
Depth to Basement / 3D State Model – released Q3 / 4 2016
Gawler Craton Radiometric / Magnetic / DEM Survey – commenced January 2017
Coompana Drilling Program – commenced April 2017
Musgrave AEM Survey – released April 2017
Coompana Geophysical Gravity Survey – commenced Jan 2017; data released April 2017
Central Olympic Domain infill MT and AEM – commence Q2 2017
Fowler Domain AEM – commence Q2 2017
PACE Discovery Drilling 2016 – completed by June 2017
Coompana / Fowler Geochemistry – commence Q2 2017
Northeastern SA AusLAMP MT Program – South Australian program to be completed Q3
Public
Accelerate Exploration, Discovery and InformationPACE Copper - Accelerating Exploration,
Discovery and Information
10
Gawler Craton Geophysical Survey Phase 1 complete Phase 2 commenced
Public
PACE Copper - Accelerating Exploration, Discovery and InformationCoompana Drilling program - first drill core in 30 years
Public
Giving confidence Consistent regulatory
framework egMining Act 1971 & Planning, Development and Infrastructure Act 2016
New SARIG – South Australian Resources Information Gateway
Leading Practice Mining Acts Review
Stronger Partners Stronger Futures
Public
Transforming Resources Regional Mining and
Infrastructure Plan PACE Supply Chain
Development Program Mining Services Centre of
Excellence 50 Yr Port Strategy
Innovating Our Energy Plan Steel Task Force Port Pirie Transformation
Public
Regional Mining Infrastructure Plan
• Identified potential infrastructure solutions to support mining development
• Assessed on the basis of their economic, social and environmental implications
• Resources Infrastructure Task Force works with private sector stakeholders to facilitate key infrastructure projects and development
• Reports directly to the State Minister for Mineral Resources and Energy
• http://rit.statedevelopment.sa.gov.au/about-rit
Public
First Report – Bulk Mineral Port Solutions 3 most prospective locations to meet potential demand for bulk minerals exports from the Spencer Gulf region
Public
Eyre & Western Region
Far North Region
Yorke & Mid North, Braemar Region
South Australia Major Mines and Developing Projects and associated Regional Infrastructure
Public
2. Develop 3. Grow
66kv Transmission line Wudinna ‐
Ceduna
132kv Transmission line Cleve ‐Wudinna
132kv Transmission line Pt Lincoln ‐
Whyalla
Jacinth‐Ambrosia recommencing operations late
2017
Eyre Highway
Trans Australia Railway
Ceduna‐ Port LincolnWater pipeline
Proposed alternative Export option established
at Whyalla during Thevenard Port upgrade
Proposed Port Hardyinitial 70mtpa capacity
support Panamax/Capesize vessels
CEIP Infrastructure Corridor
Rail, Power Water to new multi‐user Port
Central Eyre Railway
GFG AllianceWhyalla
Power Plant 9MW
EYRE & WESTERN REGION
Central Australia Railway
Pt Lincoln –Buckleboo Railway
Next Stage – Regional Solutions
Public
Battery Storage & Renewable Technology
fundNew Generation
More CompetitionState-owned Power Plant
New Powers to take Charge
South Australian Gas
Incentives
Energy Security Target
Our Energy Plan
ourenergyplan.sa.gov.au
Public
Our Energy Plan – Battery Storage
Public
• SolarReserve plant near Port Augusta
• 150MW plant • $650 million project• Construction begins 2018 –
expected completion date 2020
• 700 jobs – with requirements for local workers
Our Energy Plan – SolarReserve
Public
Resources Infrastructure & Investment Task Force
The Task Force delivers transformative outcomes for South Australia by securing significant resource investment projects
2. Develop 3. Grow
Public
South Australia – Open for Business
Government Support – Development
• Stable transparent regulatory framework – to build confidence with development partners and community.
• Coordinated approach between government and industry for infrastructure solutions.
• Investment support throughout the value chain.
• Case management approach with mining proponents for government approval processes –efficient, dedicated partnering to cover Mining Act 1971 & Development Act 2016
• Further improvements underway for streamlining processes and approvals.