o SomersetREGIONAL COUNCIL
Officer: Mathew Stevens,planning officer - graduatePhone: (07) 5424 4000Application reference: DA19341Applicant reference: 192033
8 May 2020
Julie RollinsonC/- Elizabeth FranklinPO Box 221BRIBIE ISLAND QLD 4507
Email: [email protected]
Dear Ms Franklin,
Decision Notice - Approval (with Conditions)Given undersection 63(2)of the PlanningAct 2016 ?
SomersetRegional Council as the Assessment Manageracknowledgesreceipt of theabove application on 16 April 2020 and confirm the followingdetails:
RE: Development application for Building Works assessable against the PlanningScheme for two DomesticOutbuildings(siting relaxation)situated at 79 Roberts Court,Sandy Creek on land described as Lot 21 on SP223301.
I wish to advise that, on Tuesday5 May 2020, the above developmentapplicationwasapproved in full with conditions. The conditions of this approval are set out inAttachment 1.
1. Details of the approval
The applicationis not taken to have been approved (a deemed approval)under section64(5)of the PlanningAct2016.
The following approvals are given:
DevelopmentPermit Building Works assessable against the Planning Schemefor two Domestic Outbuildings(siting relaxation)
2. Further developmentpermitsThe followingdevelopmentpermits are required to be obtained before the developmentcan be carried out:
- Building Permit
ABN 50 138 958 249CouncilChambers- 2 RedbankStreet, Esk QLD 4312
Address all correspondence to - ChiefExecutiveOfficer, SomersetRegional Council,PO Box 117, EskQLD 4312P 0754244000 F 0754244099 E [email protected] W www.somerset.qld.gov.au
3. Approved plans and/or documentsThe approved plans and/ordocuments for this developmentapprovalare listed in thefollowingtable:
Plan/Documentnumber Plan/Documentname Date
Job No. 1631, Sheet 1 of 3 Site Plan .-- preparedby Sunset Design April 2020Drafting
Job No. 1631, Sheet 2 of 3 Shed No. 2 Elevations and Floor Plan - April 2020preparedby Sunset Design Drafting
Job Mo. 1631, Sheet 3 of 3 Shed No. 1 Elevations and Floor Plan - April 2020preparedby Sunset Design Drafting
4. Lapsing of approval at end of currencyperiod (s85 PlanningAct 2016)A partof a developmentapproval lapses at the end of the followingperiod (the currencyperiod)-
(a) For any part of the developmentapproval relating to a Material Change of Use
-if the first changeof use does not happen within -a. The period stated for that part of the approval; or
b. If no period is stated - 6 years after the approval starts to have effect.
(b) For any part of the developmentapproval relating to Reconfiguringa Lot -if a
plan for the reconfigurationthat, under the Land Title Act, is required to be givento a local governmentfor approval is not given to the local governmentwithin-a. The period stated for that part of the approval; or
b. If no period is stated - 4 years after the approval starts to have effect.
(c) For any part of the developmentapproval relating to any other development(i.e. Operational Work)-
if the developmentdoes not substantiallystart within
a. The period stated for that part of the approval; orb. If no period is stated -2 years after the approvaistarts to take effect.
(d) If part of a developmentapproval lapses, any monetarysecurity given for thatpart of the approval must be released.
5. Extension applications(1) A person may make an application (an extension application) to the
assessmentmanager to extend a currency period of a developmentapprovalbefore the approval lapses.
(2) The extension applicationmust be -a. Made -i. If the assessment manager has a form for the application - inthe form; or
ii. By notice; and
b. Accompaniedby -i. The required fee; andli. To the extent the application relates to premises, other than
excluded premises, for which the applicant is not the owner -the written consent of the owner of the premises to theapplication.
6. Lapsing of approval for failing to complete development (sB8 Planning Act2016)
(1) A development approval, other than a variation approval, for developmentlapses to the extent the development is not completed within any period orperiods required under a developmentcondition.
(2) A variation approva/fordevelopmentlapses to the extent the developmentisnot completed within -a. If a developmentcondition required the developmentto be completed
within a stated period or periods - the stated period or periods; orb. If paragraph (a) does not apply - the period or periods the applicant
nominated in the developmentapplication; orc. Otherwise-
5 years after the approval starts to have effect.(3) However, despite the lapsing of the developmentapproval, any security paid
under a condition stated in section 65(2(e) of the PlanningAct 2016 may beused as stated in the approval or agreement under section 67 (to finish thedevelopment, for example).
7. Dispute Resolution - Appeal Rights- Chapter6 Part 1 PlanningAct2016The rights of an appilcantto appeal to a tribunal or the Planning and EnvironmentCourtagainst a decision about a developmentapplicationare set out in chapter 6, part 1 ofthe PlanningAct 2016. For certain applications, there may also be a right to make anapplication for a declaration by a tribunal (see chapter 6, part 2 of the PlanningAct2016).
Aooealby an applicant
An applicant for a development application may appeal to the Planning andEnvironment Court against the following:? the refusal of all or part of the developmentapplication? a provision of the developmentapproval? the decision to give a preliminary approval when a development permit was
applied for? a deemed refusal of the developmentapplication.
An applicantmay also have a right to appeal to the Developmenttribunal. For moreinformation, see schedule 1 of the PlanningAct2016.
Attachment 2 is an extract from the PlanningAct 2016 that sets out the applicant'sappeal rights and the appeal rights of a submitter.
To stay informed about any appeal proceedings which may relate to this decisionvisit:https://plannina.dsdmip.qld.aov.au/planninq/our-planning-system/dispute-resolution/pe-court-database.
Should you wish to discuss the contents of this decision notice, please contactCouncil's planning officer graduate,Mathew Stevenson (07) 5424 4000.
Yours sincerely
Andrew JohnsonChief Executive Officer
Attachment1 - Conditions of the approvalAttachment2.-- Extract on appeal rights
Attachment 1
- Conditions of Approval
SCHEDULE1 .-. PlanningAssassmentManagerNo Condition Timing1.1 Carry out the developmentgenerally in accordancewith the At all times.
material contained in the development application,supporting documentation and the plan listed below, exceptwhere amendedby these conditions of approval.Site plan, Prepared by Sunset Design Drafting, Dated April2020, Job No. 1631. Sheet 1 of 3.Shed No. 2 Elevations and Floor plan, Prepared by SunsetDesign Drafting, Dated April 2020, Job No. 1631, Sheet 2 of3.Shed No. 1 Elevations and Floor plan, Prepared by SunsetDesign Drafting, Dated April 2020, Job No. 1631, Sheet3 of3.
1.2 Complywith the relevant provisions of the SomersetRegion At all times.Planning Scheme, Planning Scheme Policies and LocalLaws.
1.3 Unless otherwise approved by Council, the domestic At all timesoutbuildings are never to be occupied by persons on apermanent, semi-permanent or intermittent basis, or anyother residential use associated with a Class 1 building asdefined by the Building Codes of Australia.
SCf EDULE 2 - EngineeringAss7ssmentManagerNo Condition Timing2.1 All buildings, structures, fittings, fixtures and grounds At all times
forming part of this development approval must bemaintained.-.
? in a serviceablecondition; and? in a state of good repairand efficient action; and? in a clean, sanitary condition; and? free of accumulated disused materials; and? free of vermin and pest infestations,
2.2 All construction / demolitionor other waste is to be removed At all times.from site and deposited at an approved waste disposalfacliity in a manner acceptable to Somerset RegionalCouncil unless otherwise authorised by Council.
2.3 Light sources must be positioned, and shieldedwhen At all times.necessary, to prevent light spillagecausing a nuisance toany other premises outside the boundaries of the propertyto which this development approval relates.
SCHEDULE 3 - AdviceAssessmentManagerThis approval has effect in accordance with the provisions of section 71 of thePlanningAct2016, and development may commencein accordancewith section 72.
CurrencyPeriod - Pursuant to section 85 of the PlanningAct2016the approval willlapse if the first change of the use under the approval does not start within the'currency period' - being two (2) years starting the day the approval takes effect.
The applicant may make representations(change representations)about a matterin this development application within the applicant's appeal period under theprocess established in chapter3, part 5, subdivision1 of the Planning Act2016.
The PlanningAct2016provides for a person to make a change to this developmentapplicationoutside the applicant's appeal period, following the process outlined inchapter 3, part 5, subdivision2 of the Act.
Separate development approval is required for any building work andplumbing/drainagework necessitatedby the conditionscontained in this approval.
Dust pollutionarising from the construction and maintenance of the works requiredby this approval are the applicant's responsibility. The applicant must comply withany lawful instruction from Council Operationsdepartment if in Council's opinion adust nuisance exists.
The rights of applicants to appeal to a tribunal or the Planning and EnvironmentCourt against decisions about a developmentapplication are set out in chapter 6,part 1 of the PlanningAct2016. For particularapplications,there may also be a rightto make an application for a declaration by a tribunal (see chapter 6, part 2 of thePlanning Act 2016).
Landownersare responsiblefor the constructionand maintenanceof any vehicularaccess for the property, from the road carriagewayto propertyboundary in
accordancewith Council'sstandards.
NOTES1. DESIGNEDIN ACCORDANCEWITHBCA
2.ALLCONSTRUCTIONTOBE1NACCORDANCEWITHTHEFOLLOWING
AUSTRALIANSTANDARDSANDCODESASREFERENCEDINTHE
BUILDINGCODEOFAUSTRALIA.AS 4200-1994CODEOF PRACTlCEFORPllABLE BUILDINGMEERANES.
AS 1562-1992 DESIGNANDINSTALLATIONOFMETALROOFING
AS 20$0- 2002 INSTALLAT1ONOFCONCRETEROOFTILES
AS2870-2011 RESIDENTIALSLABSANDFOOTINGSAS2904-1995 DAMPSROOFCOURSESANDFLASHINGS
AS3T00-2001 MASONRYSTRUCTURESAS 1684-2010 CODEOFPRACTICEFORCONSTRUCTION
INTIMBERFRAMINGAS 3660-2000TERMITEMANAGEMENT
AS 3740-2010WATERPROOFINGOF DOMESTICWETAREAS
3.WRITTENDIMENSIONSTAKEPREFERENCEOVERSCALE
4.R00FWATERRUNOFFTOSTREETCHANNEL/STORMWATERDRAINMTH
90mmPVCPIPES$11N100FALLMIN.(U.N.0JS.LEVELOFSLABTO RESIDENCEBY BU1LDERTO GIVEEOUALCUTAND
F$LL.TAPERBATTERSTO11N2CUTAND11N4FILimax6. LIGHT& VENTILATIONTOCOMPLYMTHBCACLAUSES3.8.4& 3.8.5
7. SMOKEALARMSMUSTCOMPLYMTH PART3.7.2OFTHE BCA
8. PROVIDETHRESHOLDSTOEXTERNALDOORSIN ACCORDANCEWITH
CLAUSE3.9.1OFBCA(WHERESTEPDOWNSAREMORETHAN190mm)9. DESIGNWINDLOADINGASPERAS1684-201010. PINEFRAMINGTOBE MINIMUMSTRESSGRADEMGP10
& MlNIMUM.10lNTGROUPJD4
11. HARDWOODTOBEMINIMUMSTRESSGRADEF14
& MINIMUMJOiNTGROUPJ2
12.LAMINATEDBEAMSIZESBASEDONt(YNEBEAM
SPANTABLES,WHERECTHERBRANDSAREUSEDSIZESTOBECONFIRMEDWITHMANUFACTURERSSPECIFICATIONS
13.BUILDERANDTRADESARETOCONFIRM
ALL MEASUREMENTS,DETAILSAIO SPECIFICATIONS
PRIORTOSETOUTANDORDERINGOFMATERIALS
14. ANY ERRORSARETO BEADDRESSEDTOTHE
DESIGNERAS NORESPONSIBlUTYWILLBETAKEN
AFTERCONSTRUCTIONHASCOMMENCED.
15.ALLTRADESARETO CONFORMWITHTHE
CURRENTAUSTRAUANSTANDARDSRELATING
TOHISORHERWORK.
16.WINDOWSl2ESANDMOV1NGPANELSARETO
CONFIRMEDWITHTHEBUILDERBEFOREORDERÉNG.
STANDARDMNDOWS INDICATEDUNLESSNOTED.
SITEDETAILS
REALPROPERTYDESCRIPTION - --LOT21 ON SP 223301
PARISHOF
COUNTYOFAREAOFS1TE: 3.076HECTARES
S TORMWATERTO BE DIRECTED INTO
EXISTINGDRAINAGE SYSTEM WITH
90mmPVC PIP1NG@ 1 IN 100 FALL OR IN
ACCORDANCE WITHLOCAL AUTHORtTY
DA19341GENERALNOTES1. DIMENS10NS ARE TO BE VER1FIEDPRlOR TO
COMMENCEMENTOFWORKS.IF ANYD(SCREPANCIES ARE NOTICED THEY ARE TO BE
REPORTED IMMEulATELY.2. GIVEN DIMENSIONS ARE TO HAVE PRIORITYTO E
SCALEDDIMENSIONS.3. ALL GROUND LEVELSARE APPROXIMATE ONLY.
4. ALL PLUMBING AND DRA1NAGEIS TO COMPLYWITH THE RELEVANT STANDARD SEWERAGE BY-
LAWSAND REOUIREMENTSOFTHE LOCALAUTHORITY.
5. ALL STAJRSARE TO HAVE A 190mm MAX RISERSAND250mmMINTREADS.
6. ALLWORMSARETO BECARRIEDOUT INACCORDANCE TO THE BUILD(NG CODEOF AUSTRALIA
AIORELEVMTAUSTRALIANSTANDARDSNOTECHNICM.MANUALS7. DISCLAIMER
DRIVEWAYS, PATHS, CLOTHESLINES,STORMWATERLINES.LANDSCAÞiNG.LETTERBOX,HOT WATERSYSTEM AND GULLYPITS ARE DIAGRAMMATICONLY.
FOR SHAPE OR POSmON REFER TO THE BUILDERSSPECIFICATIONSFOR DETAILS.
8. ALL DOWNPIPESARETOBEINSTALLEDINACCORDANCEWITH THE B.CACLAUSE 3.5.2.
9. StTEEXCAVATIONSHALL BE SUCH THAT1000mmMDEBY 1:20 GRADES EXlSTSAROUNDTHE
PERIMETER OFTHE BUILDINGAS PER B.C.A. 3.1.2.
SURFACE WATER DRAINAGE
10. OWNER TO PROVIDEANSTALLSITE DRAINAGE
AFTER HANDOVERIS REQUIRED.
- Attachment 1
PATIOROOF OVER EXISTNGCONTAINER FLOOR PLAN
11. ALL DR1VEWAYSAND PATHS ARE TO BE
CONSTRUCTEDTOTHE LOCALAUTHORITY'S ,15.OmSATISFACTIONAND THE AUSTRALIAN STANDARDS.
E
o
EXISTINGSHED
5.0m
Eo
EXISTINGSEPTfC
PROPOSED OWATERTANK
PROPOSEDTIMBERRETAINING WALL E
1.0m -'cPROPOSED'FENCING
EXISTINGPROPOSED10.0 x 6.0m DWELLINGSHED NO.1 IN ACCORDANCEWITH MANUFACTSSPECS. o6.On? o
PROPOSEDSHEDNO. 2 EXTENSIONS
EXISTfNGDAM
ROBERTS COURT
PPRC)Vm>SESSMENTMANAGER
DA 1 9 3 4 1 - 5 MAY2020
SITE PLANWINDLOADING- N3SCALE1:1000
ETNUERROLSTEINBACK CL ENT QCOPYRIGHTANDPROPERTYRESERVED- REVISIONDATE
P O. BOX 76 ROLUNSON '63 Do mSDOCUMENTISANDSHALLREMAiNTHEFINALS 01 OV04/20PRnlWRTYOFSUNSETDESIGNDRAFTING
BEERBURRUMOLD. 4517 PROJECT UNAUTHORISEDUSEOFTHISDOCUMENTIN
PFS/dNPEAFf/Nd PROPOSED EXTENSlONS APR 2020 ANY FORMWHATSOEVERISPROMIBITED.
n u d net.auNO. 79 ROBERTSCOURT "hyp@*©"$°"'"E
u//d/rryzpsr dream5fah5 /rre oscc t,c no. 317s9S SANDYCREEK 1 OF3 EJS PREFERMCEOVERSCALEDOSONS.
EXISTING PROPOSED PROPOSEDSHEETROOFNG PROPOSEDSHEETROOFING
DA19341 - Attachment2PROPOSEDSTET
R00FMG@5'PITCH
. . . . . . . . . .
.. . . . . ... . . . . . . . . . . . . . . . . . . . . . - . . . . . . . . . . . .
TOMATCHEXISTNG - - - ' ' - -CEILING
SLAB
__75x75SHS PROPOSEDWAI.LSÆET1NG
FRONT ELEVATION °°'"""" '°~°"-"° SIDE ELEVATION
D
EXISTING PROPOSED 2 x STEEL FRAMEDSTUDWALLS
PaoPOSEDSHEDEXÉNSION
NOTE :
APPROX.1 mm CONCRETESLAB TO,MATCHEXISTtNG
75x75 SHSCENTRE COLUMN
WNOTE :
APPROX.100mmCONCRETESLABTO MATCHEXISTING PROPOSEDSHED 8
75x75 SHSCOLUMNS
[P OP O
2905 2910 jþ 2905 2905 3925 |k 39251l75 175 '1175 175 175 il75 175
20000
PLAN LEGEND SHED No. 2 EXTENSION FLOOR PLANDP - INDICATES POSSIBLE POSIT10N FOR PROPOSEDSHED EXTENSION 64.0 SOM
DOWNPIPES (TO BE CONFtRMEO BY PROPOSEDAWNING AREA 70.0 SOMBUILDER)
APPRO\/E E)mHsd Regional Cenci!
tu !&,ESSME!HMANAGER
DA 1 9 3 4 1 - 5 MAY2020
NOTE :
ALL NEW STEEL WALL FRAMING.ROOF TRUSSES, SLAB &
FOOTINGS, CONNECTIONSTO ENGINEERSSPECS.
NOTE : ALL MEASUREMENTSARE TO BECONFlRMEDON SITE PRIOR TOCOMMENCEMENTOF CONSTRUCTIONAND THE ORDERING OF MATERAILS.
ETUNERROLSTEINBACK CLIENT
P.O.BOX 76 ROLLINSONBEERBURRUM.OLD. 4517 PROJECT
RS/dNWAff/Nd ':ei O°4e °: PROPOSEDEXTENSIONSE - [email protected] NO. 79 ROBERTSCOURT
"MJ//d/nqyasr drean stæts here" ascc uc.no.- 1317698 SANDY CREEK
¢ COPYRIGHTAND PROPERTYRESERVED. REVISIONDATE1631 100 T MENT
SETDLRE NTHE
FINALSO1.01/04/20. sus"*" UNAUTHORISEDUSEOF THISDOCUMENTIN
APR 2020 ANYFORMWHATSOEVERIS PROHIBITED.
UILDER SHMLVElWY DIMEMSIONS ONSETE
20F3 EJS PRE O MENSIONS.
NOTE :
PROPOSED1.5mHIGH MAX.TIMBERRETAIN4NGWALLTO BUILDERSSPECS.
DA19341 - Attachment 3NOTE : EXISTING3 x WATERTANKS2.3 TO 2.8m HIGHTREATEDPINE FENCINGIN 1.0m x 450 DIA. MASSCONCRETEFOOT1NGS.TO BUILDERSSPECS.
NOTE :
2.0m HIGH TREATEDPINE FENC]NGIN 1.Om x 450 DIA. MASSCONCRETEFOOTkNGS.TO BUILDERSSPECS
SHED No. 1 & FENCE PROPOMDS 0
SIDE ELEVATION
PROPOSEDSHEETROORNGeAPPROX.FMCH
|||||||1|||||||||||||\|||| |||| |'
s PATIO ROOFCOLUMNS
FRONT ELEVATION
7500 r,1 1
ROOFBEM
NOTE :
METALANGLEBRACKETSTO FIX RAFTERSTOCONTAINERROOFTOENGINEERSSPECS.
METALANGLEBRACKETS
U '
O
TO FFX CONCRETE NOOFBEMBLOCKSTOCONTAJNER
TO ENGINEERSSPECS. 12$ PROPOSEDE PATIOe
NOTE :
METALANGLEBRACKETSTOFIX RAFTERSTO CONTAINERROOFTOENGINEERSSPECS.
[email protected]'PITCH
aO N1% ON
S B
PATIO ROOF
SHED No.1END ELEVATION
NOTE:PROPOSED1.5m HIGH MAX, TIMBERRETAININGWALLTO BUlLDERS SPECS.
SIDE ELEVATION
753230
753235
753235
75
or k ASkSSMENT MANAG?F '--------?---------N-- - - - - - - - =
o PLANLEGENBA1 9 3 4 1 - 5 W 2020 NOTE:
ALL NON LOADBEARINGTIMBERDP - INDICATESPOSSIBLE POSITION FOR STUDWALLSTO BE 70 X 35mm
DOWNPIPES(TO BE CONFIRMED BY BUILDER MGP12,TO BUILDERSSPECS.
NOTE:.LL
MEASUREMENTSARETOBECONFI ED ON SITE PRIOR TO
.PROPOSED
COMMENCEMENT OF CONSTRUCTION . @ SHED/ CARPORTAND THE ORDERlNG OF MATERAILS.
5 S
DP BES2400 ||, 2400 |b 2400 |µ NOTE :
Il75 ll75 ¶l75 1l75 ALL NEW STEEL WALL FRAMING,ROOFTRUSSES SLAB&
PATIO ROOF OVER EXISTNG FOOTINGS,CONNECTIONS
CONTAINERFLOOR PLAN TOENGINEERSSPECS.
PROPOSEDPATIO ROOF AREA : 36 0 SOM
10000
SHED No. 1 FLOOR PLANPROPOSEDSHED 1 AREA 60.0 SOM
UN E ERROLSTEINBACK CLIENT GHTENTSANTHE
REVISIONDATE
P.O.BOX 7e ROLLINSON FINALS01.01/04/20.BEERBURRUM.OLD, 4517 PROJECT
S ®®® UNAUTHOR5SEDUSE OFTHISDOCUMENTIN
PBS/dNPFMf/Nd °' PROPOSED EXTENSIONS ^PR 2020 ANY FORMWHATSOEVERkSPROHIBITED.
29net.au No. 79 ROBERTSCOURT |'ä|ETÉoNS"'l'S*°'*°"TJi/d/nq /µ3r drean stats here'' QBCC Lic. no. - 1317698 SANDY CREEK 30F3 EJS PREFERENCEOVERSCREDDRENSIONS.
PlanningAct2016Chapter B DIspute resolution
{s2291
(2) 'llie person is taken to have engaged in the representative'sconduct, unless the person proves the person could not haveprevented the conductby exercising reasonablediligence.
(3) In this section-conductmeans an act or omission.
representativemeans-(a) of a corporation-anexecutive officer, employee or
agentof the corporation; or(b) of an individual-an employee or agent of the
individual.
stateofmind. of a person, includesthe person's-(a) knowledge, intention, opinion. belief orpurpose; and
(b) reasons for the intention, opinion.beliefor purpose.
Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1) Schedule I states-(a) matters that may be appealed to-
(i) either a tribunal or the P&E Court;or
(ii) only a tribunal;or
(iii) only the P&E Court;and
(b) theperson-(i) who may appeal a matter (theappellant);and
(ii) who is a respondentin an appealof the matter;and
PlannirigAct 2016Chapter6DIsputeresolution
[s 2291
(iii) who is a co-respondent in an appeal of the matter;and
(iv) who may elect to be a co-respondent in an appealof the matter.
(2) An appellant may start an appeal within the appealperiod.
(3) The appealperiod is-(a) for an appeal by a building advisory agency-10
businessdays after a decisionnotice for the decision isgiven to the agency; or
(b) for an appeal against a deemed refusal-,at any timeafter the deemedrefusal happens;or
(c) for an appeal against a decision of the Minister, underchapter7. part4. to register premises or to renew theregistrationofpremises-20businessdays aftera noticeis publishedundersection269(3)(a)or (4); or
(d) for an appeal against an infrastructurechargesnotics20 business days after the infrastructure charges noticeis given to the person; or
(e) for un appeal about a deemedapproval ofa developmentapplication for which a decision notice has not been
given-30 business days after the applicant gives thedeemedapproval notice to the assessment manager; or
(f) for an appeal relatingto the PlumbingandDrainageAct2018-(i) for an appeal against an enforcementnotice given
becauseof a belief mentioned in the Phunbing andDrainage Act 2018. section 143(2)(a)(i),(b) or(cj-5 business days after the day the notice is
given;or(ii) for an. appeal against a decision of a local
governmentor an inspector to givean actionnoticeunder the Plumbing and Drainage Act 2018-5businessdays after the noticeis given;or
Page 212 Currentas at 1 July 2019 Durrentasat 1 July 2019 Page 213
Amhorind by the P.urmmentaryCbunwl Authorisedby the FarruuacntuyCbunsel
PlanningAct2o16Chapter 6 DIspute resolution
[s230]
(iii) otherwise.---20 business days after the day thenotice is given;or
(g) for any other appeal-20 business days after a notice ofthe decision for the matter, including an enforcementnotice, is given to theperson.
Note-See the P&E Court Act for the comt's power to extend the appealperiod.
(4) Each respondent and co-respondent for an appeal may beheard in the appeal.
t5) If an appeal is only about a referral agency's response, the
assessment manager may apply to the tribunal or P&E Courtto withdrawfromtheappeal.
(6) To remove any doubt, it is declared that an appeal against aninfrastructure chargesnotice must not be about-(a) the adopted charge itself; or
(b) for a decision aboutan offsetor refund---
(i) the establishment cost of trunk infrastructureidentifled in a LGIP;or
(ii) the cost of infrastructure decided using the methodincluded in the local govemment's chargesresolution.
230 Noticeof appeal(1) An appellantstarts an appealby lodging,with the registrarof
the tribunal or P&E Court,a noticeof appeal that-(a) is in the approvedform; and
(b) succinctlystates the grounds of the appeal.
(2) The notice of appeal must be accompanied by the requiredfee.
(3) The appellant or, for an appeal to a tribunal, the registrar.must, within the serviceperiod. give a copy of the notice ofappeal to-·
Page214 Current as at 1 July 2o19
AuthnnsedbythePadiamenmryCommcl
PlanningAct 2016chapter6 Disputeresolution
[s 23o]
(a) the respondentfor the appeal; and
(b) each co-respondentfor the appeal; and
(c) for an appeal about a development application underschedule 1, section 1, table 1, item 1-each principalsubmitterfor the applicationwhose submission has notbeen withdrawn; and
(d) for an appeal about a change application underschedule1, section 1, table 1, item 2-each principalsubmitter for the application whosesubmission has notbeen withdrawn;and
(e) each personwho may elect to be a co-respondent for theappeal other than an eligible submitter for a
development·application or change application the
subjectof the appeal;and
(f) for an appeal to the P&E Court-the chief executive;and
(g) for an appealto a tribunal under anotherAct-anyotherperson who the registrar considersappropriate.
(4) Tbe serviceperiod is-(a) if a submitteror advice agencystarted the appeal in the
P&E Court·--2 businessdays after the appeal is started;or.
(b) otherwise-10 businessdays after the appeal is started.
(5) A notice of appeal given to a person who may elect to be aco-respondentmust state the effectof subsection(6).
(6) A person electsto be a co-respondent to an appealby filing a
noticeof election in the approved form-(a) if a copy of the notice of appeal is givento the person-
within 10 business days after the copy is given to the
person;or(b) otherwise-within 15 business days after the noticeof
appeal is lodgedwith the registrar of the tribunal or theP&ECourt.
Currentas at 1 July 2o19 Page215
Autbodscdby the ParliamentaryCoomel
PlanningAct2016 PlanrdngAct2016Chapter6 Dispute resolution Chapter6 Dispute resolutlon
[s2311 . pg(7) Despiteany otherAct or rules of comt to the contrary. a copy
of a not|Ce of appeal may be given to the chief executive byemailingthe copy to the chief executive at the email addressstatedon the department'swebsite for this purpose.
231 Non-appealable decisions and matters(1) Subjectto this chapter, schedule 1 and the P&E Court Act,
unless the Supreme Court decides a decisionor other matterunder this Act is affectedby jurisdictionalerror, the decision
or matter is non-appealable.
(2) TheJudicialReviewAct1991, part 5 applies to the decision ormatter to the extent it is affected byjurisdictionalerror.
(3) A person who, but for subsection (1) could have made an
applicationunder the JudicialReview Act 1991 in relation tothe decisionor matter,may apply underpart 4 of that Act for a
statementof reasons in relation to the decisionor matter.
(4) In this section-decision includes-(a) conduct engaged in for the purpose of making a
decision;and
(b) other conduct that relates to the making of a decision;and
(c) the making of a deoision or the failure to make adecision:and
(d) a purporteddecision: and
(e) a deemed refusal.
non-appealable, for a decision or matter, means the decisionor matter--(a) is final and conclusive;and
(b) may not be challenged, appealed against, reviewed,quashed, set aside or called into question in any otherway under the Judicial Review Act 1991 or otherwise.
Page 216 Current as at 1 July2019
AuthwisedbylhePsDamatory counsel
whether by the Supreme Court, another court, anytribunal or anotherentity; and
(c) is not subjectto any declaratory, injunctiveor otherorder of the Supreme Court, another court, any tribunalor anotherentity on any ground.
232 Rules of the P&E Co'urt(1) A person who is appealing to the P&E Court must comply
with the rules of the court that apply to the appeal.
(2) However,the P&E Courtmayhearand decide an appealevenif theperson has not complied with rules of the P&ECourt.
Part 2 Developmenttribunal
Division 1 General
233 · Appointment of referees(1) The Minister, or chiefexecutive,(theappointer) may appoint
a person to be a referee, by an appointment notice. If theappointerconsiders the person-ta) has the qualifications or experience prescribed by
regulation; and
(b) has demonstratedan ability-(i) to negotiate and mediate outcomes betweenparties
to a proceeding:and
(ii) to apply the principlesof naturaljustice;and
(iii) to analysecomplex technicalissues;and
(iv) to communicate effectively, including, forexample, to write informed succinct andwell-organised decisions. reports, submissions orother dócuments.
Currentas at 1 July2019 Page217
AnthomedbylhehrlimnamyCoomel
PlanningAct 2016
Schedule 1
Schedule1 Appeals
section 229
1 Appeal rIghts and partles to appeals(1) Table I states the matters that may be appealedto-·
(a) theP&E court; or(b) a tribunal.
(2) However, table 1 applies to a tribunal only if the matterinvolves-(a) the refusal, or deemed refusal of a development
application. for-(i) a materialchange of use for a classifiedbuilding;
or
(ii) opemtionalwork associatedwith building work. a
retainingwall, or a tennis court;or(b) a provisionof a developmentapproval for---
(i) a material changeof use for a classified building;
or
(ii) opemtionalwork associated with building work, a
retaining wall, or a tenniscourt; or
(c) if a development permit was applied for-the decision
to give a preliminaryapprovalfor-(i) a materialchange of use for a classified building;
or
(ii) operational work associated with building work, a
retainingwall, or a tennis court; or
d) a developmentconditionif-(i) the development approval is only for a material
change of use that involves the use of a buildingclassified under the Building Code as a class 2building;and
Page aDo Cunentas at 1 My 2o19
Authorisatby ihe Parnamentarycoumel
PlanningAct 2016
Schedute1
(ii) the building is. or is proposed to be, not more than3 storeys; and
(iii) the proposed developmentis for not more than 60
sole-occupancyunits;or(e) a decision for, or a deemed refusal of. an extension
application for a developmentapproval that is only for a
materialchangeofuse ofa classified building;or(f) a decision for, or a deemed refusal of, a change
applicationfor a developmentapproval that is only for a
materialchangeofuse ofa classifiedbuilding;or(g) a matter under thisAct, to the extentthematterrelates to
theBuilding Act. other than a matterunder that Act that
may or must be decidedby the QueenslandBuilding andConstructionCommission;or
(h) a decision to give an enforcement notice-(i) in relation to a matter under paragraphs (a) to (g):
or(ii) under the PhonbingandDrainage Act2013;or
(1) an infrastructurecharges notice;or
(j) the refusal, or deemed refusal. of a conversionappIfcation;or
(1) a matter prescribedby regulation.
(3) Also, table i does not apply to a tribunal if the matterinvolves-(a) for a matter in subsection (2)(a)to (d)-·
(i) a developmentapproval forwhich thedevelopment
application required impactassessment;and
·(ii) a developmentapproval in relation to which theassessment manager received a properly madesubmission for the development application; or
(b) a provision of a development approval about theidentification or inclusion,undera variation approval, ofa matter for the development.
Cunent as at 1 My2019 Page301
Aurledsedby ihe PmliamentmyCounsel
PlanningAct 2016 Planning Act 2016
Schedule 1 Schedule 1
(4) Table 2 states the matters that may be appealed only to theP&E Court.
(5) Table 3 states the matters that may be appealed only to thetribunal.
(6) In each table--.-
(a) column I states the appellant in the appeal;and
(b) column 2 states the respondent in theappeal;and
(c) column 3 states the co-respondent (ifany) in the appeal;and
(d) column 4 states the co-respondentsby election (if any)in the appeal.
(7) If the chief executive receives a notice of appeal undersection230(3)(f), the chief executive may elect to be aco-respondent in the appeal.
(8) In this section-storeysee the BuildingCode, part A1.1.
Table1Appeals to the P&ECourtand, for certainmatters, to a tribunal
1. DevelopmentapplicationsFora developmentapplication other ihanan excludedapplication.an appeal may be
madeagainst----
to) the refusalofall or part of the developmentapplicarlon;or(b) the deemed refU5alof the developmentapplication;or(c) aprovisionofthedevelopmentapprovahorfdj ifadevelopmempermitwasappliedfor-thedecisiontogiveapreliminary
approval.
Table 1Appeals to the P&E court and, for certain matters, to a tribunal
Column1 Colunm2 Column3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election (ifanyj
The applicant 'Ilie assessment If the appeal is about 1 A concurrencemanager a concurrence agencythat is
agency'srefermi not aresponse-the , co-respondentconcurrenceagency 2 Ifachosen
assessmentmanageris therespondent-theprescribedassessmentmanager
3 Anyeligibleadvicengencyfortheapplication
4 Anyeligiblesubmitterforcheapplication
2. ChangeapplicationsFor a changeapplicationother than an excluded application,an appeal maybe madeagainst-(a) the responsibleentity'sdecision on ihe change application:ortb) a deemed refusal of the changeapplication.
Page302 Currentas at 1 July2019 Currentas at 1 July 2019 Page303
Audari,cdby thePadiamruimyCounici Anthorisedby thePadinmenturycounset
PlanningAct 2016 PlanningAct2016
Schedule 1 Schedule1
Table1 Table 1Appeals to the P&E Court and, for certain matters,to a tribunal Appealsto theP&E Court and, for certainmatters,to a tribunal
Columni Column2 Column3 Column4 Column] Column2 Column3 Column4Appellant Respondent Co-respondent Co-respondent Appellant Respondent Co-respondent Co-respondent
(ifany) by election(if (if any) by election fifany) any)
1 Theapplicant He responslble If an affectedentity I A concurmnce 1 The applleant He assessment If a concurrence Ifa chosen2 If the entity starts the appeal- ogencyfor the 2 For a matter manager agencystarts the assessmentmanager
sesponsible the applicant developmentother than a appeal-the ss the respondent-
entity is the application deemed refusal applIcant the prescribed
assessment 2 If a chosen ofan extension assessment manager
manager-an assessment application-aaffectedentity manageristhe concurrencethatgave a respondent-the agency,otherpre-request prescrlbed thanthochiefnoticeor assessment executive, forresponse notice manager the application
3 Aprivate 4. Infrastuteturechargesnoticescertifier for thedevelopment An appeal maybe made agalnst an infrastrucmrechurgesnotfee on I ormoreof the
application followinggmunds-4 Anyeligible (a) thenoticeinvolvedamerrorrelatingto-
addceagency (i) the application of the relevantadoptedcharge;orExamplesoferrors inapplyingan adoptedchargc-
5 Any eligible ? the incorrectappIlcationofgross floorarea fora non-residentialdevelopmenL
submitter for the ? applying an incorrect 'usecategory',undera regulation, to thedevelopmentch ge
tion (ii) the workingourofextmdemand.for section 120:or
(iii) an offsetor refund:or3. Extensionapplications (b) therewas no decisionabout an offset orrefund; orForanextensionapplicationother than an extensionapplicationcalledin by the Minister. (c) if the infrastecturechargesnoticestates a refundwill be given-the timing foron appeal may be made against- giving the refund; or(a) the assessmentmanager'sdecision on the extensionapplication; or (d) foran appeal to the P&ECourt-theamount of tlte chargeIs so umeasonable thatno(b) a deerned icfusal of the extension application. reasonable relevnnt local governmemcouldh&Ve imposed the Smount.
Page 304 Currentas at 1 July 2019 Currentasat 1 July2019 Page 305
Authorised by the ParliamentasyCoonscI Authorised byuæ Patiamenury Counsel
PlanningAct 2016 PlanningAct 2016
Schedule 1 Schedute 1
Table1Appeals to the P&E Court and, for certain matters, to a tribunal
Colunm I Column 2 Column3 Column4
Appellani Respondent Co-respondent Co-respondent
(ifany) by election (ifanyl
Thepersongiven the He local
- ---Infrastructute governmentthatgavechargesnotice the infmstructure
chargesnotice
5. Conversion applicationsAn uppeal maybe modeagainst-(ai therefusalofaconversionapplication;or(b) a deemed refusalof a conversionapplication.
ColumnI Column 2 Column3 Column 4
Appellant Respondent Co-tespondent Co-respondent
(if any) by election (ifany)
He applicant De local
- -.-.governmentto whichtheconversionapplication wasmade
6. Enforcement noticesAn appeal may be madeagainstthedecision to givean enforcementnotice.
Columul Column2 Column3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election(ifany)
De person giventhe De enforcementenforcementnotice authority -
Iftheenforcementauthorityis not thelocalgovemment forthepremisesinrelation to which theoffence is alleged tohavehoppened-thelocalgovemment
Table 2Appealsto the P&E Court only
1. Appentsfrom tribunal
Anappeal may be made agalust a decision of a tribunal, other than a decisionutidersection252,on the groundof-fa} an erroror mistake in law on the partof the tribunal;or(b) jurisdictionalerror-
Column 1 Column 2 Column 3 Column4
Appellant Respondent ? Co-respondent Co-respondent
(if any) by election(ifany)
Apartytothe Theoiberpartytothe.---
-proceedings for the pmceedingsfor thedecision decision
2. Eligiblesubmitterappeals
For a development applicationor changeapplicationother than an excluded application.an appeal may be made againstthe decision to approve the application.to the extentthedecisionrelatesto.---
tal any part of the development applicationorchange applicalion that required impactassessment;or
tb) a variation request.
Column 1 Column 2 Column3 Column 4Appellant Respondent Co-respondent Co-respondent
(if any) by election (ifany)
1 Fora 1 Fora 1 De applicant Anothereligibledevelopment development 2 Iftheappealis submitterfortheapplication-an application-the about a applicationeligible assessment concurtacesubmitterforthe manager ,g,3ey-szeferraldevelopment 2 Forachange tesponse-theapplication applicarlon-the concurrence
2 Forachange responsible agencyapplication-an entityeligiblesubmitterfor thechangeapplication
Pago 306 Curram as at 1 July2019 Currentas at 1 July2019 Page 307
AnthartmibythePastimmcoraryCbunse] AudunùrdbyLkPartmmeniaryCounsel
PlannungAct2016 Planning Act2016
Schedute t Schedule 1
Table2Appears to the P&E Courtonly
3. ]!11giblesubmitter and eligibleadvice agencyappeals
For a developmemapplicationorchangeapplication otherthan an excluded appI!cation,an appealmay be made against a provlsionof thedevelopmentapproval,or a failuretoinclude a provision in the developmentapproval, to the extentthe matterrelatesto--(a) any partofthedevelopmentapplicationorchangenpplicationthatrequindimpact
assessmenttor(b) a vatiation request.
Column 1 Column 2 Column3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election lifany)
1 Fora 1 For a 1 Ne applicant Another eligibledevelopment development 2 If the appeal is submitterfor the
application-on application---th* about a °PPIEC°'I°°eligible assessment concurrencesubminerforthe manager ,g,ney.,,,g,,,,3development 2 Forachunge response-theapplieniton application-the concurrence
2 Fora change responsible agency
application-an entityeligiblesubmitterforthechanceapplication
3 Aneligibleadvice agencyfortItedevelopmentapplication orchangeapplication
4. CompensationclaimsAn appeal may be madeagainst-(a) adecisionundersection32aboutacompensationclaimt or(b) adecisionundersection265aboutaclaimforcompensation;or(c) a deemed refusal of a claim under paragraph(aj or (b).
Table2Appealsto the P&E Court only
Column 1 Column2 Column 3 Column4Appellant Respondent Co-respondent Co-respondent
(ifany) by election (ifany)
A persondissatisfied Ne local
- -with the decision government to whichthe claimwasmade
5. Registeredpremises
An appealmay be made againsta decisionof the Ministerunder chapter 7, part 4.
Columni Column2 Column3 Column4Appellant Respondent Co-respondent Co-respondent
(ifany) by election(ifany)
i A persongiven a Ne Minister
- If an owner ordecisionnotice occupier starts theabout the appeal-theownerofdecision theregistered
2 Ifthedecisionis .prenuses
moregisterpremisesorrenew theregistrationofprenuses-anowneroroccupierofpremisesintheaffectedarea fortheregisteredpiumiseswho isdissatisfiedwiththedecision
6.I.ocallaws
An appeal may be madeagainsta decislanofa local govemment,or conditions applied,undera local law about--(a) the use ofpremises. Other than a use that is the natural and onlinatyconsequence of
prohibited developmenttor(b) theerectionofabuildingorotherstructure.
Pago308 Current as at 1 July2019 Currentas at 1 July 2019 Page309
Authorivd by the Pmlimnentary Cetmn! Amborisedby thePmEnnentaryCounsel
Planrnng Act 2016 Planning Act 2016
Schedule 1 Schedule 1
Table2 Table3Appealsto the P&E Courtonly Appealsto a tribunalonly
Column 1 Column 2 Column3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) byelection(if
any)
Apersonwho-- Nelocal
- -(a) appiledfor the 8°'*MM*Mdecision; and
ib) isdissatisfiedwiththedecisionor conditions.
Table3Appeals to a tribimalonly
i. Buildingadvisoryagency appeals
An appeal may be made against givinga developmentapprovalfor building work to theextent the buildlngwork required codeassessmentagainst the bulidingassessmentprovisions.
Column 1 Column2 Column3 Column 4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election fifanys
A building advisory %eassessment Theapplicant 1 A concurrenceagency for the manager agencyfor thedevelopment developmentapplicationrelated to applicationthe approval related to the
approval2 A private
certifier for thedevelopmentapplicationrelatedtotheapproval
2. InspectionofbuildingworkAn appeal may be madeagaimt a decisionofa buildingcertifieror referralagency aboutthe inspectionof building workthat is the subjectof a buildingdevelopmentapprovalunder the BuildingAct.
Column1 Column 2 Column 3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election(ifanyj
The applicant for the 'Ibcpersonwho - ·---development made the decisionapproval
3. Certaindecisionsunder the Building Act and the Plumbing rmdDrainage Act2018
An appealmaybe made against-(a) a decisionunder the Building Act, otherthan a decisionmade by the Queensland
Buildingand ConstruciionCommission,ifan information noticeabout the decisionwasgiven or required to be given under that Act;or
(b) a decision under the PlumbingandDrainageAct2018,otherthan a decisionmadeby ihe QueenslandBuildingand ConstructionCommission.ifan informailonnotIceabout the decision was given or required to be givenunder thatAct.
Column 1 Column2 Column3 Column4
Appellant Respondent Co-respondent Co-respondent
(ifany) by election(ifany)
A person who Theentity that made
- -received,or was lhe decision
entitledtoreceive,nninformationnoticeabout the declsion
4. l.ocal government failureto decideapplication underthe Building Act
Anappeal may be rundeagainst a localgovernment'sfailure to decide an applicationunder the BuildingActwithin the periodrequiredunderthat Act.
Page 310 Current as at 1 July 2019 Current as at 1 July 2019.
Page311
AmhorisedbytheParilarcentaryConse! AuthoñsedbythePallatneatryCnunsel
PlanningAct 2016
Soliedule1
Table3Appantsto a tribunal only
Column I Column2 Column 3 Column4
Appellant Respondent Co-respondent Co-re?pondent
(ifany) by election(ifany)
A personwho was 111elocal
- -entitled to receive governmentto whichnotice of the decision the applicationwas
made
5. Failureto makea decisionaboutan applicationor other matterunder ihe Phrmbing andDrahwgeAct2018
An oppealmay be made againsta failureto make a decision under the PlumbingandDrainageAct 20lS, other than a failureby the QueenslandBuilding and ConstractionCommission to make a decision, within the period required underthat Act, if aninformarlon notice about the decisionwas required to be givenunder that Act.
ColumnI Column2 Column 3 Column4
Appellant Respondent Co-respondent Co-tespondent
(if any) by electionlifany)
A personwhowas The entity that failed
- -emilled to receive an to make the decisioninformation noticeaboutthe decision
Page 312 Current as at 1 July 2019
Authnrised by dreParGamentaryCaumel