Soil property recovery on a natural gas pipeline reclamation chronosequence

35
Soil property recovery on a natural gas pipeline reclamation chronosequence Caley Gasch, Snehalata Huzurbazar, Peter Stahl

description

Soil property recovery on a natural gas pipeline reclamation chronosequence. Caley Gasch, Snehalata Huzurbazar , Peter Stahl. Our goal: assist in the recovery of degraded ecosystems Our basis for assessment: reference sites. - PowerPoint PPT Presentation

Transcript of Soil property recovery on a natural gas pipeline reclamation chronosequence

Page 1: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Soil property recovery on a natural gas pipeline reclamation chronosequence

Caley Gasch, Snehalata Huzurbazar, Peter Stahl

Page 2: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Our goal: assist in the recovery of degraded ecosystems

Our basis for assessment: reference sites

Page 3: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Like an average parameter, the degree of variability of properties is of interest

Changes in variance indicate ecological consequences of disturbance, stability, and recovery

The variance may help in defining an acceptable range of values for indicating recovery

Investigate the recovery of soil properties on reclaimed soils by incorporating both the mean and variance in our

assessment of similarity with regard to reference soils

Page 4: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Like an average parameter, the degree of variability of properties is of interest

Changes in variance indicate ecological consequences of disturbance, stability, and recovery

The variance may help in defining an acceptable range of values for indicating recovery

Investigate the recovery of soil properties on reclaimed soils by incorporating both the mean and variance in our

assessment of similarity with regard to reference soils

Page 5: Soil property recovery on a natural gas pipeline reclamation  chronosequence

--

Wamsutter, Wyoming Elevation: 2052 m (6731 ft) Precipitation: 180 mm (7 in) Dominant vegetation:

Big sagebrush (Artemisia tridentata)Greasewood (Sarcobatus vermiculatus)

Page 6: Soil property recovery on a natural gas pipeline reclamation  chronosequence

--

< 1 year 4 years 28 years 35 years 54 years Undisturbed

Page 7: Soil property recovery on a natural gas pipeline reclamation  chronosequence

i = 1 in 12 observations

Pijk

j = 1 in 7 treatmentsk = 1 in 2 years

Bayesian Hierarchical Linear Mixed Model

Soil Property (P)Moisture

SOCTN

Microbial abundanceEtc.

Page 8: Soil property recovery on a natural gas pipeline reclamation  chronosequence

i = 1 in 12 observations

Pijk

j = 1 in 7 treatmentsk = 1 in 2 years

μjk τjk

Bayesian Hierarchical Linear Mixed Model

Data Model for the Likelihood

Page 9: Soil property recovery on a natural gas pipeline reclamation  chronosequence

i = 1 in 12 observations

Pijk

j = 1 in 7 treatmentsk = 1 in 2 years

μjk τjkβj

Bayesian Hierarchical Linear Mixed Model

Data Model for the Likelihood

Mean value of P within a treatment

Variability between treatments within years

αj(k)

Page 10: Soil property recovery on a natural gas pipeline reclamation  chronosequence

i = 1 in 12 observations

Pijk

j = 1 in 7 treatmentsk = 1 in 2 years

μjk τjk

αj(k)

βj

τατβ

Bayesian Hierarchical Linear Mixed Model

Prior Model

μβ

Page 11: Soil property recovery on a natural gas pipeline reclamation  chronosequence

i = 1 in 12 observations

Pijk

j = 1 in 7 treatmentsk = 1 in 2 years

μjk τjkβj

Bayesian Hierarchical Linear Mixed Model

Posterior Distribution

τβμβ

αj(k)

τα

Page 12: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Bayesian Hierarchical Linear Mixed Model

Predictive Distribution of Future Observables

Huzurbazar et al. In Press SSSAJ

Page 13: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 14: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 15: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 16: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 17: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 18: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 19: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 20: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 21: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 22: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Mean(central tendency)

Variance(spread)

Moisture

Total N =

Organic C =

Microbial abundance

Page 23: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Future work: investigate sources of variability

Spatial approach (10 cm – 100 m)

Geostatistical parameter comparison

Assess degrees of heterogeneity

Link aboveground-belowground properties

Page 24: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 25: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 26: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Thank you: Wyoming Reclamation and Restoration Center, Haub School and Environment and Natural Resources, Overland Pass Pipeline Company, ONEOK, Kinder

Morgan, El Paso Companies, Bureau of Land Management Rawlins Field Office, Rachana Giri Paudel, Darren Gemoets, Leann Naughton, Kurt Smith

Page 27: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Soil properties vary in their response to disturbance and reclamation

Disturbed soils can differ from reference soils because of a property’s central tendency, or its spread of values

Longer recovery time increases the probability that a reclaimed soil property will be similar to a reference soil

Variability of a soil property tends to increase with recovery time and is generally high in reference soils

Page 28: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 29: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Bayesian Hierarchical Linear Mixed Model

Posterior Distribution

Page 30: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 31: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 32: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 33: Soil property recovery on a natural gas pipeline reclamation  chronosequence

Table 1. General soil properties for each treatment, years combined. Values are sample mean, with standard error of the mean in parenthesis (n=6).

Page 34: Soil property recovery on a natural gas pipeline reclamation  chronosequence
Page 35: Soil property recovery on a natural gas pipeline reclamation  chronosequence

--