Do Baray-Ibne Safi & Abulkhair Kashfi-Mushtaq a Qureshi-Karachi-2009
Solid Rock Mission Hospital Road 71, Tros Village, Balang Commune, Baray District, Kampong Thom...
-
Upload
chester-simmons -
Category
Documents
-
view
218 -
download
2
Transcript of Solid Rock Mission Hospital Road 71, Tros Village, Balang Commune, Baray District, Kampong Thom...
Solid Rock Solid Rock Mission Mission
HospitalHospitalRoad 71, Tros Village, Balang Commune,Baray District, Kampong Thom Province,Kingdom of Cambodia
Solid Rock Mission Hospital is a project of AEF Solid Rock Mission Hospital is a project of AEF International, our local branch -- Kampuchea Evangelistic International, our local branch -- Kampuchea Evangelistic
Fellowship (KEF) and our NGO: BILEGFellowship (KEF) and our NGO: BILEG
Began construction in March 2013
Construction finished in December 2014.Photo dated May 2015.
Close-up of the front entrance.
Front view of the entrance.
Eastern wing of the hospital; emergency room.
Western wing of the hospital.
Though the building is not yet fully-equipped to operate as a hospital, it is already being used as a primary healthcare clinic at our Solid Rock Missions compound.
We provide them with healthcare consultations, diagnoses, and treatment with our generous supply of medicines from mission supporters and international medical ministries.
Aside from financial and material needs for the full operation of the hospital, we are also praying for the Lord to send medical-missionary personnel. As of May 2015, there are only three licensed medical professionals (Dr. Castro, Sis. Joy, and Sis. Gayle) at the compound.
By catering to their medical needs, we hope to show the love and compassion of Jesus Christ to the Khmer people.
Praise/Prayer items0The Lord has provided $320,000 for phase 1…praise
Him!0For the work still to be completed…railings for the
stairs, fans and furniture…approx. $ 3,0000For the Lord to provide the needed hospital staff—both
Khmer and overseas0For the provision of hospital equipment and monitoring
systems0For the commencement of phase 2 in January 2017…
more beds, a new wing and a paediatric ward. Approximate cost: $ 150,000.
0For many to come to know Jesus as Lord and saviour