SOLAR PARK – ROMANIA
Photovoltaic Project
Stage : Ready to Build6,174 MWp
November 2013
EXPERT GROUP CONSULTING
![Page 2: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/2.jpg)
Ready to build project Term Sheet signed and Contract negotiation
on-going with EPC co. for plant construction Contract signed for underground medium
voltage line Contract for Grid Connection signed in 2013 Surveillance (“Dispecerizare”) required by
Transelectrica: calendar and very low cost secure
![Page 3: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/3.jpg)
The project is located in the south part of Romania, in an area with a high solar irradiation potential, 70 km North from Bucharest, near Targoviste City (2 km from the City), in an industrial area, near a large modernized Transelectrica station (aprox. 1,5 Km);
Excellent road infrastructure for construction and general access to the Park.
The area is not crowded and suitable for solar PV developments not having influence by wind parks, with a very good stability of the grid;
The land was removed from the agricultural circuit, and is now located in intra muros area - according to the new requirements of the legislation.
The total surface of the land is 12 ha and is owned by the company.
![Page 4: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/4.jpg)
![Page 5: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/5.jpg)
![Page 6: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/6.jpg)
ATR obtained from Transelectrica on April 25th 2013 Building Authorizations:
◦ For Park construction obtained on May 31st 2013 ◦ For Transelectrica Station and Underground Medium voltage Line obtained on June
6th 2013
ANRE: ◦ Set-up Authorization: Approved by ANRE on May 31st 2013
Legal Due Diligence Report issued by a very reputable law firm: available.
Transelectrica – Grid Connection Contract– signed
![Page 7: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/7.jpg)
The connection to the Grid made directly to Station 20kV Electrica Targoviste owned by Transelectrica.
To execute the Grid Connection was necessary: ◦ To install one cell (20kV) in Station Electrica Targoviste ◦ To construct the underground medium voltage cables approx. 1,5 km in
length * ◦ To construct underground optic fiber for Transelectrica surveillance
(dispecerizare) *
![Page 8: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/8.jpg)
Installed capacity: 6,174 MWp Total energy production: 8,390 MWh/a Energy Yield: 1360 kWh/kWp Capacity factor: 15,5% Technical Project and Detailed Design in
compliance with Romanian legislation : finalized.
![Page 9: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/9.jpg)
Negotiations for taking over all the company shares for a very attractive price : 120,000 €/Mwp;
Legal asistance during negociation process and up to the completed transaction status;
Legal due diligence report on Solar Park Project;
Briefing on the legal framework governing the development of photovoltaic projects in ROMANIA, including authorization process;
Legal assistance regarding EU legislation on green energy production and its benefits;
![Page 10: SOLAR PARK – ROMANIA Photovoltaic Project Stage : Ready to Build 6,174 MWp November 2013 EXPERT GROUP CONSULTING.](https://reader035.fdocuments.us/reader035/viewer/2022062315/56649eb45503460f94bbc963/html5/thumbnails/10.jpg)
Liliana TodirasProject Manager
P: +4 0722 378 457F : +4 0233 220 402
84 Traian Blvd. Neamt CountyPiatra Neamt 610142 [email protected]@tanasasiasociatii.ro