INTERNATIONAL SOLAR ENERGY SOCIETY TURKEY SECTION
REPRESENTING TURKEY IN
WE ARE THE MEMBER OF :
DOĞAL GAZ + LNG 21190,69 MW
% 31,06
DİĞER 5964,4 MW
% 8,95KÖMÜR & LİNYİT14034,28 MW
% 20,57
KÜÇÜK HİDROLİK6868,29 MW
% 10,07
BARAJLI HİDROLİK 16586,64 MW
% 24,31
JEOTERMAL358,42 MW
% 0,53
RÜZGAR3483,94
MW% 5,11
GÜNEŞ35 MW% 0,05
TOTAL INSTALLED POWER CAPACITY IN TURKEY (68 GW )
WIND3483,94
MW % 31,6
SOLAR35 MW 0,3%
GEOTHERMAL358,42 MW
% 3,25
MICRO HYDRAULIC6868,29 MW
% 62
RENEWABLE + WASTE
267,67 MW 2,4%
TOTAL INSTALLED RENEWABLE POWER CAPACITY
(11 GW )
PROJECTION
TOTAL CAPACITY: 125 GW TOTAL PRODUCTION: 424 TWh
RENEWABLE ENERGY PRODUCTION PROJECTION
12
• 160,000 GWh/a. ECO. HYDRO • 48,000 MW WIND• 1,500 kWh/m²-year AGSR• 31,500 MWt GEOTHERMAL• 8.6 MTEP BIOMASS• 1.5-2 MTEP BIOGAS
RENEWABLE POTENTIAL OF TURKEY
13
Schedule I (Provision of the law dated 29/12/2010 and numbered 6094)
Type of Production Facility Based onRenewable Energy Resources
Prices Applicable(US Dollar cent/kWh)
a. Hydroelectric production facility 7.3
b. Wind power based production facility 7.3c. Geothermal power based production facility
10.5
d. Biomass based production facility(including landfill gas) 13.3
e. Solar power based production facility 13.3
FEED IN TARIFFS
According to Law on Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy
14
The whole economically feasible hydropower potential of Turkey will be provided for generating
electrical energy,
20,000 MW capacity of wind power plant will be in operation
Minimum 3000 MW of solar energy capacity will be reached
Minimum 600 MWe geothermal will be implemented
TARG
ETS
FOR
2023
1500 MWe installed capacityfor Biomass energy
SOLAR ENERGY IN TURKEY
SOLAR WATER HEATING SYSTEMS
18
SOLAR THERMAL MARKET• PRODUCER : MORE THAN 90 COMPANIES RETAILERS: 800 - INSTALLERS : 3000 • TOTAL POWER : 18.000.000 M2
• PER 1000 INHABITANTS 5TH PLACE IN THE WORLD• THIRD BIGGEST PRODUCER IN THE WORLD• 2013 PRODUCTION : 1.600.000 M2
• FOR 2013 MARKET SHARE: %70 FLAT PLATE - %30 EVACUATED TUBE
SOLAR THERMAL PRODUCERS
PV MARKET
• PV PANEL PRODUCER : 14 COMPANIES (LAMINATION) • TOTAL EPC COMPANIES : MORE THAN 100• TOTAL POWER PLANT : 35 MW UNLICENSED• UNLICENSE LIMIT : 1 MW• LICENSE LIMIT : 50 MW• LICENSE APPLICATION : 496 FILES – 7873 MW • TOTAL PERMITTED CAPACITY 600 MW • LICENSE TIME : BY END OF 2014
TOP 5 PV MARKET
PHOTOVOLTAIC PRODUCERS
SOLAR INVESTMENTS
• LICENCED• UNLICENCED
LICENSED INVESTMENT PROCESS
SOLAR MEASUREMENT INSIDE THE PROJECT SITE
PRE-LICENSE APPLICATION TO EMRA
TECHNICAL EVALUATION BY THE MENR
COMPETITION TENDER
GRANTED PRE-LICENSE
GRANTED LICENSE
PERMISSIONS FROM RELATED AUTHORITIES
INSTALLATION & PROJECT ACCEPTANCE FROM THE MENR
OPERATION
REGION NO REGIONANNOUNCED
REGIONAL CAPACITY(MW)
NUMBER OF APPLICATION
TOTAL CAPACITY(MW)
1 4. ANTALYA 29 12 155,262 5. ANTALYA 29 10 147,43 ADANA-OSMANİYE 9 5 454 BİTLİS 16 6 65,25 BURDUR 26 24 402,446 DENİZLİ 18 20 228,247 ELAZIĞ 8 5 36,28 ERZURUM 5 2 9,99 HAKKARİ 21 1 21
10 ISPARTA - AFYON 18 30 420,0411 KAHRAMANMARAŞ – ADIYAMAN 27 28 442,912 KARAMAN 38 62 1128,1213 KAYSERİ 25 31 521,9714 KONYA - 1 46 36 657,9415 KONYA - 2 46 67 1266,0316 MALATYA - ADIYAMAN 22 30 427,1517 MERSİN 35 14 197,518 MUĞLA - AYDIN 20 18 264,7519 MUŞ 9 1 920 NİĞDE – NEVŞEHİR -AKSARAY 26 51 794,121 SİİRT – BATMAN - MARDİN 9 4 3222 SİVAS 9 6 5423 ŞANLIURFA - DİYARBAKIR 7 10 5824 ŞIRNAK 11 1 725 VAN - AĞRI 77 22 538,6726 BİNGÖL - TUNCELİ 11 0 027 ERZİNCAN 3 0 0
TOTAL 600 496 7929,79
LOCATIONS APPLIED FOR LICENSE
The Central Anatolian region and Konya are the leading applied provinces.
INVITATION LETTER
PERMISSIONS FROM RELATED AUTHORITIES
CONNECTION APPLICATION TO DISTRUBITION COMPANY
TECHNICAL EVALUATION BY THE MENR
PROJECT ACCEPTANCE FROM THE MENR
UN LICENSEDINVESTMENT PROCESS
OPERATION
THE PREDICTIONS FOR PV MARKET
• 2023 TARGET : OFFICALLY 3 GW EXPECTATION : 10 – 12 GW• UNLICENSE LIMIT : 1 MW• NEW LICENSE APP. DATE : APRIL 2015• MEASUREMENT : MIN 6 MONTHS• TOTAL PERMITTED CAPACITY : 1,2 GW IN 2015
Renewable power plants that have come into operation since 18 May 2005 or will come into operation
before 31 December 2020 will be eligible to receive the feed-in tariffs for the first 10 years of their operation.
In addition, if the mechanical or electro-mechanical equipment of the power plant is produced locally,
a premium shall be added to the feed-in tariffs during the first five years of operation.
RENEWABLE ENERGY SUPPORT MECHANISM
FEED-IN TARRIF AND LOCAL EQUIPMENT BONUS
SOCIAL PROJECTS
• ORKOY • ILBANK• IPRAD 1 AND IPRAD 2 PROJECTS• TURSEFF • RE COOPERATIVE
SHC CONFERENCE 2015 İstanbul
Let’s meet where the continents meet...