Solar-Assisted EV Charging Update
-
Upload
tnenergy -
Category
Technology
-
view
100 -
download
4
description
Transcript of Solar-Assisted EV Charging Update
Solar-Assisted EV Charging Update
TDEC Conference Kingsport, Tennessee March 13, 2013
ORNL is DOE’s largest science and energy laboratory
$1.65B budget
World’s most intense
neutron source
4,400 employees
World-class research reactor
3,000 research guests
annually
$500M modernization
investment
Nation’s largest
materials research portfolio
Most powerful open
scientific computing
facility
Nation’s most diverse
energy portfolio
Managing billion-dollar U.S. ITER
project
2 Green Economy 1302
3 Managed by UT-Battelle for the U.S. Department of Energy
3 Managed by UT-Battelle for the U.S. Department of Energy
Solar-Assisted EV Charging Project
• In August 2009, ORNL was awarded $6.8 million for the installation of solar-assisted EV charging stations in Tennessee. This was part of a larger DOE grant to Ecotality for the deployment of EV charging stations in five states
• The grant to ORNL required a 50/50 cost share match from regional partners. The majority of the cost share has been, or will be met, by the State of Tennessee, TVA, EPRI, and Nissan.
• The final part of the cost share match is the State of Tennessee project.
• We have also enjoyed great partnerships and in-kind support from the cities, distributors, and universities with whom we have worked.
4 Managed by UT-Battelle for the U.S. Department of Energy
4 Managed by UT-Battelle for the U.S. Department of Energy
Levels of EV Charging
Voltage AC/DC
Time for Full Leaf Charge (24 kwh)
Range
Level 1 110 AC ~20 hours 4-5 miles per hour of charging
Level 2 220 AC ~7 hours 12 miles per hour of charging
Fast Charger
480 DC 30 minutes (for 80% charge)
80 miles per half-hour of charging
5 Managed by UT-Battelle for the U.S. Department of Energy
5 Managed by UT-Battelle for the U.S. Department of Energy
Levels of EV Charging
Level 2 DC Fast Charger
6 Managed by UT-Battelle for the U.S. Department of Energy
6 Managed by UT-Battelle for the U.S. Department of Energy
Regional Solar-Covered Parking Project Components
2.0 kw of solar per parking space
Electric vehicle
Charging system (EVSE) Level 2
External battery
Grid connection
7 Managed by UT-Battelle for the U.S. Department of Energy
7 Managed by UT-Battelle for the U.S. Department of Energy
Locations of Solar-Assisted Charging in Tennessee
10 stations in Memphis
22 stations
10 stations
30 stations at Nissan
25 stations at ORNL 22 Stations
Knoxville and UTK
6 stations at EPRI
Original map overlays by Ecotality
8 Managed by UT-Battelle for the U.S. Department of Energy
8 Managed by UT-Battelle for the U.S. Department of Energy
ORNL: 25 Solar charging stations
9 Managed by UT-Battelle for the U.S. Department of Energy
9 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installations ORNL/EPRI
Level 2 charges
12 kW solar PV
array
30 kWh battery bank
EPRI Installation 6-solar assisted stations 2 Clipper Creek level 2 chargers 2 EVSE LLC level 2 chargers 2 Eaton level 2 chargers
ORNL Installation 25-solar assisted stations http://ExtWebApps.ornl.gov/PVEV_ext
Blink level 2
chargers
47 kW solar PV
array
60 kWh battery bank
10 Managed by UT-Battelle for the U.S. Department of Energy
10 Managed by UT-Battelle for the U.S. Department of Energy
Nissan HQ Solar-Assisted EV Charging Station, Franklin, TN
11 Managed by UT-Battelle for the U.S. Department of Energy
11 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installations NISSAN
Blink level 2
chargers
19kW solar PV
array
24 kWh battery bank
Franklin 18-solar assisted stations Smyrna, Administration Building 9-solar assisted stations
AeroViro-nment level 2
chargers
38 kW solar PV
array
24 kWh battery bank
12 Managed by UT-Battelle for the U.S. Department of Energy
12 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installation Nissan: 3 solar assisted stations
Blink level 2
chargers
6.5 kW solar PV
array
24 kWh battery bank
Battery Plant, Smyrna
13 Managed by UT-Battelle for the U.S. Department of Energy
13 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installation Nashville: 8 solar assisted stations
Blink level 2
chargers
17.2 kW solar PV
array
13 kWh battery bank
LP Field – Sports Authority
14 Managed by UT-Battelle for the U.S. Department of Energy
14 Managed by UT-Battelle for the U.S. Department of Energy
UT Agriculture Campus
Completed Installation UT-Knoxville: 6 solar assisted stations
Blink level 2
chargers
14.4 kW solar PV
array
10 kWh battery bank
15 Managed by UT-Battelle for the U.S. Department of Energy
15 Managed by UT-Battelle for the U.S. Department of Energy
University of Tennessee, Knoxville: 12 solar-assisted charging stations
Blink level 2
chargers
14.4 kW solar PV arrays
10 kWh battery banks
16 Managed by UT-Battelle for the U.S. Department of Energy
16 Managed by UT-Battelle for the U.S. Department of Energy
Civic Coliseum, Knoxville: 6 solar-assisted charging stations
Blink level 2
chargers
14.4 kW solar PV
array
6.7 kWh
battery bank
Solar panels Ribbon cutting, September 2012
17 Managed by UT-Battelle for the U.S. Department of Energy
17 Managed by UT-Battelle for the U.S. Department of Energy
Blink level 2
chargers
10 kW solar PV
array
8.4 kWh
battery bank
Solar panels location
Market Square Garage, Knoxville: 4 solar-assisted charging stations
Charging station
18 Managed by UT-Battelle for the U.S. Department of Energy
18 Managed by UT-Battelle for the U.S. Department of Energy
State Of Tennessee Site Nashville: 4 solar-assisted charging stations
Blink level 2
chargers
8.6 kW solar PV
array
6.7 kWh
battery bank
4th and Harrison
19 Managed by UT-Battelle for the U.S. Department of Energy
19 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installation Vanderbilt University: 10 solar-assisted
charging stations
Eaton level 2
chargers
20 kW solar PV
array
3 kWh battery bank
20 Managed by UT-Battelle for the U.S. Department of Energy
20 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installation Chattanooga: 6 solar-assisted charging stations
Eaton level 2
chargers
12 kW solar PV
array
3.0 kWh
battery bank
Theater Group
21 Managed by UT-Battelle for the U.S. Department of Energy
21 Managed by UT-Battelle for the U.S. Department of Energy
Completed Installation Memphis: 10 solar assisted stations
Eaton level 2
chargers
20 kW solar PV
array
3.0 kWh
battery bank
Shelby Farms
22 Managed by UT-Battelle for the U.S. Department of Energy
22 Managed by UT-Battelle for the U.S. Department of Energy
ORNL, Q3, Leaf
0
50
100
150
200
250
0 10 20 30 40 50 60 70 80 90 100
Freq
uenc
y
Percentage of EV Battery Filled per Charge (%)
Percentage of Nissan Leaf Battery Filled per Charge
DATA ANALYSIS AT ORNL
Drivers at ORNL tend to arrive with their Leaf batteries 40% depleted
23 Managed by UT-Battelle for the U.S. Department of Energy
23 Managed by UT-Battelle for the U.S. Department of Energy
Locations of DC Fast Chargers in Tennessee
Existing
Original map overlays by Ecotality
24 Managed by UT-Battelle for the U.S. Department of Energy
24 Managed by UT-Battelle for the U.S. Department of Energy
Locations of DC Fast Chargers in Tennessee
Existing
Future Original map overlays by Ecotality
25 Managed by UT-Battelle for the U.S. Department of Energy
25 Managed by UT-Battelle for the U.S. Department of Energy
Project Priorities
• Add DC Fast Charging along the I-40 corridor (to NC state line)
• Add DC Fast Charging in metropolitan areas
• Add Level 2 Charging in metropolitan areas