SOCIAL IMPACT ASSESSMENT STUDY REPORT FINAL REPORT ACQUISITION FORCHELLANAM FISHING HARBOUR CONSTRUCTION PROJECT Requiring Agency rbour Engineering Department m Division, Munambam 27thApril, 2018 SIR Unit RCSS RAJAGIRI COLLEGE OF SOCIAL SCIENCES (AUTONOMOUS) Kajagiri P.O., Kalamassery Pin : 682 104 Ph: 0484 2911111 - 2555564 www.rajagiri .edu

Transcript of SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf ·...

Page 1: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

SOCIAL IMPACT ASSESSMENT STUDY REPORT

FINAL REPORT

ACQUISITION FORCHELLANAM FISHING HARBOUR CONSTRUCTION PROJECT

Requiring Agency rbour Engineering Department

m Division, Munambam

27th April, 2018

SIR Unit

RCSSRAJAGIRI COLLEGE OF SOCIAL SCIENCES (AUTONOMOUS)

Kajagiri P.O., Kalamassery Pin : 682 104

Ph: 0484 2911111 - 2555564 www.rajagiri .edu

Page 2: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

SOCIAL IMPACT ASSESSMENT STUDY REPORT

FINAL REPORT

LAND ACQUISITION FOR CHELLANAM FISHING

HARBOUR CONSTRUCTION PROJECT

SIA Unit

Rajagiri College of Social Sciences Rajagiri P.O Kalamassery

Pin: 682 104 Ph: 0484 29110-332

www.rajagirioutreach.org

27st April 2018

Page 3: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

SOCIAL IMPACT ASSESSMENT STUDY REPORT

FINAL REPORT

LAND ACQUISITION FOR CHELLANAM FISHING

HARBOUR CONSTRUCTION PROJECT

SIA Unit

Rajagiri College of Social Sciences Rajagiri P.O Kalamassery

Pin: 682 104 Ph: 0484 29110-332

www.rajagirioutreach.org

27st April 2018

Page 4: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

CONTENTS

CHAPTER 1 - EXECUTIVE SUMMARY

1.1 Introduction - Project and Public Purpose

1.2 Location

1.3 Size and Attributes of Land Acquisition

1.4 Alternatives Considered

1.5 Social Impacts

1.6. Mitigation Measures

CHAPTER 2 - DETAILED PROJECT DESCRIPTION

2.1 Background of the Project

2.2 Rationale for Project

2.3 Project Size, Location, Production Targets, Costs and Risks

2.4 Examination of Alternatives

2.5 Phases of the Project Construction

2.6 Core Design Features and Size and Type of Facilities

2.7 Need for Ancillary Infrastructural Facilities

2.8 Work force requirements

2.9 Details of Environment Impact Assessment Study Conducted

2.10 Applicable legislations and policies

CHAPTER 3 –TEAM COMPOSITION, APPROACH, METHODOLOGY AND

SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT

3.1 Details of Study Team members

3.2 Methodology and Tools Used

3.3 Overview of Information/Data Sources Used

3.4 Site Visits and Information Dissemination

3.5 Socio Economic Survey

3.6 Compilation and Verification of Data

3.7 Data Analysis and Report Writing

3.8 Process and Schedule of Activities

3.9 Community and Public Consultation

CHAPTER 4 - LAND ASSESSMENT

4.1 Entire area of impact under the influence of the project

4.2 Land requirement for the project

4.3 Use of Public Land

Page 5: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

4.4 Land Already Purchased

4.5 Quantity of Land Proposed to be acquired

4.6 Nature, Present Use and Classification of Land

4.7 Size of Holding,Ownership Patterns, Land Distribution and Number of Residential

Houses

4.8 Previous transactions in the area for the last three years

CHAPTER 5 - ESTIMATION AND ENUMERATION

5.1 Directly Affected by the Project

5.2 Indirectly Affected by the project

5.3 Inventory of productive assets

CHAPTER 6 - SOCIO-ECONOMIC AND CULTURAL PROFILE

6.1 Demographic details

6.2 Income and poverty level

6.3 Vulnerable group

6.4 Land Use and Livelihood

CHAPTER 7 - SOCIAL IMPACT MANAGEMENT PLAN

7.1 Approaches to Mitigation

7.2 Measures to Avoid, Mitigate and Compensate Impact

7.3 Measures those Impacts are included in the Terms of Rehabilitation and Resettlement

7.4 Measures that the Requiring Body has stated it will introduce in the Project Proposal

7.5 Alterations to Project Design and Additional Measures that may be required to Address

The Extend and Intensify of Impacts across Various Groups identified during the Social

Impact Assessment Process

7.6 Detailed Mitigation Plan

CHAPTER 8 –SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL

FRAMEWORK

8.1 Institutional Structures and Key Persons

CHAPTER 9 - SOCIAL IMPACT MANAGEMENT BUDGET AND FINANCING OF

MITIGATION PLAN

9.1 Costs of all Resettlement and Rehabilitation

9.2. Annual Budget and Plan of Action

9.3. Funding Sources with Break Up

Page 6: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

CHAPTER 10–SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND

EVALUATION

10.1. Key Monitoring and Evaluative Indicators

10.2 Reporting Mechanism and Monitoring Roles

10.3. Plan of Independent Evaluation

CHAPTER 11–ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION

ON ACQUISITION

Page 7: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

List of Tables

1.5.1 Analysis of the Various Possible Social Impacts

4.1.1 Area of impact

4.5.1 Quantity of land acquisition

4.7.1 Ownership Pattern

5.1.1Duration of possession/owning

5.3.1Income earning factors affected

5.3.2Utilities Affected

6.1.1 Age Group and Gender

6.1.2Religious Group

6.1.3 Social Group

6.1.4Marital status of Project Affected Persons

6.1.5 Family Pattern

6.1.6Educational Attainment of Project Affected Persons

6.2.1Classification of Families – PDS System

6.2.2 Family Monthly Income

6.2.3Family Monthly Expenditure

6.2.4Occupational Pattern and Non Working Status of Project Affected Persons

Page 8: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

LIST OF ANNEXURES

1. (a) 4 (1) Gazatte Notification

(b) 4 (1) Notification (Malayalam)

(c) 4 (1) Notification (English)

(d) Chellanam Harbour and Approach Road Alignment Sketch

2 . Socio Economic Survey Questionnaire

3 . (a) Public Hearing Notification (Madyamam)

(b) Public Hearing Notification (Deshabhimani)

4. SIA in News

5. Public Hearing Notice to the affected families

6. (a) List of participants in Public Hearing –affected families and public

(b) List of Participants - officials

7. Government of Kerala – Revenue Department- State Policy For

Compensation and Transperancy in Land Acquisition.

8. Details of affected families

Page 9: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Rajagiri College of Social Sciences (Autonomous)"College With Potential For Excellence"

RAJAGIRI COLLEGE OF SOCIAL SCIENCES

(AUTONOMOUS)

(Affiliated to Mahatma Gandhi University)NAAC Accreditation

Year 2000 at Five Star Level

Year 2007 at A ’ Level

Year 2013 - at A G rade with C G P A of 3.70 on 4 point scale

Declaration

As per the notification No.C7-135157/17 dated 02.11.2017 from District Administration

-makulam, Rajagiri College of Social Sciences is assigned as the SIA Unit to study the Social

.mpact Assessment of Land Acquisition for Chellanam Fishing Harbour Construction project.

The land details are given to the SIA team by Special Tahsildar Office (LA) GCDA, Emakulam.

The SIA team has collected data from the project affected families and the stake holders at

fhellanam Harbour , the proposed project area. The supportive documents have to be verified by the concerned authorities.

r P.O., Kalamassery, Kochi - 683 104, India. Phone : (911-0484-2555564,2911111 Fax : (91) - 0484 -2532862

E-mail: admin @ rajagiri. edu Website : www.rajagiri.edu

- Y i

Ihairman,SLA UnitRajagiri College of Social Sciences

24.04.2018Kalamassery

Page 10: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

1

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 1

EXECUTIVE SUMMARY

1.1. Introduction - Project and Public Purpose

The State of Kerala has 590 km coastline lying over 9 coastal districts. Kerala has highest densities of population in its coastal zone. Fishing industry occupies an important role in the economy of the State. According to available estimates of the potential fishery resources of the South West coasts, Kerala possesses the richest fishing grounds in the area and the State’s share in the National Marine production is about 20-25%. There were an estimated 177068 active fishermen in the State, distributed in 223 coastal villages and about 55,000 fish crafts operating in the Kerala coast, more than 50% of which are mechanized. Though the coastal zone in Kerala is boon to the State, its instability due to erosion of its shoreline poses a serious problem to the State, requiring frequent attention. The fishing activity is dispersed along the coast. What fishermen looking for is unhindered fishing activity and protection of their boat and accessories on shore throughout the fishing season. For the proper planned development of the fishing industries, introduction of new generation crafts, processing and marketing, landing and shore based facilities are some of the essential pre requisites. As a part of developing fishing industry, the Government of Kerala is implementing the programme of construction of many new Fishing Harbours and Fish Landing Centres for providing landing and berthing facilities for mechanized boats and traditional crafts.

The proposed Fishing Harbour in South Chellanam has assumed importance in view of the increasing number of fishing vessels calling at the harbor without basic facilities. Lack of a harbor between Fort Kochi and Arthungal in Alappuzha district is one reason for the Chellanam assuming importance. The project aims to develop the Chellanam Fishing gap, in Ernakulam district to full-fledged fishing harbour. Most of the people in ChellanamGramaPanchayath make their living by the income from fishing and agriculture. Fishermen work at deep sea and fresh water fishing, using the latest technologies. The project will facilitate operation of both mechanized and traditional vessels in all seasons by providing sheltered basin. Hygienic landing and fish handling facilities, marketing facilities and protection of coast from sea erosion etc are also envisaged in the project. The project will have a very positive effect on the socio- economic condition of the region by reducing the cost of operation of the fishing vessels from the area and increasing number of working days of the vessels.

Page 11: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

2

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Major components proposed in the project are construction of two breakwaters, one quay wall, one auction hall, an administrative building, locker rooms, toilet block, dormitory, internal roads and parking area, gate and gate house land protection works, water supply arrangements and sewage disposal facilities. Though the first phase of the project was commissioned in August 2010, apart from the work of two break waters for the offshore harbour, the rest of the on shore work is yet to be initiated.

1.2.Location

The fishing gap in Chellanam located as 250 m west of Thoppumpady – Chellanam State Highway and 8.5 km from NH 47 at Eramallore Junction.

1.3. Size and Attributes of Land Acquisition

The area required for constructing the proposed ChellanamHarbour is 1.4552 Hectare as per the Gazette Notification from Ernakulam District Administration dated 16.01.2018. The land is mainly private land and there is one family to be evicted for the project.

1.4 Alternatives considered

The harbour should be constructed at a natural fishing gap and hence it is proposed at

the Kandalkadu Fishing Gap in ChellanamPanchayat. So no alternative is more

suitable than the present site and more importantly the construction of a main

component of the Harbouri.e., breakwaters were already constructed.

For the construction of road connecting the proposed harbour and the Thoppumpady

– Chellanam State Highway land acquisition is required. For the same the alignment

which proposed at the preliminary proposal was altered later. As per

thepreliminaryalignment 9 houses were to be evicted for constructing an 8 m wide

road (Two Lane road to the harbour from Main Road).

In order to avoid hardship of the same and displacement of 9 families the

aforesaid alignment was changed. The new proposed road is 250m south to the first

proposed road. The width of the road is reduced to 4 m (single lane) in order to

minimize the impact of the proposed land acquisition. In the present alignment only

one family need to be relocated. For the rehabilitation of the aforesaidfamily and for

Page 12: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

3

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

constructing an office building for Harbour Engineering Department, acquisition of 10

cent land adjacent to the main road is also planned in the land acquisition proposal.

1.5 Social Impacts

Table 1.5.1Analysis of the various possible social impacts

Sl.

No

Type of Impact Status

1 Loss of Land 31 Land would be affected

2 Loss of Built-up

Property

1 house would be affected

3 Loss of Productive

Assets Trees including coconut trees, Mango trees,

Mahagani etc. would be destroyed. Kitchen garden

of a family also would be affected

4 Loss of Livelihood Nil

5 Loss of Business 2 tea shops and 1 petty shop will be affected (1 tea shop run by a family and another 1 tea shop

jointly run by 3 families)

6 Loss of utilities

lines

Water supply line of a family and water tank of a

family would be affected

7 Displacement of

Vulnerable Groups

1 Elderly person, 1 Mentally challenged and 1 child

below 18 years are included in the displaced family

Note: The above data is arrived as per the information provided by the respondents

during the Survey. Supporting documents needto be verified.

The difficulties which may cause to the local residence during the construction period

also be considered as a social impact. There are chances for health issues to the

residents related to dust and noise pollution.

If the height of the approach road is rose beyond 1 meter from the existing

level, it will adversely affect the residents in the nearby area of the proposed road. If

proper arrangements are not made, the water level while monsoon will be rise and

flow of water will also be hindered.

Page 13: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

4

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

1.6. Mitigation Measures

It appears from the analysis and overview of the act that the provisions of

compensation for land acquisition under RTFCTLARR Act, 2013 will be sufficient to

manage the social issues. Speedy disbursement of compensation is recommended.

Compensation as per RTFCTLARR Act, 2013 will be sufficient to mitigate the impacts

like loss of land, loss of productive assets, loss of business, loss of public utilities lines

and displacement of vulnerable groups. Rehabilitation is needed for a family who will

be displaced by the land acquisition. Another family intending to construct a new

house might also affected by the proposed project. The land intended to be acquired

from the aforesaid family is the same land proposed for constructing a house for the

elderson ofthe family head. Rehabilitation of the aforesaid person is also suggested by

SIA Unit.

Adequate steps to be taken to mitigate the health issues that may be caused during

construction period are also recommended.

Page 14: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

5

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 2

DETAILED PROJECT DESCRIPTION

2.1. Background of the Project

Though the coastal zone in Kerala is boon to the State, its instability due to erosion of

its shoreline posses a serious problem to the State, requiring frequent attention. The

fishing activity is dispersed along the coast. What fishermen looking for is unhindered

fishing activity and protection of their boat and accessories on shore throughout the

fishing season. For the proper planned development of the fishing industries,

introduction of new generation crafts, processing and marketing, landing and shore

based facilities are some of the essential pre requisites. As a part of developing fishing

industry, the Government of Kerala is implementing the programme of construction

of many new Fishing Harbours and Fish Landing Centres for providing landing and

berthing facilities for mechanized boats and traditional crafts.

The project aims to develop the Chellanam Fishing gap, in Ernakulam district to full-

fledged fishing harbour. Most of the people in ChellanamGramaPanchayath make

their living bythe income from fishing and agriculture. Fishermen work at deep sea

and fresh water fishing, using the latest technologies. The project will facilitate

operation of both mechanized and traditional vessels in all seasons by providing

sheltered basin. Hygienic landing and fish handling facilities, marketing facilities and

protection of coast from sea erosion etc are also envisaged in the project. The project

will have a very positive effect on the socio- economic condition of the region by

reducing the cost of operation of the fishing vessels from the area and increasing

number of working days of the vessels.

Major components proposed in the project are construction of two breakwaters, one

quay wall, one auction hall,one administrative building, locker rooms, toilet block,

dormitory, internal roads and parking area, gate and gate house land protection

Page 15: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

6

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

works, water supply arrangements and sewage disposal facilities. Though the first

phase of the project was commissioned in August 2010, apart from the work of two

break waters for the offshore harbor, the rest of the on shore work is yet to be

initiated.

2.2. Rationale for Project

The proposed Fishing Harbour in South Chellanam has assumed importance in

view of the increasing number of fishing vessels calling at the harbor without basic

facilities. Lack of a harbor between Fort Kochi and Arthungal in Alappuzha district is

one reason for the Chellanam assuming importance. The project aims to develop the

Chellanam Fishing gap, in Ernakulam district to full-fledged fishing harbour. Most of

the people in ChellanamGramaPanchayath make their living by the income from

fishing and agriculture. Fishermen work at deep sea and fresh water fishing, using the

latest technologies. The project will facilitate operation of both mechanized and

traditional vessels in all seasons by providing a sheltered basin. Hygienic landing and

fish handling facilities, marketing facilities and protection of coast from sea erosion etc

are also envisaged in the project. The project will have a very positive effect on the

socio- economic condition of the region by reducing the cost of operation of the

fishing vessels from the area and increasing number of working days of the

vessels.Considering the public advantage and interest, and treating as an inevitable

need, the project has to be implemented.

2.3. Project size, location, production targets, cost and risks

The area required for constructing the proposed Harbouris 1.4552hectare. The land is

mainly private land there is one family to be evicted for the project.

The fishing gap in Chellanam located in 250 m west of Thoppumpady – Chellanam

State Highway and 8.5 km from NH 47 at EramalloreJuction .

Page 16: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

7

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Initially Rs 5 crores were allocated for the project under Tsunami Rehabilitation

Project and after that NABARD RIDF XV allotted Rs 29.90 crores for the first stage of

the Harbour but due to non availability of land only breakwaters were constructed

and the remaining amount was lapsed. Now again NABARD sanctioned Rs.10.37

crores for completing the first stage development of the harbour.

2.4. Examination of alternatives:

The Harbour should be constructed at a natural fishing gap and hence it is proposed

at the Kandalkadu Fishing Gap in ChellanamPanchayath. So no alternative is more

suitable than the present site and more importantly the construction of the main

component of the Harbour viz. breakwaters were already constructed.

2.5. Phases of the Project Construction

Major components proposed in the project are construction of two breakwaters, one

quay wall, one auction hall, an administrative building, locker rooms , toilet block,

dormitory, internal roads and parking area, gate and gate house, land protection

works, water supply arrangements and sewage disposal facilities. Though the first

phase of the project was commissioned in August 2010, apart from the work of two

break waters for the offshore harbour, the rest of the on shore work is yet to be

initiated.

2.6. Core Design Features and Size and Type of Facilities

Major components proposed in the project are construction of two breakwaters, one

quay wall, one auction hall, one administrative building, locker rooms, toilet block,

dormitory, internal roads and parking area, gate and gate house, land protection

works, water supply arrangements and sewage disposal facilities.

Page 17: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

8

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

2.7. Need for Ancillary Infrastructural Facilities

As per the Environmental Impact Assessment studies conducted by Centre for

Enviornment and Development, Thiruvananthapuram, it is revealed that the most of

the environmental issues related to the project are of temporary in nature. Significant

damage to the ecosystem due to the implementation of the project is not expected.

Some minor long term effects are unavoidable and mitigation measures are suggested

for this to minimize the effect. The main suggestion is to implement an Environment

Monitoring Plan during the construction and operation of the project and provide a

green belt to improve aesthetic and environmental value of the area.

2.8. Workforce requirements

The work force is equipped with modern machineries and planned man power in

various range in terms of skilled, semi- skilled and un-skilled labours. The

construction work is tendering to the contractors and they will do the work by using

sufficient machinery and labour force.

2.9. Details of Environment Impact Assessment StudyConducted

Rapid Environmental Impact Assessment of the project were carried out by Centre for

Environment and Development, Thiruvananthapuram in Oct -2007.As per the

EIAstudys it is revealed that the most of the environmental issues related to the

project are of temporary in nature. Significant damage to the ecosystem due to the

implementation of the project is not expected. Some minor long term effects are

unavoidable and mitigation measures are suggested for this to minimize the effect.

The main suggestion is to implement an Environment Monitoring Plan during the

construction and operation of the project and provide a green belt to improve

aesthetic and environmental value of the area.

Page 18: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

9

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

2.10 Applicable Legislations and Policies

The applicable laws on land acquisition, rehabilitation and resettlement for the

proposedChellanamHarbour and approach road

The Right to Fair Compensation and Transparency in Land Acquisition,

Rehabilitation and Resettlement Act, 2013

The Right to Fair Compensation and Transparency in Land Acquisition,

Rehabilitation and Resettlement Act, (Kerala) Rules 2014

The Right to Fair Compensation and Transparency in Land Acquisition,

Rehabilitation and Resettlement Act, (Kerala) Rules 2015

Government of Kerala – Revenue Department -State Policy for Compensation

and Transparency in Land Acquisition

Right to Information Act, 2005

The Rights of Persons with Disabilities Act, 2016

Page 19: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

10

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 3

TEAM COMPOSITION APPROACH METHODOLOGY AND SCHEDULE OF

THE SOCIAL IMPACT ASSESSMENT

As per the Notification No.C7-135157/2017dated 30th November 2017,

Ernakulam District Administration has selected RajagiriCollege of Social Sciences as

the SIA Unit to study the Social Impact Assessment of proposedLand Acquisition for

Chellanam Fishing Harbour project.

The objective of Social Impact Assessment (SIA) is to enumerate affected land

and structures, affected families and persons, to identify social impacts, and to

prepare Social Impact Management Plan (SIMP). In order to capture data for the

present exercise, both primary as well as secondary sources were systematically

tapped. As a part of SIA, census mode socio-economic survey has been conducted by

experienced members of SIA Unit in the area of ChellanamHarbour projectto assess

the adverse impacts of the project.

3.1. Details of Study Team Members

The study team is headed by the Principal of Rajagiri College of Social Sciences

who is the Chairman of SIA Unit. A team of 6 members having experience in

conducting Social Impact Assessment Study and Socio Economic Surveys were

assigned for field level data collection, monitoring of data collection and co-ordination

of the study. Representatives from Revenue Department supported the investigators

to identify the affected families.

Sl.No Name Qualification and

Designation

Experience

1 Dr.Binoy Joseph (Principal, Rajagiri College

of Social Sciences)

MA(HRM), LLB, Ph.D. Chairman - SIA Unit

22 years in teaching, research

and training

2 Meena Kuruvilla

MSW,

Consultant- SIA Unit

30 years in

development

sector

3 Maria Tency.V.S

MA, DSS,

Research Associate

25 years in

development

sector

4 Deepu.K.Uthaman MSW

Research Associate

2 years and 4

months experience

Page 20: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

11

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

in development

sector

5 Arun Mathews George

MSW, Documentation

Officer

1 year in

development

sector

6 Biju C.P BA

Research Associate

23 years in

development sector

3.2 Methodology & Tools used

The objective of Social Impact Assessment (SIA) is to enumerate affected land

and structures, affected families and persons, to identify social impacts, and to

prepare Social Impact Management Plan (SIMP). In order to capture data for the

present exercise, both primary as well as secondary sources were systematically

collected. SIA unit had also examined the records and documents including the

alignment drawing of the proposed project. SIA team had also made a site visit along

with the land revenue officials for information dissemination. Questionnaires and

interview schedules were used as tools for data collection.

3.3. Overview of Information/Data Sources Used

The study team reviewed the relevant documents, reports and project

alignment drawing. Secondary sources information were collected from various

concerned departments, and a host of other literatures. Thus, the secondary sources

information complemented the primary data elicited through field survey from the

affected people and other stakeholders. Understanding was created about the

physical, social, economic, and cultural set-up of the project area before undertaking

detailed field investigations.

Page 21: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

12

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

3.4 Site Visits and Information Dissemination

Before starting the detailed Social Impact Assessment study, the field visits and

Pilot Study of the Socio Economic Survey was conducted where few respondents were

administered the Interview Schedule and their feedbacks were collected. The team

then inculcated the necessary addition and deletions in the interview schedule.

During the Second week of December 2017, SIA team visited the sites to verify the

alignment drawings on the ground and to identify the affected areas. After identifying

the affected areas SIA unit consulted with different stakeholders at the project area

and organized meetings with them to generate awareness about the study. The survey

team collected the data in the months of January and February 2018.

3.5 Socio Economic Survey

Before the actual household Socio Economic Survey, all the properties that

were likely to be affected by the project were identified with the support of Revenue

Department (GCDA - LA) officials. The survey interview schedule was pre-tested. The

survey was conducted through door-to-door personal interview. In thisinterview, size

and nature of land were recorded. The details of affected families, possession of legal

documents (if any, towards the claim of property),data related to social profile, family

details, occupation, source of income, family expenditure, self employment activities,

employment pattern were collected. Most part of the interview schedule has been pre-

coded except those reflecting the opinion and views of PAFs, which have been left

open-ended. Before filling the questionnaires, the affected families were asked to have

a copy of the necessary documents they need to produce as proof of their ownership

on property. So documents like- Aadhar Card, Ration Card, Voter’s Identity Card or

any other documents were verified whichever made available.

Page 22: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

13

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

3.6. Compilation and Verification of Data

Survey forms duly filled were consolidated and entered into a database. This

information was updated on a regular basis as and when and data for incomplete

forms were filled in.

3.7. Data Analysis and Report Writing

Once the data were collected and finalized with all the necessary changes,

analysis of collected data was done.

3.8 Process and Schedule of Activities

30.11.2017 - District Collector, entrusted RAJAGIRI College of Social

Sciences to conduct the SIA study

16.01.2018 - Publication of 4 (1) notification

January, February 2018 - Data Collection and Draft Report Preparation

03.03.2018 - Notification for public hearing

15.03.2018 - Draft Report Submission

17.03.2018 - Public hearing

27.04.2018 - Final Report Submission

3.9 Community and Public Consultation

Discussions were conducted by SIA unit with various primary and secondary

stakeholders in order to obtain their views and suggestions to minimize adverse social

impacts. The methods which were adopted for conducting public consultation were (i)

Informal personal consultation (ii)In-depth individual interviews.

Public Hearing Conducted

A public hearing was held on 17th March 2018 in St.George L.P.S. South

Chellanam as a part of the Social Impact Assessment Study as per the regulations of

RTFCTLARR Act, 2013. Newspaper notification in Form 5 (as per Rule 14 (1)) was also

made by the SIA Unit on 3rd March, 2018 intimating about the public hearing. 39

persons including the Parish priests of the nearby Catholic Churches had attended the

public Hearing. Mr.K.Omanakuttan, Special Tahsildar (L.A), G.C.D.A.Ernakulam,

Mr.Madusoodanan.N.G., A.E.E., Harbour Engineering Division, Chellanam and

Mrs.MeenaKuruvilla, representing Chairman, SIA Unit had replied to the queries of

the participants. The other officials from GCDA, Ernakulam, Harbour Engineering

Division, Chellanam, Rajagiri College of Social Sciences (SIA Unit), Village Office,

Chellanam and the representatives from ChellanamGramaPanchayath were also been

present in the Public Hearing.

Page 23: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

14

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

The public hearing which was video recorded was transcript into writing and

the queries and suggestions raised by the participants were submitted to the requiring

body seeking remarks.

The queries and suggestions raised and remarks by the requiring body are as follows:

Respondent’s Name and Address

Survey No.

Situation Explained Issues/queries raised

Reply from the officials concerned

For Vironi.A.X T.E.Thomas Thayyil House Chellanam

449/11 Chellanam harbor is the only way to getaway for the local people during natural calamities. ½ k.m extension of sea wall to west will be a protection during calamities

Extension of sea wall ½ k.m to west

Cannot extend breakwater to west side arbitrarily. It requires extensive study. The proposal can be considered in the second stage development of the Harbour

KISHORE.P.E. Pariyathussery House Kandakadavu

His mother Philomina Pariyathussery, owns 36 cents of land in the affected area (west to Lakshamveedu colony). As per the resurvey record the whole property was considered as sea and the surveyor reported that no land ownedby Philomina is existing in the project area. He has given a petition to the Collector and thus resurvey has done again. The surveyor opined that he could not write it as land, as he already noted it in the resurvey as sea. The petitioner got the survey report through RTI and submitted the same to the LAO during the public hearing. Land Tax has paid till 2007 and presented the receipt to LAO during public hearing.

Where should he made enquiry to get a clarity about his land and what are the steps to be carried outfor getting compensation

As per LARR Act 2013 applicant is not eligible for compensation as the land is not in his possession

Antony Xavier Pollayil

448/15 448/17

He owns 7 cents of land from there yield coconuts more than Rs.800 per month. When will he

When will he get compensation

After the award is passed

Page 24: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

15

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

get compensation

Somanathan T.G. Tharayil House S.Chellanam

448/13 He has submitted his comments in writing to SIA agency: Chellanam Fishing Harbour project has been started in 2008. Land owners allowed entering the vehicles through their land for the construction purpose. Some land owners received payment for it but he has given the land free of cost. Each time after construction that temporary road had been destroyed. But after the break waters construction the land was filled with soil and the fishing boats started launching there and business also began there. The land owners co-operated with that aiming the development of our village. The people outside the state are also now depending the area for their livelihood. The Government has not done anything then even though the land owners were willing to surrender their land for the development of the village. In 2013 the Government has decided to acquire land for the project on a 3 times rate of the document which shows the highest land value in the locality and thus the land owners submitted a document of 10 cents land sold Rs.1,10,000/- per cent. Based on that the former collector decided Rs.2,70,000/ per cent. Many meetings have convened related to this. Few of the land owners did not sign the negotiation so the acquisition has not done and the project stalled. He has not signed the negotiation because he has 36 ½ cents land in survey no.448/13. Since the area of land is less as per the

1.Whether the previous decision on compensation exist now. 2. How much compensation will give now

1. No 2. The

amount of compensation will be calculated at the time of preparing DVS

Page 25: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

16

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

measurement of the Village office, the land was surveyed by the Taluk office considering his petition there. He has received a letter from the Collectorate intimating that he has more area of land and that should be decided by the Government Since the land acquisition and the project has been delaying for the last 10 years the land owners are preparing to approach the Hon’ble High Court.

Martin Earasseril Gujarathi Street Alappuzha

447/15 The meeting held on 4th September 2013 in Harbour Minister’s Chamber with the presence of Deputy Collector decided to acquire land in advance possession from the owners and notification published on November 30th. As per section 40 the alignment approved. But now it is cancelled .

As per which section the new alignment passed ?

The land acquisition process started afresh as per LA Act 2013, as per the request from Executive Engineer, Harbour Engineering Division, Munambam

Fr.AlexKochikaranveettil Vicar St.George Church S.Chellanam

SIA has suggested in November 2017 to be completed within 6 months period. Now it is completing 6 months period so it is lagging from SIA unit

Delayed SIA study

Form No.4 Notification for Land acquisition has issued from the District Collectorate on 16th January 2018. Immediately after that the process of SIA study started. SIA study process is undergoing in the stipulated time

2 sea breakers were constructed 7 years before. .Administration

1. Construction and

1. There is no

Page 26: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

17

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

sanction accorded for the construction of sea wall after the study conducted by IIT but Technical sanction is not yet received. If that was constructed monsoon will not make much difficulties

extension of Sea Wall

2. Dredged soil for the project should use to make bund

funds allotted to HED for this as of now. So no comments.

2. Dredged soil required for the development of Harbour and Panchayath authorities requested to fill a portion of the land for the construction of hospital at Chellanam

Page 27: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

18

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

The document value of the land will be very less compared to market value. Presently the market value in the area is around 3 to 3 ½ lakh.

1. Consider the market value for compensation

2. Clarity on

how much will get for the land as compensation

3. A clarity on

how much period requires to complete Land acquisition

4. Is it possible to approach court if anybody has difference of opinion

1. The land value is calculate as per the provision of LARR Act 2013

2. The amount of land value will be intimate after the approval of DVS

3. As per the provision of LARR Act 2013

4. Yes

There is no clarity on the roads included in the harbor project.

A road from north to south for the mobility of the public to be included outside the walls of harbour

That can be considered after getting approval from Higher officers

George Xavier (Raju) Thykkoottathil Kattiparambu

443/1 His property lies first in the project area and is dry land.

Consider the first position of the land favourably for compensation and

Speedy action being taken

Page 28: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

19

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

a speedy action requires

Francis 7 to 8 times convened meeting at Collectorate which cause loss of working days and monitory lose

Requires speedy action

Now the process will be quick as the all necessary funds are sanctioned by the Government

Charles The project is delaying Requires speedy action

Now the process will be quick as the all necessary funds are sanctioned by the Government

Omana.P.E. Secretary MatsyathozhilaliSangham S.Chellanam

449/3 449/4 449/7

Harbour will lessen the hardship of fishermen and now it is delaying

Requires the sketch of the land owned by the society Fast action requires for land acquisition

The sketch will be issued on application after the remittance of required fees Speedy action being taken

Johnson To limit the impact of natural calamities the construction of break waters (pulimuttu) is necessary.

1. 3 roads to be constructed in the project

2. Construct

break waters (pulimuttu)till 7 km

1. 2 roads are proposed in the project

2. This will require extensive study

K.B.Mohan

Project is a dream of the fishermen community which is lagging

1. Requires speedy procedures.

1. Now the process will be

Page 29: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

20

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

2. Good compensation for the affected people

3. Petrol

pump and kerosene pump should be included in the project

4. A road

from North to South for the commutation of the public should be included in the project

quick as the all necessary funds are sanctioned by the Government

2. Compensation will be given as per the provisions of LARR Act 2013

3. Petrol pump can be considered after harbor become operational

4. Road can be considered after obtaining sanction from higher author

Page 30: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

21

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

ities.

VijiManoharan W/o.RajanManoharan

447/14 She has given a written application to SIA unit stated that : She is running a teashop alongwith 2 other families in the affected land. Her family comprises of her father, a mentally challenged brother, husband and children. Her husband is a fisherman. The income from the teashop is a major livelihood for them.

Requested to make arrangement s to continue the teashop in the affected area.

Compensation as per the provisions of the LARR Act. Continuation of tea shop can not be promised now as the land will be used for many other purpose for the functioning of harbour

Varghese Xavier Earasseril, Martin CheriyanEarasseril& For Late Thomas Vakkachan (Adolf) his son BenyVakkachan

447/1 447/15 448/1

These 3 affected families together has given a written petition to SIA unit during the Public hearing in which the following suggestions/objections stated: 60% of the affected land belongs to them. So they are the key stakeholders of the project. They are experiencing the impact of the project since 2007

Name of Thomas Vakkachan (George Adolf) is written in the notice as EliyasVakkachan

The name should be corrected as EliyasVakkachan

Not applicable

The extend of land in the Gazatte notification is not correct. A petition has given to District Collector on 6/04/2015 (L3-48991/15) against the incomplete resurvey and proceeded as S6-5240/2015 and S6-2701/2015 resurvey was again conducted by Kochi Taluk office in the year 2015-16. But till date the petitioners had not received any reply from District Collectorate or Taluk office about the final decision. The Gazette Notification

The actual extend of land should be recorded

The following survey number and extent are approved by the District Survey Superintendent Sy.No.447/1-0.7340 447/15-0.0674(H) 448/1-0.0560(H)

Page 31: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

22

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

dated 16.01.2018 also mentioned the land extent based on the old land revenue records, without considering the new records.

Revenue officials’ order to conduct SIA is illegal. SIA is insisted in the section 4 of LARR Act 2013 as the initial stage of a project and it is not required in any other stage. The Chellanam project has partially completed and hence no SIA requires. The requiring authority has given the new request to the District Collector on 15/09/2017 for acquiring land as “urgency provision” as mentioning in the Section 40 of the LARR Act . In the Form No.2 enclosed with the request they stated the reason for urgency as “Construction of Fishing Harbour stalled due to non availability of land. Section 9 of the LARR Act insists that SIA can be avoided for acquiring land as per section 40. Section 4(1) insists that the District Collector should consult the LSG or Gramasabha before starting the procedures as per section 4. Neither the District Collector consulted the Panchayath authorities nor the Panchayath or GramaSabha requested to the Collector for conducting an SIA. The State Government GO(P)No.485/15/RD as per the section 108 of the Act reveals that

On what basis Revenue officials decided to do SIA How SIA is a mandatory for Chellanam project

As per the provisions of LARR Act 2013

Page 32: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

23

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

“SIA Study shall be conducted in projects where it is mandatory. . Since the Harbour project is already implemented partially the authorities should reveal how the SIA is “Mandatory” for the project now. Section GO(P)No.485/15 RD based on section 108 of LARR Act also says “SIA study shall be conducted in projects where it is mandatory” LARR Act 2013 which insist SIA, was not existed when the Revenue Department published the first Gazatte Notification on 30/11/2013. It came into force on 1/1/2014 and as per the 24(1)(a) the then existed land acquisition would come under the Act. So the land acquisition of Chellanam Fishing Harbour comes under the Act from 1.1.2014. The 9 families were notified for land acquisition then, but the concerned authorities were not recommended for SIA. So the present decision to do SIA is not with a good intension. If it aims good, the new notification for SIA may limit to Survey No. 450 and 451. Hence the exparte decision of the Revenue department to conduct SIA without seeking the opinion of Gramasabha as insisted by section 4(1) and without avoiding SIA as per section 9 of the LARR Act is to delay or stale the land acquisition.

The Gazatte Notification published by Revenue Department as section 4 dt.16.01.2018 “ Need or may be needed, for a public purpose, ie for the construction of ChellanamHarbour and its approach roads”, stated that the land “need or may be needed”

Page 33: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

24

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

indicates that it is a prerequisites for ChellanamHarbour Project. Actually the project was partially completed hence it will not comes under section 4. The State Government declared the project on 07.09.2007 as G.O.(Rt)No.579/2007/F&PD and has partially implemented . So it does not come under section 4 of LARR Act 2013. In 2008 the then Chief Minister Sri.V.S.Achuthanandan laid the foundation stone of the project and the Central Forest-Environment Ministry has accorded environmental sanction for the project via order No.10-20/2008-IA dated 15.04.2008. As the 1st phase the construction of water breakers began in May 2008 by the Harbour Engineering division spending 19.5 crores rupees and completed before March 2009. And the department informed the government about the completion of launching facilities for fishing boats and basin for trade. Then the Government has accorded administrative sanction for the 2nd phase of the project as per G.O.(Rt)No.317/09/F&PD dt5/6/2009 and G.O.(Rt)No.13/2010/F&PD dt.4.01.2010. The government has accorded sanction for land acquisition as fast track for the 2nd phase development activities via G.O.(Rt)No.205/2012/F&PD dt.12.03.2012. The State High Level Committee convened on 12.03.2012 given sanction to District Collector to acquire 130.23 ares land and the Revenue department notified in the Gazatte on 30.11.2013

Page 34: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

25

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

announcing the land acquisition. All the land owners were willing for the acquisition. The survey nos in the present notification 443,446,447,448,449 were the same in the previous notification (4 years before). Hence it is clear that this is a continuation of the already started project. The requiring body, in their requisition Form No.2 stated that the construction of harbour stalled due to non-availability of land. So it is clear that the project was supposed to complete in 2014 if the land was acquired then. The delay in the land acquisition created difficulties to land owners which can not solve. Due to the delay in the project the Government has been losing more than 2 crore rupees per year as various fees and till date that may be accumulated nearly 10 crores rupees. Land owner’s difficulties and financial loss of the Government because of the delay in the project to be considered as a social impact

The SIA final report should be prepared considering that it is a continuation of the project started on 07.09.2007 and the social changes and the impacts caused should be examined. No social impact has occurred due to the delayed land acquisition by the Revenue officials. The authorities were aware that since there is no road facilities the fish lorries and other vehicles have to enter through the properties of private individuals to undergo the business activities in

Compensation should be given for the land owners for this trespass as per LARR Act Section 28.

Will be considered as per the provisions of LARR Act 2013

Page 35: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

26

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

harbor. In the Basic Value Report submitted by Special Tahsildar (LA) in 27/03/2015 stated that the land to be acquired is a “dry land without having public road or traffic facilities” Even though it is not a public road, from 2009 onwards 50 to 100 vehicles have been illegally entering through this land and doing business. It is clear from the notice given by Harbour Engineering department to the land owners and the orders of District collector 43493/12 dt.24.02.2015 and 47493/12 dt.14.09.2015 when the land owners opposed the vehicle passage, the usage of land for vehicle passage and business was with the support of Government. The petition submitted by the land owners (main stakeholders) to the ChellanamGramaPanchayath indicates that the LSG also given facilities for the drinking water vehicles to pass through this land as a trespass. (Government sponsored criminal trespass). This will come under RFCTLARR Rules 2014 Section 7(3)(f) “ the land if already…alienated….for the project” and consider as a serious social impact.

15000-25000 fishers are daily coming to the area and no lavatory facilities there which caused unhygienic usage of land. Incomplete construction of water breakers due to the carelessness of Revenue officials caused the impact of Okhi storm in the northern parts of the place which should be considered as a serious

Compensation should be given for the land owners for the unhygienic usage of land

All the compensation will be given as per the LARR Act 2013

Page 36: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

27

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

impact The harbor engineering department has done a construction in a public canal, survey no.443/12 spending nearly Rupees 14 lakhs and it gave away as they withdrawn that alignment. The remaining of that construction is to be considered as a social impact. The department has responsibility to retain that area in its former condition. Till date Harbour Engineering officials and Revenue officials has not described the impacts expected during construction period ie the hindering of the way to Earasseril Varghese Xaviersproperty which lays outside the affected property and the commutation of the people stays north to south and the petitioners passage to their ancestral house and church. And the disturbance may be caused in the drinking water distribution system. District collector did not inform the land owners that the notification 30.11.2013 has expired or withdrawn. The land owners are entitled for compensation when a notification expired or withdrawn as per LAAR Act 2013 section 93 and section 28 The Harbour has been functioning for 9 years from 2009 onwards without charging any fees or collecting any amount. The Harbour Engineering officials fear a public opposition against stopping that free service and charging of fee for the functioning

The difficulties for the public including hindering of the way may be caused during construction should be considered as a social impact. Compensation as per section 93 and section 28 of LARR Act 2013

Compensation will be given as per the provisions of LARR Act 2013

Page 37: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

28

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

of harbor, is one of the reason for delaying the project.

The area has developed as a tourist place after the constcuction of St.Francis Xavier’s chapel , as a fish trade centre and utilized the place as shooting location for the movies Kappirithuruthu,Velipaadintepusthakam, ee.ma.yow. Hence the area is developed as the most costly place at Chellanam village and the market value of the land has increased

Consider the developments in the area for compensation as per section 7(3)(k) of SIA & C Rules, 2014 of LARR Act 2013

Compensation will be given as per the provisions of LARR Act 2013

District Collector entrusted SIA unit to do the SIA based on G.O.(P)No.485/15/RD dt 23.09.2015 and other government instructions. The said order comes under the statutory rule as per section 108 of LARR Act 2013. The instructions in this order were not followed for the categorization of land. Special Tahsildar (LA) has not correctly studied the land in the affected area when categorizing it to decide the land value. There exists government land, panachayath owned land, owned land not having possession, possessed and owned land, ancestral land, seabed land which belongs different category and dfferent compensation measurement. Present categorization was not considering this and without consulting the land owners. A common price is decided without the consent of District Purchase Committee which cause social impact. G.O.(P)No.485/15/RD directs to give higher compensation for ancestral properties. As per the

Consider the category of the land for compensation Compensation for Seabed land as per Kerala Land Conservancy Act 1957 section 3(1) and 3(1)(b)

Category of the land is considered as per the guidelines specified in the LARR Act. LAO is not competent to proceed as per KLC Act

Page 38: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

29

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

definition of Supreme Court the petitioners land comes under “Ancestral Property” These families are paying tax to most of the ancestral property which remains seabed

The Government officials delaying the land acquisition for the past 4 years and the petitioners doubt that the current SIA is also to delay the project. So the land owners were planned to approach Hon’ble High Court to file a Writ petition requesting to acquire the land under the supervision of the commissioner entrusted by the Hon’ble Court on time bound basis. The Harbour Minister accorded an order to District Collector on 5/12/2013 to acquire the land on advance possession on an understanding with the landowners and in 4/10/2013 the State Government has given an order to constitute District Level Purchase Committee. After deciding the market value the District Collector has given an order on 07.12.2015 but that was not submitted for consent of State Level Empowered Committee. On 08/07/2016 MLA Sri.K.J.Maxi sent a letter to Revenue Minister stating that the notification is expiring also was not considered. The present SIA formalities are against section 9 of LARR Act 2013 is the new technique of the Revenue officials to create an unended delay in the project . The land owners who lost the faith in the Revenue officials entrusted

Revenue Department should recommend a State Level Empowered Committee for the acquisition of land based on Market value before 31st March

LAO is competent to act only in accordance with the LARR Act 2013

Page 39: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

30

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

the petitioners (key stakeholders) by signing their consent paper to approach the Hon’ble High Court and they have decided to give a Writ petition and informed the same to sri.K.J.Maxy and Sri.George Fernandez, (M.L.A.s) by writing.

Suggestions raised at the public hearing for the development of the project area:

1. Proper maintenance of the roads shall be carried out before monsoon

2. Inadequate health service facilities were pointed out. Construction of a

hospital was also recommended as an inevitable need by the community

Figure 3.9.1. Public Hearing:

Page 40: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

31

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 4

LAND ASSESSMENT

A socio-economic survey covering all affected families and individuals was

carried out in the months of January and February 2018. A structured interview

schedule was used to collect detailed information on affected property, impacts on

private assets, income and livelihood for a full understanding of impacts. The

objective of the survey was to assess social impacts on the people affected by the

project,their socio-economic profile,type of property, ownership of property, type of

impact its magnitude and details of affected property. The major findings and

magnitude of impacts are discussed in the following sections.

4.1 Entire area of impact under the influence of the project

The proposed ChellanamHarbour Project is planned to be implemented in an area

where majority of the land is used for residential purpose. Notwithstanding the

alignment of the project is designed in a way which structure of the residential users

are least affected by the project. Total 1.4453hectaresof land shall be acquired for the

project.Based on the property identification, the number of PAFs has been

determined. There are 42affected families consisting 173persons. Below mentioned

table gives a picture on the Entire area of impact of the project

Table 4.1.1 Area of Impact

Area of Impact Number

Impact on Properties 31

Total PAFs 42

Total PAPs 173

Total PDFs 1

Loss of Residence 1

Loss of Business (number of families) 5

Page 41: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

32

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Figure 4.1Land Inventories (Map of site of Proposed Chellanam Fishing Harbour

Project)

4.2. Land requirement for the project

The proposed project of construction of ChellanamHarbourshall require1.4453

hectares of land for the implementation of the project. The affected area is under

private possession.

4.3. Use of Public Land

No public property is hindered due to the implementation of the project.

4.4. Land Already Purchased

No land acquisition had been made for the proposed project. Although some

constructions for road had been made, the same does not include any land acquisition.

Page 42: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

33

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

4.5. Quantity of Land Proposed to be acquired

Table 4.5.1 Quantity of land acquisition

Loss of property (Area in Hectares) Number of title holders loosing property

Below 0.0100 8

0.0101 – 0.0200 6

0.0201 – 0.0300 4

0.0301 – 0.0400 6

0.0401 – 0.0500 1

0.0501 – 0.0600 1

0.0601 – 0.0700 2

Above 0.0701 3

Total 31

In total 31 properties are affected by the project. Table4.5.1reveals that8

individuals will lose below 0.0100 hectares and 6 individuals might forego land to an

extent between 0.0101 -0.0200.

4.6. Nature, Present Use and Classification of land :

The whole land to be acquired for the project is Dry land.

Out of the total 31 affected properties 14 properties are using for residential

purpose and 3 are using for business. 6 properties are using for fishing allied

activities and the remaining 8 properties are using as passage and are open land.

Some trees especially coconut trees are there in the affected area.

4.7. Size of Holding, Ownership patterns, land distribution and number of

Residential Houses

Table 4.7.1 Ownership pattern

Ownership Pattern Required Land (in Ha)

Owned by Fishermen Co-operative Society 0.0627

Individual ownership 1.3826

Total 1.4453

Page 43: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

34

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Total 1.4453 hectares of land shall be acquired for the project.The whole area of land is

under private ownership. Regarding the ownership pattern of land 30 are individual

ownership and 1 property is owned by an organization. Out of the total affected

properties 14 are using for residential purpose.

4.8. Previous transactions in the area for the last three years

Land ownership under the survey No.448/14 was transferred to two heirs by

will of transfer in 2015. The land under survey No.449/5 was partitioned and

ownership was transferred to 3 heirs. The survey No.451/13 also renewed the

registration of the document 2 years before.

Page 44: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

35

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 5

ESTIMATION AND ENUMERATION

This chapter comprises of estimation of which are directly affected, duration of

possession of property, Income earning factors affected etc.

Table 5.1.1 Duration of possession/ownership

Duration Number of families

Total

owner Running business

(not owners)

organisation

1-10 years 10 3 13

11-20 years 3 1 4

21-30 years 10 10

31-40 years 5 5

41-50 years 1 1

More than 50 years

5 5

Information not

available

5 5

Total 39 43

The project will affect 39 families who own the property, 3 families doing

business in the area and 1 organisation who own the land. Among the 39 families

who owned the property 10 families possess the property for 10 years, 3 families own

the property for 11-20 years and 10 families own it from 21 to 30 years. Since 5 family

owns the property from 31-40 years 1 family possess the ownership from 41 to 50

years. 5 families own the property for more than 50 years. 3 families (not owners)

and 1 owner are doing business in the project affected areafor more than 3 years.

The ownership of 1organisation comes under the period of 1-10 years. Information

not available for 5 families.

5.1 Directly Affected by the Project

In total the properties owned by 39families and 1 organisationshallbe

directlyaffected by the project.

Page 45: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

36

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Among them one family will lose their house and their property completely.

The land proposed to build a house for a family also would be included in the

affected property.

5.2 Indirectly Affected by the Project

Presently two tea shops and 1 petty shop are functioning in the project affected

area. One of the teashopis running by a tenant.The other tea shop is running by the

owner of the land along with 2 other families.The petty shop is owned by the owner

of the land. Even though this is not a major source of income of the concerned families

this could be considered as indirectly affected. (Source: affected families, sufficient

documents need to be verified).

5.3Inventory of Productive Assets

Table 5.3.1 Income earning factors affected

Income earning factors affected No of families

Coconut trees 81

Coconut saplings 7

Mango tree 4

Banana trees 8

Pooparathi 6

Guava 1

Mahagani 1

Tamarind 2

Kitchen garden 1

Table 5.3.1 reveals that 81 coconut trees and 7 saplings will have to destroy along with

other trees including 4 mango trees, 6 pooparathi, 1mahagani and 2 tamarind. One

family is having kitchen graden in the affected area.

Page 46: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

37

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Table 5.3.2 Utilities Affected

Utilities affected No of families losing utilities

Water tank 1

Water supply pipeline 1

Two pit toilet 1

Table 5.3.2 shows that,1 family will lose their water tank and the other 1

family's water supply pipeline is lying in the affected area. A two pit toilet using by

one family will lose due to the project.

Page 47: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

38

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 6

SOCIO-ECONOMIC AND CULTURAL PROFILE

Introduction

This chapter contains information about the socio economic and cultural

aspects of the affected families. It includes the demographic details, economic status,

vulnerability among the affected families, local economic activities in the area,

enumeration of livelihood affected families, socialization pattern of the project

affected persons and other related information.

6.1 Demographic Details

Table 6.1.1 Age Group and Gender

Age in years Gender

Total

Male Female

0-18 14 17 31

19-30 19 14 33

31-45 19 12 31

46-59 25 19 44

60 and above 18 16 34

Total 95 78 173

Table 6.1.1 reveals the age group distribution of the affected persons in the

area. 34persons are above 60 years of age out of them 18are male and 16 are females.

19 female members and 25 male member are in the age group of 46-59. 31family

members belong to the age group 31-45 years18males and 12 females contribute

towards this number.33 family members including 19 male and 14 female belong to

19-30 age group and 31 members ie14 male and 17female belong to the age group of 0-

18 years.

Table 6.1.2 Religious Group

Description No of families Percent

Hindu 13 30.95

Christian 24 57.14

Page 48: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

39

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Information not available

5 11.90

Total 42 100

Table 6.1.2 indicates the distribution of families on the basis of religious group.

Out of the 42 affected families 24 (57.14%) belong to Christian religion and 13 families

(30.95%) belong to Hindu religion.

Table 6.1.3 Social Group

Description No.of families Percentage

OBC 33 78.6

OEC 3 7.1

General 1 2.4

Information not availed 5 11.9

Total 42 100

Table 6.1.3 shows that out of the total affected families 78.6% ie 33 families belong to

OBC category. While 7.1% ie 3 families are coming under OEC, 1 family ( 2.4%) is

under General category.

Table 6.1.4 Marital status of Project Affected Persons

Marital Status Frequency Percent

Married 110 63.58

Unmarried 56 32.37

Widow/widower 7 4.05

Total 173 100

Table 6.1.4 depicts that among the total 173 members in the affected

families110(63.58%) are married and 56(32.37%) are unmarried. 7(4.05)

widows/widowers are included among the affected population.

Table 6.1.5 Family Pattern

Description No. of families Percent

Nuclear 25 59.52

Joint family 12 28.57

Page 49: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

40

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Information not available 5 11.9

Total 42 100

Among the affected families 25 families (59.52%) are nuclear families and 12 (28.57%)

are joint families.

Table 6.1.6 Educational Attainment of Project Affected Persons

Education attained No.of persons percentage

Illitterate 1 0.57

Upto 5th 44 25.43

6th to 10th 58 33.53

Plus Two/predegree 14 8.09

Degree 29 16.76

Technical 16 9.25

Post Graduation 3 1.74

Not applicable (Infants) 8 4.63

Total 173 100

Table 6.1.6 reveals about the information regarding the educational attainment

of the project affected persons. 44 members attained/attaining primary class

education while 58 members have attained/attaining secondary class education. 14

persons has studiedupto/pursuing Plus Two/Predegree. 29 members have

attained/pursuing graduation and 3 members have attained/pursuing post-

graduation. 16 members has acquired/attaining Technical qualification and 1

member is illiterate.

6.2 Income and Poverty Level

Table 6.2.1 Classification of Families – PDS System

Type of Ration Card No.of families Percentage

General Non Priority (White)

14 33.33

Non Priority State Subsidy (Blue)

3 7.15

Priority Card (Pink) 16 38.09

Page 50: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

41

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

AAY (Yellow) 4 9.53

Information not available 5 11.90

Total 42 100

Table 6.2.1 indicates the information about the distribution of families based on

the classification by Public Distribution System. 14 familiesarehaving General Non

Priority (White) and 3 families are having blue card. Pink and yellow cards possess

by 16 and 4 families respectively.

Table 6.2.2Family Monthly Income

Description

(Amount in Rs) No of families

Percentage

Below 10000 14 33.3

10001-20000 5 11.9

20001-30000 2 4.8

40001-50000 1 2.4

Above 50000 2 4.8

Information not revealed 13 30.95

Information not available 5 11.9

Total 42 100.0

Table 6.2.2 reveals that 14 families are having the monthly income below

Rs.10000 and 5 families having the income between Rs.10001 and 20000. 2 families

have monthly income between Rs.20001 and Rs.30000 and 1 family earns between

Rs.40001 and Rs.50000. 2 families earn above Rs.50000 per month. 13 affected families

did not reveal the information and it was not availed about 5 families.

Page 51: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

42

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Table 6.2.3 Family Monthly Expenditure

Description

(Amount in Rs) No of families

Percentage

Below 10000 11 26.2

10001-20000 6 14.3

20001-30000 1 2.4

30001-40000 1 2.4

40001-50000 1 2.4

Above 50000 1 2.4

Information not revealed 16 38.09

Information not available 5 9.53

Total 42 100.0

Among the affected families 11 are spending an amount below Rupees 10000 every

month, while 6 of them spend between Rs. 10001-20000. 1 each families are spending

in the range of Rs.20001-30000, Rs.30001-40000 , Rs.40001-50000 and above Rs.50000

per month. 16 families did not reveal the said information.

Table 6.2.4 Occupational Pattern and Non-Working status of Project Affected

Persons

Occupation No. of persons Percentage

Fishing 23 13.29

Private firm employee 15 8.67

Business 5 2.90

Construction field 6 3.47

Agriculture 1 0.58

Tea shop/stationery shop 5 2.90

Government servant 4 2.31

Self employed 4 2.31

Working abroad 3 1.73

Pensioners 12 6.94

Dependents 95 54.91

Page 52: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

43

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

Total 173 100

Among the total of 173affected persons 95ie 54.91% of the members

aredependants. Among the working people 13.29% are engaged in fishing. 8.67% are

working in private firms and 6.94% are benefitted through different pension schemes.

While 6 persons are working in construction field 5 are doing business. 4 persons are

government servants and other 4 persons are doing self employment. Among the

project affected persons 3 are working abroad.

6.3 Vulnerable Group

Among the total 173 affected persons 78women, 31 children and 34elderly who

all are vulnerable population. Besides 2 physically challenged and 1 mentally

challenged persons are also to be considered as vulnerable population.

6.4 Land Use and Livelihood

Out of the total 31 affected properties 14 properties are using for residential

purpose and 3 are using for business. 6 properties are using for fishing allied

activities and the remaining 8 properties are using as passage and are open land.

Some trees especially coconut trees are there in the affected area.

Page 53: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

44

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 7

SOCIAL IMPACT MANAGEMENT PLAN

7.1 Approaches to Mitigation

Not Applicable

7.2 Measures to avoid mitigate and compensate impact

Not Applicable

7.3. Measures those are included in the terms of Rehabilitation and Resettlement

Compensation as outlined in the Right to Fair Compensation and Transparency

in Land Acquisition, Rehabilitation and Resettlement Act, 2013 shall be provided to

the affected family.

10 cents of land included in the proposed acquisition is meant for the

rehabilitation of the displaced family and the construction of office building for

HarbourEngineering department.

7.4. Measures that the Requiring Body has stated it will introduce in the Project

Proposal

Sufficient fund has been reserved as compensation to the affected title holders.

7.5. Alterations to project design and additional measures that may be required to

address the extend and intensity of impacts across various groups as identified

during the Social Impact Assessment process

Not Applicable

Page 54: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

45

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

7.6. Detailed Mitigation Plan

Ref No Name, Address and Survey No

Impact Mitigation Suggested (Minimum Compensation to be provided

Schedule of RTFCTLARR Act, 2013

SIA/CHM/37 Sebastian K E S No: 451/10

Displacement

Compensation for land owners

First Schedule

Provision of housing units Land for land Subsistence grant Transportation Cost One Time Resettlement Allowance Stamp duty exemption

Second Schedule

SIA/CHM/40 Carmely Joseph Income Source Affected

Choice of Annuity Subsistence grant Transportation Cost One Time Grant to Artisan

Second Schedule

Page 55: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

46

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

SIA/CHM/12 ManoharanRajan

S No: 447/14

Income Source Affected

Choice of Annuity Subsistence grant Transportation Cost One Time Grant to Artisan

Second Schedule

SIA /CHM/19(b)

Xavier Antony S No: 448/15

Income Source Affected

Choice of Annuity Subsistence grant Transportation Cost One Time Grant to Artisan

Second Schedule

SIA/CHM/12a Sarasu Mohan Kandekkattparambil

Income Source Affected

Choice of Annuity Subsistence grant Transportation Cost One Time Grant to Artisan

Second Schedule

Page 56: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

47

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

SIA/CH/M/12b

SindhuShanmughan Kandekkattparambil

Income Source Affected

Choice of Annuity Subsistence grant Transportation Cost One Time Grant to Artisan

Second Schedule

Page 57: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

48

SIA Final Report – Land Acquisition for Chellanam Fishing Harbour Construction Project

CHAPTER 8

SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK

8.1 Institutional Structures and Key Persons

RTFCTLARR Act, 2013 defines the Administrator appointed by the State

Government would be the person responsible for Preparation of Rehabilitation and

Resettlement Scheme for affected families of Land Acquisition. Subject to the

superintendence, directions and control of the appropriate Government and the

Commissioner for Rehabilitation and Resettlement, the formulation, execution and

monitoring of the Rehabilitation & Resettlement Scheme shall vest in the

Administrator.

In the proposed Chellanam Harbour Project, the major mitigation measures from the

acquisition can be handled by providing the appropriate compensation under the

RTFCTLARR Act, 2013.

As per G.O. (Ms) No.485/2015/RD, dated 23/09/2015, The Kerala State Policy for

Compensation and Transparency in Land Acquisition,

The District Level Fair Compensation, Resettlement and Resettlement Committee

comprise:

District Collector,

Administrator for resettlement and rehabilitation,

Land Acquisition officer,

Finance Officer,

Representatives of the requiring body to take financial decisions on its behalf,

And the Representatives of Local Self Government Institution will monitor the

Rehabilitation Action Plan.

Page 58: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

49

SIA Final Report – Land Acquisition for Construction of Chambakkara Bridge and Approach Road for Kochi Metro Rail Project

CHAPTER 9

SOCIAL IMPACT MANAGEMENT BUDGET AND FINANCING OF

MITIGATION PLAN

9.1. Costs of all resettlement and rehabilitation costs

Sufficient fund has been reserved for rehabilitation.

9.2. Annual budget and plan of action

Not Applicable

9.3. Funding sources with breakup

Not Applicable

Page 59: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

50

CHAPTER 10

SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND

EVALUATION

10.1 Key Monitoring and Evaluative indicators

Not Applicable

10.2 Reporting mechanisms and monitoring roles

Not Applicable

10.3 Plan of independent evaluation

Not Applicable

Page 60: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

51

CHAPTER 11

ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON

ACQUISITION

One family would lose their housing need to be rehabilitated and the one family

whose proposed residence area is affected also to be relocated. So rehabilitation is

needed for the project.

Most of the people in Chellanam GramaPanchayath make their living from fishing

and agriculture. Fishermen work at deep sea and fresh water fishing, using the

latest technologies. The project will facilitate operation of both mechanized and

traditional vessels in all seasons by providing sheltered basin. Hygienic landing

and fish handling facilities, marketing facilities and protection of coast from sea

erosion etc are also envisaged in the project. The project will have a very positive

effect on the socio- economic condition of the region by reducing the cost of

operation of the fishing vessels from the area and increasing number of working

days of the vessels.

The project is treated as framed for a public purpose under the Right to Fair

Compensation and Transparency in Land Acquisition, Rehabilitation and

Resettlement Act, 2013 (30 of 2013) Section 2(1)b(ii). Considering the public

advantage and interest and treating as an inevitable need, the project has to be

implemented.

Page 61: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

16th JAN. 2018] COMMISSIONERATE OF LAND REVENUE 559

ERNAKULAM DISTRICTt^mdw \º¿ 4

[N´w 11 (3) ImWpI]

hn⁄m]\w

\º¿ kn7˛135157/2017. 2017 \hw-_¿ 30.

tIcf k¿°m¿ 9˛12-˛2015-˛se 2753-˛mw \º¿ tIcf Akm-[m-cW Kk‰n¬ ]c-ky-s∏-Sp-Ønb 4˛12-˛2015--˛se

k.D (km-[m-c-W) \º¿ 649/2015/d.h hn⁄m-]-\ -{]-Imcw 2013-˛se `qan Gs‰-Sp-°-en¬ \ymb-amb \jvS-]-cn-lm-c-Øn\pw

kpXm-cy-Xbv°pw ]p\-c-[n-hm-k-Øn\pw ]p\x-ÿm-]\Øn-\p-ap≈ Ah-Imi BIv‰v (2013˛se tI{μ BIv‰v, 30) {]Im-c-ap≈

If-IvS-dpsS Npa-X-e-Iƒ \n¿Δ-ln-°p-hm≥ Fd-Wm-Ip-fw IS-h{¥ Pn.kn.-Un.F. s]m∂pw-hne kvs]jy¬ Xl-io¬Zmsc

\nb-an-®n-cn-°p-∂Xn-\mepw;

CtXm-sSm-∏-ap≈ ]´n-I-bn¬ hnh-cn-®n-´p≈ `qan Hcp s]mXp Bh-iy-Øn-\v, sN√m\w ^njnwKv lm¿_-dn-s‚bpw

A\p-_‘ tdmUp-I-fp-sSbpw \n¿Ωm-W-Øn-\p-th≠n Bh-iy-ap-s≠-t∂m, Bh-iy-ap-≠m-tb-°m-sa-t∂m, Pn√m If-IvS¿°v

t_m[y-am-Ip-∂-Xn-\mepw;

2013 -˛se `qan Gs‰-Sp -°-en¬ \ymb-amb \jvS -]-cn -lm-c -Øn\pw kpXm-cy -Xbv°pw ]p\-c -[n -hm -k-Øn\pw

]p\x-ÿm-]\Øn-\p-ap≈ Ah-Imi BIv‰v (2013˛se tI{μ BIv‰v, 30) 4˛mw hIp∏v (1)-˛mw D]-h-Ip-∏nse hyh-ÿ-Iƒ°v

A-\p-kr-X-am-bn, Pn√m If-IvS¿ Xmsg ]´n-I-bn¬ ]d-bp∂ ÿeØv Hcp kmaqly {]Xym-LmX hne-bn-cp-ج ]T\w

\S-Øp-∂-Xn\v Xocp-am-\n-®n-cn-°p-∂-Xn-\m¬;

Ct∏mƒ, X≥aqew Pn√m-Xe kmaqly {]Xym-LmX hne-bn-cp-ج bqWn-‰mb cmP-Kncn tImtfPv Hm^v tkmjy¬

kb≥kv, cmP-Kncn ]n. H., If-a-t»cn F∂ ÿm]-\sØ \nbaw A\-pim-kn-°p∂ coXn-bn-ep≈ kmaqly {]Xym-LmX ]T\w

\S-Øp-∂-Xn\pw kmaqly {]Xym-LmX \n¿Δ-lW ]≤Xn Xøm-dm-°p-∂-Xn\pw Npa-X-e-s∏-Sp-Øn-bn-cn-°p-∂p. Cu {]{Inb c≠v

amk-Øn-\Iw ]q¿Ønbmt°≠XmWv. Hcp Imc-W-h-imepw Bdp amk-Øn¬ IqSp-hm≥ ]mSp-≈-X-√.

]´nI

Pn√-—F-d-Wm-Ipfw. Xmeq°v—sIm®n.

hnt√Pvv—sN√m-\w. tªm°v—15.

(G-I-tZi hnkvXo¿ÆamWv \¬In-bn-cn-°p-∂-Xv.)

{Ia dok¿sΔ \º¿ hnh-cWw hnkvXo¿Æw

\º¿ sl-IvS-dn¬

1 443/1 ]pc-bnSw 0.0344

2 446/3, 446/6, 446/7, 446/17 ]pc-bnSw 0.0869

446/21

3 447/1, 447/5, 447/14, 447/15 ]pc-bnSw 0.6534

4 448/1, 448/7, 448/9, 448/13 ]pc-bnSw 0.1538

448/14, 448/15, 448/17

5 449/2, 449/3, 449/4, 449/5 ]pc-bnSw 0.2886

449/6, 449/7, 449/10, 449/11,

449/12

6 450/3, 450/4, 450/5, 450/16 ]pc-bnSw 0.0854

7 451/28, 451/10, 451/13, 451/9 ]pc-bnSw 0.1527

BsI 1.4552

If-IvStd‰v, (H-∏v)

Fd-Wm-Ip-fw. Pn√m If-IvS¿.

Gaz. No. 3/2018/DTP (CLR). 97

Page 62: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

16th JAN. 2018] COMMISSIONERATE OF LAND REVENUE 560

FORM NO. 4

[See Rule 11 (3)]

NOTIFICATION

NO. C7-135157/2017. 30th November 2017.

WHEREAS, the Government of Kerala have in Notification No. 649/2015/Rev. dated 9-12-2015 appointed theSpecial Tahsildar (L. A) GCDA, Kadavanthara, Ernakulam to perform the functions of a Collector for the purpose of landacquisition under the Right to Fair compensation and Transparency in Land Acquisition Rehabilitation and ResettlementAct 2013.

WHEREAS, it appears to the Government of Kerala that the said land specfied in the schedule below is needed orlikely to be needed for a public purpose to which for Chellanam Fishing Harbour.

AND WHEREAS, in exercise of the powers conferred in sub-section (1) of section 4 of the Right to FairCompensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Central Act 30 of 2013),Government of Kerala have decided to conduct a Social Impact Assessment in the area specified in theschedule below.

NOW, THEREFORE, sanction is accorded to the District Level Social Impact Assessment Unit, Rajagiri College ofSocial Sciences, Rajagiri P. O., Kalamassery, Ernakularn District to conduct a Social Impact Assessment Study and toprepare a Social Impact Management Plan as provided in the Act, the process shall be completed within a period of twomonths, not exceeding six months in any case.

SCHEDULE

District—Ernakulam. Taluk—Kochi.Village—Chellanam. Block—15.

(The extent given is approximate)

Sl. Resurvey No./ Description ExtentNo. Sub Division No. H. Are. Sq.m

1 443/1 Dry Land 0.0344

2 446/3, 446/6, 446/7, 446/17 Dry Land 0.0869446/21

3 447/1, 447/5, 447/14, 447/15 Dry Land 0.6534

4 448/1, 448/7, 448/9, 448/13 Dry Land 0.1538448/14, 448/15, 448/17

5 449/2, 449/3, 449/4, 449/5 Dry Land 0.2886449/6, 449/7, 449/10, 449/11,

449/12

6 450/3, 450/4, 450/5, 450/16 Dry Land 0.0854

7 451/28, 451/10, 451/13, 451/9 Dry Land 0.1527

Total 1.4552

Collectorate, (Sd.)Ernakulam. District Collector.

98

Page 63: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

-el5o 11 (3) 6c6na6cnjl 7 - .136430/17

6,p&cog; of)o6rD96:eo

oflcoroil : 30111117

c6.uC crudec d Ogtl2tZOlS aer Z75})" cnc*a G6.oC oom:cocoem .,crudlci

orcdcruJool€(ooico 04t12t2015 os cru. g(cruc(I)c(a6m ) mcrudM9/2015/ocr.r ,

oiieeeroc"lmqacoo 2013 o6! 6a1 "6oggaejld (r)trc(o)oc(oi cn",q.,..nil.,ocororoilcroo,s: ,,

cnJoc.dlogooJm.dUJlC!ccru@rolCraooJCD:Cruoc.Jcnoru5lcoqggcoo&cCrocas(2013oo

cag <a,ggl 30) @ec.dqEg 6e€qos 4o(o)ereua cn1c6q.,r!laoco6 ooo6rDc&Eo

esclJ(ro el m, oJ.jl "6 oolccnoooilet om;"u5ctf, co",om:1<if,ncoo cr5lcoraildelacmro5lcncqo,

:

pcctcoscclqEg ":$acojl<ri ollorcldggg 6oil a<ta o".tcg orgcrLto5rooilml o ^rgccoo ,

"d.,9il"si oocrieruc5loc$qo Grdcro6DrfitD coco{eeosc1o crjlr8oocemorojlcrocoerrii

crooJcoJqo5lBccrDc, Groor.rdjq6rBcc(o)6)cooecmc, eilgc eE€66)'c6tllccu5aca,cmo5icncqo,

Cooco" mcrud 4

2u13 5)s €al 94ogqa:ejlatr cDlcco)actor co"E"r<t5l.,i:cororo5lcroo mJcocolcoqoi|5)er

oJcDGoicrrCcnJcdrorcrdo oJfi):ffuoc.Lrcn<oro5lcroqgg GrooJes(o God (2013 oer c6((R Gr6d30)

4-3" o:a.$ (1)-c" g",Loa,qjloo o{ocruoaua6aocrgroaccoil, *iled. 6E€d crc6)e

pc.ScuE, roodqeto digcroeL crucQool @(olcc€lc(D ojleLojl<ororonfl q6firgcq

ocecrjlcd caccae- ac"n- cmlc"ulrifl m;orcrEm.ll rdcsurcl .,.11. a, agac€ol .Ocm

(TuocormoGrD crjlcora" rsEcocrdccn 6cm rt5loilcoilqgg crucBootr @coJco€Jc(o o.ro(Do

cnsqspcmoilcroo cruogool @(Dlcoerc(o crilrEq.oem .r.uaooil roqrcocacmoilcroo

4oar,e.ro.gqoroilojlcilecno. Pc @@lco oena' occru<oojlcnao .gdoroilcotccaeneroceml 53ais

ecao6rDclsacqo crgq ocmtoro5lafl ggcrrccrd otcEEE(ofl.

Page 64: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

.Ir$&

(ocE6)- - o6c4il

c6Bcdo- - 15

.dlg - "Ooemca,g"

oicgeo" - ooJflccDo

t96<a<ur!.

_ cqca'

.r 9<nr6 ,,'| 15 i,rQll+o, I

15

4 {E 44811i;, 448t7, 44A9, 448113,

448114, 448115, 44811? r:.

1tr olCd(Q)lSo.

6 iE

7 1E 0.1527

EQrE (ogd a1)

:2 oJrOQ)So 0:0869r.. lj -:

' "'t t.,Jotoils" '

44914,449/5,

@6rC@o

Page 65: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

FOtuVINO.4See Rule 11 (3)

ct -t351571t7 Collectorate, ErnakulamDated: 30llllL7

WTIEREAS, the Govemment

No.649l20i5lRev, dated O9IIZ/2015 appointed the Special Tahsildar

AND WHEREAS, in exercise of the powers conferred in sub-section (1) of

Section 4 c,f the Right to Fair Compen-sation and Trillsparency in Land

Acquisition Rehabilitation and Resettlement Act 2013 (Central Act 30 of 2013),

Gov'ernment of Kerala have decided to conduct a Social Impact Assessment in

the area speeified inthe schedule below.

NOW, TIGREFORE, sanction is accorded to

Impact Assessment Unit, Rajagiri Coilege of Social

Kalamassery, Ernakulam District to conduct a Social '

and to prepare a.Social Impact Management Plan as

the District Level Social

Sciences, Ragagiri P. O,

Impact Assessment Study

provided in the Act, the.

process shall be completed within a period of two months, not exceeding six

months in any case.

Page 66: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

TALIIK : KOCHI

SCHEDULE

DISTRICT : ERNAKLILAM

.'ViLLAGE : C}IELLANAM

) '....

-1 1:1':

' a,l:- .1,: I

, '].i i''. 1:1.'

a-::

4

5: 15 .' 0,2886

..'

6 .. 15

7

. Total

Page 67: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing
Page 68: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing
Page 69: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

1

ØÞÎâÙc dÉÄc¸ÞÄ ÕßÜÏßøáJWåÉÀÈJßÈáçÕIßÏáU ØÞÎâÙc ØÞOJßµ ØVçÕî

®ùÃÞµá{¢ ¼ßÜïÏßæÜ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßÏíAáçÕIß ÍâÎß ¯æx¿áAW

ØÞÎâÙc dÉÄc¸ÞÄ ÕßÜÏßøáJWåÉÀÈJßÈáçÕIßÏáU ØÞÎâÙc ØÞOJßµ ØVçÕî

®ùÃÞµá{¢ ¼ßÜïÏßæÜ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßÏíAáçÕIß ÍâÎß ¯æx¿áAW

SIA ØâºÈ ÈOV

¥ÍßÎᶢ È¿JßÏ ÕcµñßÏáæ¿ çÉøí

ØVæÕî È¿JßÏ ÄàÏÄß

ØâMVèÕØùáæ¿ çÉøí

ÕßÕøBZ µOcâGùßW çø¶æM¿áJßÏ ÕcµñßÏáæ¿ çÉøí

ÕßÕøBZ µOcâGùßW çø¶æM¿áJßÏ ÄàÏÄß

ÕßÕøBZ ÕßÖµÜÈ¢ æºÏñ ÕcµñßÏáæ¿ çÉøá¢

ÄàÏÄßÏá¢

Q.1 ÄßøߺîùßÏWå È·ø¢/ÉGâ

dÉçÆÖ¢/ØíÅÜ¢ ÁßÕß×X/ÕÞVÁí ÈOV

ÕØñáÕßæa ÕßÕøBZ

Q. 2 ÕØñáÕßæa Äø¢

ÄáùTÞÏ ÍâÎßå ÈßÜ¢ ÈßÜ¢ÈßµJí ÉáøÏß¿¢ 3

Q.3 ÕØñáÕßæa ©ÉçÏÞ·¢ ÄáùTÞÏ ÍâÎß ÎÄíØcÌtÈ ¥ÈáÌt

dÉÕVJÈBZ

ÄÞÎØJßÈí

µºîÕ¿JßÈí ÎxáUÕ (ÕcµñÎÞAáµ)

Q.4 ÕßÜÞØ¢

ÕßÕøÆÞÄÞÕßæa çÉøí ¦¸ÞÄÌÞÇßÄÈÞÏ ÕcµñßÏáæ¿ çÉøí

¦¸ÞÄÌÞÇßÄ ÕØñáÕßæa ÕßÜÞØ¢ (ÉßX çµÞÁí

©ZMæ¿) ÄÉÞW ÕßÜÞØ¢ (ÉßX çµÞÁí ©ZMæ¿))

Page 70: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

2

ØÞÎâÙc dÉÄc¸ÞÄ ÕßÜÏßøáJWåÉÀÈJßÈáçÕIßÏáU ØÞÎâÙc ØÞOJßµ ØVçÕî

®ùÃÞµá{¢ ¼ßÜïÏßæÜ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßÏíAáçÕIß ÍâÎß ¯æx¿áAW

Q.5 ÌtæM¿áÕÞÈáU çËÞY ÈOV

Q.6 ¦ÇÞøJßW çø¶æM¿áJßÏßGáU ©¿ÎÏáæ¿

çÉøí (¦ÇÞøJßÜáU ®ÜïÞ ¥¢·B{áæ¿Ïá¢

çÉæøÝáÄáµ)

ÕØñá èµÕÖÎÞÏ ÄàÏÄß (¯µçÆÖ µÞÜÏ{Õí)

µÝßE 3 ÕV×AÞÜÎÞÏí ÕØñáÕßçzW

È¿JßÏßGáU ÕcÕÙÞøB{áæ¿ ÕßÕøBZåå

Q. 7 ÕØñá èµÕÖÎÞÏßøßAáKÄí a) ÉøOøÞ·ÄÎÞÏí b) ÕßÜÏíAí ÕÞBßÏÄí

c) µ¿KáµÏùßÏÄí ÕÞ¿µ/ÉÃÏ¢

Q. 8 ØíÅÜJßæa ÕßÕøBZ

a) ØVæÕî ÈOV

b) ¦æµ ÕcÞÉñß

c) ¦¸ÞÄÌÞÇßÄÎÞµáK ÍÞ·Jßæa ¥{Õí

Q. 9 ¦¸ÞÄJßæa ÕcÞÉñß : ÉâVHÎÞÏᢠÍÞ·ßµÎÞÏá¢

Q. 10 ÄÞCZ dÉçÆÖJí ÈßKᢠÎÞxæM¿áçÎÞ : ¥æÄååå §Üï

Q. 11 ÎÄ¢ :å Ùßwáå Îá ÎáØïࢠåå dµßØñcX åå ÎxáUÕ

(ÕcµñÎÞAáµ)

Q. 12 ØÞÎâÙcÕßÍÞ·¢:å ÉGßµ¼ÞÄß åå ÉGßµÕV·¢ååÎxí

ÉßçKÞAÕßÍÞ·¢ åå ÎxáUÕ (ÕcµñÎÞAáµ)

Q. 13 ÄÞCZAí çù×XµÞVÁí ©çIÞ : ©Ií §Üï µÞVÁí ÈOV:……………

Q. 14 çù×XµÞVÁßæa Äø¢: æÕU ÈàÜ ÉßCíå ÎEå ÌÞǵÎÜï

Q. 15 µá¿á¢Ì Ø¢ÕßÇÞÈ¢ : µâGáµá¿á¢Ì¢ ¥Ãáµá¿á¢Ì¢ ¯µÕcµñß

Q. 16 µá¿á¢ÌÞ¢·B{áæ¿ ÕßÕøBZ

dµÎ

È

OV

çÉø¡ µá¿á¢Ì

ÈÞÅÈáÎ

ÞÏáU

Ìt¢

dÉÞÏ¢ Üߢ·¢ èÕÕÞ

Ùßµ

¥ÕØí

Å

ÕßÆcÞÍcÞØ¢ ç¼ÞÜß ÎÞØÕ

øáÎÞÈ¢

å

ØíÅÞÏßÏÞÏ

¥Øá¶BZ

ÉÀÈ¢

ÉâVJßÏÞ

ÏÄí

ÉÀÈ¢

Äá¿øá

KÄí

å

Page 71: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

3

ØÞÎâÙc dÉÄc¸ÞÄ ÕßÜÏßøáJWåÉÀÈJßÈáçÕIßÏáU ØÞÎâÙc ØÞOJßµ ØVçÕî

®ùÃÞµá{¢ ¼ßÜïÏßæÜ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßÏíAáçÕIß ÍâÎß ¯æx¿áAW

Q.17 µá¿á¢ÌJßæa ÎÞØÕøáÎÞÈ¢…………. Q.18 µá¿á¢ÌJßæa ²øá ÎÞØæJ æºÜÕí:……………

Q.19 dÉÞÏÉâVJßÏÞÏ ÕøáÎÞÈÆÞÄÞA{áæ¿ ®H¢……. Q.20 ¦dÖßÄøáæ¿ ®H¢………

Q.21 dÉÇÞÈ ÕøáÎÞÈÎÞVP¢………………………..

Q.22 µá¿á¢ÌJßæa dÉÇÞÈÕøáÎÞÈÎÞV·¢ ¦¸ÞÄÌÞÇßÄÎÞµáKáçIÞ ? ©Ií §Üï

Q.23 ÎÄíØcÌtÈ¢ ¦¸ÞÄÌÞÇßÄÎÞµáçÎÞå妵ᢠåååå §Üï

Q.24 ÌÞÇßÄÎÞµáæÎCßW ¯Äá ÕßÇJßW ®Kí ÕcµñÎÞAáµ :

Q.25 ÈßVgß×í¿ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßæÏAáùߺîí ÄÞCZAí ¥ùßÕáçIÞ: ©Ií §Üï

Q.26 ©æICßW, ®Õßæ¿ÈßKí ÕßÕø¢ ÜÍߺîá

ÉdÄÎÞÇc΢ §æaVæÈxí/ØÞÎâÙc

ÎÞÇc΢

ÆâøÆVÖX

æÉÞÄá¼ÈBZ Îáµ{ßW ÉùEæÄÜïÞ¢ ÎxáUÕ (ÕcµñÎÞAáµ)

Q.27 ÉiÄßæÏAáùߺîáU ¥ÍßdÉÞÏ¢:………………………………………………………………..

Q.28 ¨ ÉiÄß ÎâÜ¢ ÄÞC{áæ¿ ÕøáÎÞÈ¢ ÕVißAáæÎKí ÄÞCZAí ¥ÍßdÉÞÏÎáçIÞ:………………………

Q.29 ÍâÎß ¯æx¿áAáKÄßæÈAáùߺîáU ¥ÍßdÉÞÏBZ :………………………………………………….

Q.30 ¦¸ÞÄÌÞÇßÄÎÞµáK ÎøB{áæ¿Ïᢠ©ÉçÏÞ·çÏÞ·cÎÞÏ ÕØñáA{áæ¿ÏᢠÕßÕøBZ

çÉøíåå å®H¢

Q.31 µâ¿áÄW ÕßÕøBZ ©æICßW......

Page 72: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

4

ØÞÎâÙc dÉÄc¸ÞÄ ÕßÜÏßøáJWåÉÀÈJßÈáçÕIßÏáU ØÞÎâÙc ØÞOJßµ ØVçÕî

®ùÃÞµá{¢ ¼ßÜïÏßæÜ æºÜïÞÈ¢ Ëß×ßBí ÙÞVÌV ÉiÄßÏíAáçÕIß ÍâÎß ¯æx¿áAW

Page 73: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

1

SIA – Chellanam Fishing Harbour (SIA Unit, Rajagiri College of Social Sciences , Kalamassery)

Socio Economic Survey for Social Impact Assessment Study Land Acquisition for Construction of Chellanam Fishing Harbour, Ernakulam District

SIA Ref No

Interviewer’s Name

Survey Date

Supervisor’s Name

Data Entry Staff’ Name

Data Entered Date

Data verified by, and Date

Name of the respondent_________________________________ Name of the Affected Family (Head)________________________ Owner Tenant

ASSET DETAILS

Q. 2 Type of property a) Dry land b) Nilam Nikathu Purayidam

c) Nilam d) Others Specify___________

Q.3 Type of use a) Open Land b) Fishing allied activities

c) Residential d) Business

e) Others Specify_______

Q.4 Address details

Address of the Affected Property (with pincode) Communication Address (with pincode)

Q.1 Identification

Place/ Location

Ward No.

Name of Panchayath

Page 74: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

2

SIA – Chellanam Fishing Harbour (SIA Unit, Rajagiri College of Social Sciences , Kalamassery)

Q.5 Contact Number:

Q.6Name of title holder/s of the property (specify the names of all the members

specified as per the title deed)

Date of acquiring of the property (approx)

Details of transactions made on the property within the last three years

Q.7 Acquisition by:

a) Hereditary b) Purchase c) Encroached d)Lease/Rent

Q.8 Owned by : Private Government Property Religious

Q. 9 Property Details

a) Survey No__________ b) Total Area owned_________ c) Area of acquisition_________

Q.10 Extent of acquisition: Fully Partially

Q.11 Type of property affected : Land Structure Both

Q.12 Whether you will be displaced: Yes No

Q.13 Religious Group: Hindu Muslim Christian

Other Specify___________

Q.14 Social Group: SC ST OBC General

Others Specify__________

Q.15 Ration Card Yes No Ration Card Number_____________

Q.16 Type of Ration Card : White Blue Pink Yellow

Not Applicable

Q.17 Family Pattern Joint Nuclear Individual

Page 75: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

3

SIA – Chellanam Fishing Harbour (SIA Unit, Rajagiri College of Social Sciences , Kalamassery)

Q.18 FAMILY MEMBERS - DETAILS

Sl. No

Name

Rel

atio

nsh

ip w

ith

th

e H

ead

of

the

fam

ily

Age Sex Marital Status

Education

Job Monthly

Income

Chronic Illness/ Disabled

Remarks*

Co

mp

lete

d

Continuin

g

*Kindly mention dependent/ independent widows, disabled persons or any other vulnerable persons in the affected families

Page 76: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

4

SIA – Chellanam Fishing Harbour (SIA Unit, Rajagiri College of Social Sciences , Kalamassery)

Q.19 Family Monthly Income_______________ Q.20 Family Monthly Expenditure_____________ Q.21 No of adult earning members___________ Q.22 No of dependents _____________________ Q.23 Major Source of Income ______________ Q.24 Livelihood (Major Source of Income) of Family Affected Yes No

Q.25 Whether fishing or allied activities are affected Yes No

Q.26 If Yes, Mention adverse impacts_____________ _____________________________________

Q.27.Are you aware of the proposed Chellanam Fishing Harbour project ?

Yes No

Q.28 If yes, source of information Newspaper Internet/social media

TV/ Media Community members

All of the above Others Specify______

Q.29 Opinion about the project _________________________________________________________

___________________________________________________________________________________

Q.30 Do you think that the project will benefit for your income earning activities________________

___________________________________________________________________________________

Q.31 Views regarding acquisition of land__________________________________________________

___________________________________________________________________________________

Q.32 Additional Information, If any______________________________________________________

___________________________________________________________________________________

Page 77: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

(DOgJOllGOBoMo

C a D O O o a x n j ( 5 5 - a J § o 1 4 ( 1 ) d f e O S T T ^ d k

c ( D 0 § 1 c r u >

<5fl(D)(5)>. 2 7 .0 2 .2 0 1 8

- 4 ) 0 € m o a j ^ g o S 2 l§ jo 0< 0 > O n jl (5)OQJ2<0O Q a J ^ j o c n o a i l o ^ j s S a J o l t u l a v k o S

f D C ( 5 ) O O S O a j o G a _ l(3 (5 T 5 )l§ 2 |B g a J § l< 0 ,(Q ) l(5 3 O i l O J S j B B (5 )2 0 .0 (0 ) A 0 J

6>aJO (5)2 « n 3 )O J( /o ^ (5 i5 ) l( i)2 (5 i3(5)o< D )(5) 6 ) - a J ^ |o c n o a o l o a i l o c n a D O ( 3 6 n j o l 0 a $ ( o > 2 o

7 » o n ^ 6 n j(T \jD G o o c u t y e ^ a s o a ^ o o )1(30O6TT)(5T5)1o ) g q j 6 tt§1 ( s i ^ o i a o ^ f l e r r i G c r n o

t o i a j a o ^ 6113 0 G ( a < d € ) 0 6 )2 1 (2 0 7 ) 0 <a>o f i n n a n a n j o ( m ^ ( D ) ( 5 ) l ( i ) 2 G a j 6 r i § l fS ]® !

T # f l ( } S 2 < 0 O e j l ( 5 3 CD^0Cn)(23 0CX2) O ) a 9 d S a J 0 l a n O 0 ( 5 T 5 ) l a ) 2 o 0 \> 2 (5 )0 0 ^ 0 ) CQ><8€)lo

^ ^ n o c u T o j o c r o m n c n ^ o a j j c n g c n j tD O a jc r x m g i lo n j f f l jS Q (3 i3O i< 0 ,o (/D a r r a y s ( 2 0 1 3 q g j

3 0 ) 4 - D o O J<0>2aj 1 -D o g a J O J ^ a J ( a J < 0 » O 0 0 2 g g a jlS 2 6 1 5 )O a J (T )o 3 /2 0 1 8 0 ) 0 1 1 c5 (313)00)1

C < 0 > 0 g ( 3 1 3 0 1 )0 0 )0 (0 6 1 0 0 )0 0 (^ 1 (0 3 1 6 .0 1 .2 0 1 8 (3 5 ( f ^ O O la ( j l< 0 > 0 l^ 1 S ) B B ( 5 ) O 6 n ) . O O O ffl^nD ^

. ^ ( o ^ o ^ e j o c a ) o )1(36t i)(d > n j o c o a n o i l c n ^ g g o l c a p ( 3 § a j x g p o o <0 0 2 0 1 )(5)1( D ] c a j 6 m l

0 0 6 ) 9 ( f v j c n 5 a j ) 0 ( u l^ j (§2<2)1oq>1(5 3 ( 5 i3 Q j< 0 > o a 5 2 n a B < ^ j ) ^ jo o i ^ c o a j f l c © , ^ 2 0 1 8 ® 0 ( 3 a j

1 7 (0 1 1 ,0 6 1 7 )1 .0 0 ( 1 0 0 ( 0 1 0 ) 0 .a J ^ jO ( T > o 0 O V a J C 8 2 O ( 3 S 2 a ^ ) ( 0 3 a i l ( 1 0 ( 0 , ^ 1 ( 5 5 0 0 1 ^

( 1 ) S (010)^(10 aJ6T Jjl< e> a O l ( D ) O lo 0 )1 (5 3 a O 3 8 2 0 O C < 0 ,6 1 1 5 ( 5 ) 0 0 6 1 7 ) 0 0 © ( 5 ) 1 ( 1 ) 0 ( 5 3

3 O O l< a f la f l0 < 6 > O f lB K T P l.

1(1 )0 .

( 1 0 ( 3 0 ( 0

(O o

ailcT jfflff lm o a ^ « 0 ,G G ( /O o

a n o j o j a o ^

S B (5)ffl1

0 n O < 0 ,S ( 3

( r o i n e j g s 2 i « 0 , ( / 3 /

(O )(O 3 a J0 < 0 ,< 0 A jl(0 ,B j6 )S G a J 0

,

..4 4 3 /1 a J^ O G D lS o 0 .0 3 4 4 0 0 (5 ) < 00} § 0 1 5 ) 1 ( 5 3 C S 2 0 ( 3 S 2

0 0 1 )0 1 ^ (3

| 2 4 4 6 / 3 ,

4 4 6 /1 7

a J JO G D lS o 0 . 0 0 0 3 ,0 0 0 3 n jl© ,](0 T 5 )O G d \ ) 01^(5

( a i j o a S o u k ^ u

I I 3 4 4 6 / 6 a j p a u l s o 0 .0 7 3 5 < 0 , 0 2 0 0 0 612110 l ( 0 T a ( 6 D ja D 0 o

0<0> o i l

j 4 4 4 6 / 7 nJJO C Q llS o 0 . 0 0 4 8 © 7 ) 0 G ( ^ 0 l ( 5 3 G E 3 D ( T U a j5

a J G ( ( a ) 0 ( r o

5 4 4 6 /2 1 nJ](OCDJlSo 0 . 0 0 8 0 © 7 0 0 0 ( ^ 0 1 ( 5 3 a j ( 3 c o ° l ( n 5

a J G ( f l ) 0 d \ )

6 4 4 7 /1 rJ^O C Q JlSo 0 .5 6 6 6 © 7 0 0 C ( $ (O l (0 3 O J (3 0 )1 (TO

C ( r o a j ^ ( 3

7 4 4 7 / 5 a J^ O G lJ lS o 0 .0 1 0 4 <0,201 OOl 80 ,(53 C S 2 0 d O a £ ) 0 ( 0 ,

0 8 2

8 4 4 7 /1 4 aJJQ O Q jJSo 0 . 0 0 9 4 < 0 > G 6 )1 3 < 0 0 O S a JO (lu l(5 3 2)G (T )0

a f > r a o 3 0 o s 2 o 8

9 4 4 7 /1 5 rU J0 (D )lS o 0 .0 6 7 4 © 7 0 0 C ( $ 0 l <53 0 0 (3 § 1 0r3

0 o j o 1cq)O(t3

L 4 4 8 /1 nJ](OQQ)lSo 0 .0 5 6 0 © 7 O 0 C ( ^ } 0 l ( 5 3 ( G O J ( p

G S 2 0 (3 S 2 < 3 1 3 G (U )0 ( /3 a O d U

( n ^ e i l d D o m ) a j < 0 0 ^ j ( i 3 )

n 4 4 8 / 7 n J p Q D ilS o 0 .0 1 9 8 ( a r o ) e j ] o o j o c m l ( o 3 ( r u l ( o 3 o j

O 0 $ ( 3 (0T0)6T0U G Q J0(ro

1 124 4 8 / 9 a J ] 0 ( D ) lS o 0 .0 0 8 4 O 0 0 o j § l « 0 0 ( o 3 ( o e j o ) 0 0 0 ) 0 3

i0)(T9d6rD (r3

1 13 4 4 8 /1 3 nJ^O Q D llSo 0 .0 1 9 8 0 n J^ O (T )o < 0 ,0 C Q )l(O 3 (0)000)1 (03

c c / ) 0 a j o e i o 3 c a j e j j

1 14 4 4 8 /1 4 aJ^O Q Q flSo 0 .0 2 2 6 2 ) © 0 ( U § l< 0 0 ( o 3 ( o e i g ) o i l e j

(W o J Io n la jo a rD a S &

a o a e a u o j o l a o o 0 O ( D ) 6 m a 3

I 154 4 8 / 1 5 ,

4 4 8 /1 7

a ^ O C O flS o 0 .0 1 8 3 ,

0 .0 0 8 9

0 aJG JO (l)o 2 )jO lC Q n (O 3 0 a J O B B

(0)1(53 G d \ ) O i y 3 (013)0^611)1

16 4 4 9 / 2 <ul)fflOQ>1So 0 .0 4 3 6 o c 0 o § l c 0 0 ( o 3 ( r x x a f l ( /o a 3 <0 , 0 2

6TT)O«0j 0 ( i3

L l 7 4 4 9 / 3 ,

4 4 9 / 4 ,

4 4 9 / 7

aJ^© Q Q )lSo 0 .0 6 2 7 ( f v j ( n 5 1 ( U ) a J / 0 ( r u ( ^ ,§ d 1 ,

0 ( 5 n o ^ 0 ( 5 ) o « i 1 e j o g l

(TV) a O < 0 ,0 0 7 0 (TV)on G Jo

! ' 18 4 4 9 / 5 oJ]O C Q )lS o 0 .0 3 9 5 a i e j l ( D ) a f l § l ( o 3

6 D JD G J<0)0^1617)( l3 CUl (013) (3

a f l a e i e j < 0 0 j2 ) 6 m ( i3

< 0 ,2 g (O io )](3 a JI§ l(o 3 ,

a jls 3 < a > e j< 0 i9 d a ) l (1 x3^ 0 (0 3 a 3 ,

a J i l S a j l O r i j l B B l

1 194 4 9 / 6 aJ£O Q Q )lSo 0 .0 1 4 8 0 ( O ) ( i ) a j l e j o ( i u ( 5 i a ) l ( o 3

(0 ,^ § lnJD O ^< 0>^§l G O )( 3 ) ^ 0 0 2 2 )

II 20 4 4 9 / 7 - 2 oJ^O O D ilSo 0 .0 3 1 0 n jl© ,](5 T 0 )O o_TlC^(3

G S D 6 n 3 ( i \ ) 6 r i3

j 21 4 4 9 /1 0 n J^ O G D lS o 0 .0 3 1 4 0 a J D g g C Q ) l(O 3 r J I (^ (3

G ( l \ ) D g 2 K l3

0 a J D B B (D n (O 3 G fflO (rO (JO

^ 1 9 (n 3

0 a J 3 B B G D l( O 3 ( a g o a 3 ( r u l ( l \ )

a i l 6 i u l

m a d h y a m a m .c o m

\

© "ffiJco ja io2018 aortic 3 • mm)

- —----a _m

i

2 2 4 4 9 / n *aJ^0Q O )lSo 0 .0 3 9 1 (& )< g /l(0 3 G ( 5 ) O 0 ( T U ( 5 0 0 ^

O j1 G 0 0611)1 a 0 . a^)«£b (T 0

23 4 4 9 / 1 2 a J ]0 C Q )lS o 0 .0 2 6 5 0 a JO B B C Q )l(5 3 a f l ^ ( 3

G (T O O g 2 )(l3

24 4 5 0 / 3 a J ] 0 ( D ) lS o 0 .0 0 2 3 2 ) ^ 6 r t 5 o c a j e j l ( a 3 (i d ^ od I ot)

C 8 J 0 C rU a D «0>J615U2

2 5 4 5 0 / 4 a J ] 0 ( D ) lS o 0 .0 0 6 0 a ,^ 0 lc /o ^ © ,( g 3 c & o a r o a D

fl<0> a i l ,

< 0 ,^ 0 1 (0 2 © > (O 3 013 ) ( ^ 617)1

a j ( 3 ( ^ l a i 5

x1

2 6 4 5 0 / 5 a J ]0 (X D lS o 0 .0 3 8 6 O j l 0 C 2 2 ) (53 C 82 0 (T U l

G S 2 0 ( n ) a D ,

a i lO G 2 2 ) ( 5 3 f l 7 ) G ( l \ ) a J a i l 0 8 2

a j lO G 2 2 K 5 3 G 0 0 l a ^ l s i l r

27 4 5 0 /1 6 a J ] 0 G r l S o 0 . 2 6 2 0 0 a J 0 (1) o O l (33)1 (03

a j lO G ® ( 0 3

a d l G e j o a l o ) c ( i\ ) a j^ ( 3 ,

2 ) 0 ( 8 (5T5) © 2 2 ) 0 ( 1 ) 2 0 0 1 ( 5 3 ,

(513)0^617)1 0 0 0 ) 2 0 0 1 ( 5 3

0 8 2 0 0 ) 0 0 6 0 3

I

V

28 4 5 1 /2 8 aJ^0C Q )1S o 0.1215 0 a J ^ jO C 1 ) o 0 2 ^ 1 ® ! ^

0 0 0 O J § 1 < 0 0 ( 5 3

0 0 0 1 (5 )1 0 0 0 ) 0 1 0 3

0 a J § j O ( T ) o 0201(0)1(53

0 0 0 O 1 § l4 0 6 K 5 3

(/5O O 5)<0,20O (31 0 0 0 X 1 1 0 3

f l a J ^ j O O l o 0201(0)1(53

0 0 0 O J § 1 < 0 6 X 5 3

0 0 8 2 B J < 00101 0 0 0 X 7 1 0 3

1

r

ri.

f

>

29 4 5 1 /9 a J^0 (X D lS o 0 .0 1 0 7 0 0 0 o j §1<06X53 a m a u D O A o c n

n @ o ( u i l

11

3 0 4 5 1 /1 0 a jp C D J lS o 0 .0 1 9 5 « 0 » 2 0 l( /5 2 ® > ^

0 ( r u 6 T U O ( r o ^ lo 3 0 0 , ©

r

31 4 5 1 /1 3 aJ^O Q O JlSo 0 .0 0 1 2 a J 2 (5 T 5 )0 3 o ilg l(5 3

«0,2<5^ o 3 ( a j o J l 6 n 3

( f l a p 0 a J C O )(3 a O ( l3 , ( n ) 0 f f l ] a n ^ (a J (5 )^ 0 a ^ J 0 ( 0 ) (l)1(36pQQQ) Q 3 ) ]6 m lg' )

\

Page 78: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

X S l f i t t C D )w ww .deshabhim ani.com /districtnew s • • n e-m ar ^ 2018 (B0(?><J 3 030)1

(S o D O O o (t k t u <3 5 - a J § o 14 ( 1 ) <a>0 6 rr>}<a>

< s c n o § 1 < r o©fl(X2>©>l: 27.02.2018

n^)O€TT>0«a>Jgo S $ l§ p ©<0>0njl © >0£ty0© ©.aJ^JOCPo Q jlG Q jg3 oJ©la51<Xl51(03 aj©2crp©>£>

g D C (0 )0 6 )S 0 ^ Jo G-aJ(3©r<7)lS388 rd§1<0>C0>l©8 Q ila j© l.a jlS j8 8 (9 »g > O O Q > SJCfl B © ^ o a j o o j © i^cpco^ajKrflcp^ ©Td(a>ocQ>©i © .a j^y o c p o a n lro ilo c o aO O (36niol6)C^cn)2o

m o D je t u a ru ) G O oaifye>gj6>soQ $o a5lc3fflo©paj©51cp GOJ6ns1 ® t$ cpc/d ]© j © 6P3G c t p o

a n & )O jao ^6nB O G C D /<o 6)06>tzicanno <e>o©pjcTP©>2o ©T$(D>co>lcp;}Gaj6nsfl e^afl

a $ © $ S 2 < 0 © Q ]l© 3 (DpODIfflOCQ) CP(0 4 S a J ©1 aOOOCOTJ)!CPJo Cr0JGJ)0(0^«5>(D)a6)Jo

n j^po a51ajcKro (aro )1(P jo n J^ g c ro in o o Jc n c a itD T m ^ a ijg g © ©ai«OjOOD (3t9><ebS (2013 © £ li

3 0 ) 4 -O 0 1-Qo g a Ja i«0 >Jo J (tvl<6>CX&g^S8 OjlS36TD)OaJCPo 3/2018 CPCPJC3 (3T9)CD/1 Ga>(9g(3Td(TXXXlXX D6m (/XrV^(Sl6.0l2018(05((y(T^k2l5l<e>(Dl^jl§2gS(0)C>G m . C TP O a^iD ]

(fL j(U )p n e jo ca ) c o l(3 6 n rx n > n jo cp cg ro flcp ^es o t e a j o c S g © > < Q O o o < e © 2 C T P © > lc o 2 G a j6 n 3 l

©>o6)$> Q x j c r o m o a j l ^ j e j a l o o M © © a i < e > ;x © g n 8 S o in o jo a j^ < s (a ) 1 te > § jo 2018 o o c 3 .a j

1700 11 cq6t p 1 <06> cro'PGJKO © a J§ yo c P o © ctpc$ g !»0 (3 8 2 n ^ ) ( o 3 o i l c n o « o > 2 g l© 3 © a jn j(

(PS© T9>]CTP nJC T^jldB* a O lC O > O lo U )l© 3 aD08e© 0G<0i6n3C9)C>© © PC TP g D O llC P O O S

m o l c n ) 1 ^ 6 > « 6 > o g g y m ^

( g > o

CPo.

c n )(3 o a j

CPo

o ila j© © P o

© I ^ O i C © ^

8 8 (g^ffll

©aO»0> S(3

CTULQQJ g>S®<0>(/3/

©>©3rU©<03<00ll<0>63]©S G aJ©

1 443/1 nJ]©QQ>lSo 0.0344 © © © )d 3 © ]§ (9 T9 )l© 3 G 8 2 0 (3 S !

GCTPOJ](3

2 4 4 6 / 3 ,

446/17

oJJ©<B>lSo 0.0003, 0003 £ U l© > ja JK J)0 Gcrocuyfi (og o o 3 c r v ) 1 c ^

3 446/6 ' aJJO<Xl51So 0.0735 <0>ffl^Q)OG6PU©I © T9(6PJaOOo

©<0> o il

4 446/7 nJJCDCQflSo 0.0048 g X D ( 9 G ( ^ © 1 © 3 G SSO C TO fvD

a JG (2 )0 C T0

5 446/21 n j^ o a y ls o 0.0080 g y p © g a g © 1 © 3 a j (3 c o l c ru

aJG (© )0CT0

6 447/1 aJJ©(H51So 0.5666 g y p © g c^g ©1 ©3 o j (3 c o l cro

c c r o a i ^ ;

7 447/5 nJJ©QQ>lSo 0.0104 <e>2© 1c© 1© >© 6 g s s o c t p o C © cO.

© 288 447/14 (yJ2®®51So 0.0094 <O>G6n3<e©0SaJOCTlfl©3 OGCPO

rtO © a3 ©088ci3.• • . .9 447/15 <vlJ<ilOQ!)So 0.0674 g y p © g ($ © 1 © 3 © 0 (3 § 1 a 3

© r u o l o a / o a S

10 446/1 ru jocD Jlso 0.0560 gyp© G <^g© l© 3 (Gel#) g s 3oc3 s T © © G cuooc/3aDcn5

(o$efl(B>0C TP OJc0© £ya3)

11 448/7 rU p C D H S o 0.0198 (3t9)Q JJO f»JO C P jl© 3 c ro l© 8 a i

(T\>$(3 (BT$6T511GQJOCn5

12 448/9 o J^ C ID IS o 0.0084 © © © o j §1<o © © 3 ( g & j£ ) © o© a3

<0>o946rPCl3

13 448/13 oJ]©CD)lSo 0.0198 © ,aje‘JOCPo<e>©QQ51©3 ©>o c q >1©8

( s e i g )

GCOOaJOeJOS G OJGJJ

14 448/14 cvJJdKSDlSo 0.0226 © o © a j§ 1 < o © © 8 ( G e j $ ) qS\qi (c©)lcp1ajocroa3 &

©0GS3C©]©1 CPO©OCQ)6ma3

15 4 4 8 / 1 5 ,

448/17

nJJOOQilSo ’ 0.0183,

0.008S

© n J ^ JO C P o f f lp lO O M Q n J 0 8 8

co>l©3 G c ru a j^ c d © Td>a$6TPl

16 449/2 r*J^©<B)lSo 0.0436 © g © o §1<o © © 3 cro© fl(© a3 «o>©j

6PDOcOj©CT3

17 4 4 9 / 3 ,

4 4 9 / 4 ,

449/7

ajjroco51so 0.0627 (a jc ro 1 c u )o ^ / © c ro (^ § d l,

ffl© ro^© © )o «nejog1

crp aD .a .rosTD aro o^ejo

18 449/5 nJJCDCOSlSo 0.0395 ajejlcD)afl§1(DS

6 n jo e j^ o ^ i6 T P C i3 a i l ©©)(3

a i l a e j e j< 0 ^ © 6 T P a 3

<B>^ajro>2(3aJl§1aj3,

ailS2QDJGj<0ad©1 ctp^g © (0 )0 3 ,

n 4 > S a jlO f y i8 8 l

19 449/6 aJ^OCOflSo 0.0148 © «j>cpajlejocrpcoro)l© 6

<0y2§1oJOO2<fi>2§T GCPOT^OOQG)

20 449/7-2 nJJ(9CD51So 0.0310 nil©>2©T0)O o_flO(3

GK06Tl3CTP6n3

21 449/10 aJJO(D)1So 0.0314 6)nJ088<B>1(P3 r J I^ (3

c c ro o g a a 3

s v \ jo g g c n 5 1 © 3 g o o c t \)C][P

^ ^ * 3 - a a j o g g c D / i G S o ( jx Q o a o c r o ia r o

n i l 6Pil

22 449/ n oJ^OdDlSo 0.0391 ©)<5/1 ©3 G c o o o c r o g o © ]

a jlG © 0 6 TP l nQ). nQ)<&(TG23 449/12 aJJOOlflSo 0.0265 6)tiJ088C Pn© 3 a Jlg (3

Gcroogfflci6

24 450/3 tiJJfflOBtSo 0.0023 © 2 6 r e o G a je J l© 3 c t p j c p I © )

C K O C rO alS

25 450/4 aJJfflOQllSo 0.0060 ce>2©lc©2®>®S GSBOCTDalQ ©<07 a il,

<&>l ©1 <©2 ©3 ©3 OT^i cig a m i

cudk/flaro

26 450/5 aJJOOOltSo 0.0386 a J l 0 G am ©3 G 23 o c t u !

GSJOCTPaO, .

ailo G tzm oS © 'p a c r u a j o Jl © s?

ailOGlZl2)©3 GfflOl r^dlSjl

27 450/16 nJ^©02)lSo

. V ' 5- -

0.2620 6) sU 0 CP 0 (D)1 ©3

n jlO G 2l© 8

a d G e io e flc p G cro a j](3 ,

© 0 (3 © © ) ^ © a o c p ^ G O J c a S ,

(ST9>o^6rr>l a o c p ^ G O id s

© S 8 c m a w i3

28 451/28

- v ■ j % ; *.

ojjoo aJlso 0.1215 © aJ^jO C P o ©20l(S2)l(^

ffl©©aj§1<o©©3

© o q j ©51 fflo axu a S

©ixJ^|0CPo ©]dlcxi51©3

ffi©6>OJ§l«96>©3

c© ocrj)<o >2©o ©1 fflo axu a S

O iiJ^ jO C P o ffl20l(D>l©3

© © © aj§l<o© © 3

© 0S 3£j<O iiial fflo ax u a 3

29 451/9 aJJOKI^ISo 0.0107 ©o©aj§1<os>©3 © p g c © o «o >©(t3 a^)o CU51

30 451/10 aj^ocnJlso 0.0195 <o >2©1c©^©>©3

6K T\)6Pjocru^la3 ©<o j @

31 451/13 o jjo a tfte o 0.0012 ajjfflroxiSaflglraS

<9>j<%ci3 ( j jo i ls n S

( s n j ) 6 )3 jcnx3aoo 3, o r o o a jn r^ (n jo n jo n c jo ® ait(36jg<m co jjs m tg

Page 79: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

aasni i »«jskmt> i

24 (Sal83

? 6.50* * * *

issN-0972-0022 www.manoramaonlme.com

BE-g U l t H i ta | § a 111 a a 1

• * 3 h | 1 *@'i § §*1 i i | §>•~ " f c 2 ® 3 P a § t

3> 3£. 3 & ? f ! ® I n I ?Pl o R ' s

P w ?3

<S §5 O c

t a rl- i , i s I § s ?•. I l 1 1 i , 8,

i l s s i l S I HefsaEifl l tq.fi) b ^ 9> o o - . o ’2f13 y ^-> 9 3 > 3 0 a § 4s a $§ | a § 3c», g 8 3 ao 3 a 3 «<* p 9 is &'3 & i 3 2 5 § 5 3 E | ~ a R a u a ” 3 a a

' Q .1 i 2.1! £ §§4 s m $ ls 3 9 un ^ v" V, y H F.

® 2 ) ** O u Q 9 0 'jJ1 ^ . o S i 2 . £ ® « E . i t s

„ b Il 6 ^a P o , ou& 15 3

& 9& £ 9

5y t )

&S3o o

S3 E "

2.

t (S g gH9 O ',ftv )

a i 3 °JS a i « 3 o a

e t p B =O O i r 1^ f t b

E S. &J8 a 9: o

i l d t S

I a §-

-3 •

I .. ® 8, 9* §V | 9rsgis s

a , 3 c b

5 | I » - g od 3 o 0 0

a§>

& 3 u n . a

9 § > §■ 3; "l <vv o > <* •<*

a ? 3 a I J &)» 00 3 0 0

I j l9 I®1

R | 9§ l . a

r > j>9flv

i w m w

Page 80: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

G a o l ' S c i , 5 g 'g ^i l § l 1 f f f ? ^ ' ! 1 1 §S i l l . ^ <i 111 §J *£&£*

I V f 1 1 ea *==§ « | i ? i § | i l | i § 11 ? § ^ E r l 1 ■a je o I i i § i I<§ ? o ^ a £ ? ” 3 ® iP ? § 5 'S § 'e 5 E

Page 81: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

*

golOOOo o)cnj(3 5aJ§o 14 ( l ) t&06mjc9j

GCD0§1cr0O)°l03)O)1 : /03/2018

r^)06mo<ft.2go s l ^ j o ©c&oajl roioeijceo eiaJ^jocoo a f l c ^ j s r u o la t o lo S ajo^crno^o

6D(BO)06)S0<£]o Q.aJc3oO)1Sj00 oJ§1ca>QQ)1o3 Q]lQ1oIaj)S300O)ji2OO2) S^ffll B O J BnJOCOIJ

o i^ a ic o ^ o o flo ^ ooo>oo3)0) b ^ j ^ oodo rLc1oifl0cr> nDO<36niol6Ki3oQQ)2° orao^enjauu

c o o a o jc a i^s is o a )^ o)1(3tH206rnoo)kr> (saJ6nsfl raidjaiaD^mjBsnBCBaDO oT$aj(05>i226n30(8Q3)c06)06)i2eoT)o

eai06TD]cm«njo oi^oaioflo^cajenifl e^ofl a ^ o s ^ a o e f lo S cd^ oqqjcqocq) o)n9is<^o1rir)oooo)1o>2o

(ru^ro)0(D^(0)cd)c96>^o nj^mrocjulajocrurarancn^o ^ o o s o i i L o o r ^ o o f l c n ^ g g 0 O 0 Jcft>oco or^c& s (20 13

o e i 30) 4 -0 0 a jc a > ^ ,i -o o g o ja iB ^ r y (o-i<ft>3© 0 }§ § oj160)S20o_io ) o 3 / 2 0 18 o>ouc3 0ra>a2)1

j ^ O g (31301)00)00611) CDODOloS 16.01.201803 (aJ01)1(3l)1<fljOl^1Sjfflj 000)0611). ODOO^oO^

. '-1 0 )^ 0 ^ 0 0 ) 0)1(361^03) oJOO) 00)1(1)^00 0 lC o J0 3 § O)(^0O0c06)JOT)O)1O)2CaJ610sn 0)06)(P (pJO^OOilaJ

ei!2loa)1o3 OOOJrfbOCOCDJgg n4)^}3 01i<%1<&>2]<> 2018 (20(3jy 170) 11.00 (26rT)1<9S) 01)0300)

raJ^JOOOo 6)01)030 G£20(3e<! ri^o S .rd l.O V B ^g lo S O J ^ 0 )5 0 0 )^0 1 ) 0161^1(06 rir>l03)OloCDlo3

n_00®00(Bca.6T1BO)06)6mOT) @30)1(1)003 OOOlO3)Tajj6)ca>O00jOT)j.

Sd/-6>3j(DC3(Z>0Cl3

crooaijao (pjanpneKxro cnla^cm orojoTilg

\

Page 82: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Public Hearing - Social Impact Assessment

LAND A CQ U ISITIO N FOR CHELLANAM FISH IN G HARBO UR C O N STR U C TIO N P R O JE C T

/enue: St. George LP School, S.ChellanamDate: 17/03/2018 Time: 11.00 a.m

Participants List

51 No Name & Address Contact Number Signature

/•

* t r ' /K \y^ 3 9 X 0 6 r g $ r o _ y g -

3 . ) I l rfDv><- (; Wv[/cvw->. ^ = 4S~-

?>•0(<J U_A C f

VCPl , ^Ov\V\ Ci VvtjeA ,

I ^ 7 2.1

'

k)--------------------------/

X ^ V U J \ ,

C_3U/ nVLa a V^v<a^ i

( l A l J (.(a KCt

S I 2 . ^ 7 8 o < ? S - i

5&i ' & 0 rr>dhCi-\1PW) ^ 3 4 7 6 3 3 3 4 4 9 1

e ^ * - 4 • K a y }^ £ V 2rtfJ|-\ 'C - l<caA (£tj)

fi\csi i ct'Wdu.V*/■

R a j i v s toju + V ^ y )h a w ih 'e -l.C £ H

' C k ^ l l ^ t v x O U A

7 4 1 4 1 4 4 4 - 7 3 - fi Jh <3f£? * V > 8 u r r u ? y ^<?l 0 * ( r VT* ' Vovx l Ccd\Cv/\© v / e - s s e W X ^ L )

3 3 4 6 ^ ^ - 3 3 |

Page 83: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Public Hearing - Social Impact Assessment Date: 17/03/2018. rune: 11:00 amLAND A C Q U IS IT IO N FO R CH ELLAN AM F IS H IN G H A R B O U R C O N S T R U C T IO N P R O JE C T

1 ' ^Cirz\^Pr)'l GO A ' Clvcdf cm,wxaaa

GS A lf 4-1 GIG t

A nl&c) t[ Mob u (P'txToU/i (h j S< ckddlXj^^&jJA

A 0 ^ 5 - 7 ^ 7 0 6 :

n clk f- f n £? crfroM -cjM!Co U/Jgvr Skr-fifi-p

.. AIa^ p - bSrfro (^

A6 5TG75*

la - ^j5' ‘ c £bcx& h l*Wuu\^ci\

e Yr^ k ' A - Ckfi( 1 OWkUA - 7 1 ^ / —\

k& Cb\V&JQX>yJ S+ *- n Mklmy CKS -r l\f 11 avMXQLM

‘f& A T in a i 0

/A f< > o V\Oj CK \/ iVA* CMl/W /

T 3 S -7 a^ q & |? r

_______________ /

L X av f^X SosevhCA fartx/nn ro 1 G*)

(

ibU/M

L\J 'R - \ 3>e d \ AKi oc vR

^ * Plk /Ja) f\ A \ Da /\ A A A

lA G ^ S rA -) ^ 'J sJ> V V\J-X\l L W/ VU vLVvy '-------------1—\J \S axlctW 1< 5V\ wo 1 ^

fv /l/\An CX •— f\l < C\J\/7/x\-l r\

l £ 1 5"

--- ------------------

k 'V 'Kavv i W) ^nje.

°f /fit b 6 Ob3o U ---------—T---"*X

H

oto*

(^5ks |<i'S>kore.-P*t po^(^aH\cyc<3evW ♦&) /^vsdAvlaxaC rr> t \ H/1 VT *

‘U -fri &<?<;?>% 7Cd.

_< (T 1 <A I -=— 3 5--©--------------£b«» - p ’£ ,

s e_x rtfV- <vr K) cat,SV) - (X w i /M kOu Ot 1/1 _

1 / ' VcUa,

2

Page 84: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Date: 17/03/2018, Time: 11:00 amPublic Hearing - Social Impact Assessment __LAND A C Q U ISIT IO N FO R C H E LLA N A M F IS H IN G H A RBO U R C O N S T R U C T IO N P R O JE C T

M e h r i c J H v a r ^ ( f j

£> ' cX\ eJl&I^CLLL \

r^OJ CWyp k & T M * „*Ik e ^ e U l< 71

* 3 - A/i'\~j ±

■3

f ? e b < x s ( - ' 'O f x i ,[<W r)'s

^ C K p11qW 2^ a£ —, 5 Y > v £ 5 > e r&\\ji n ( ^ ( & )

b e l- e r . -

^ ' c t\ g J lc t L\Ct L.L)

A 1 »

^ 9r

" 7

3.

5 ^ .

£7 r p • <J €>&&£i h ^ a X C ^ S (£ T ix|

■£? • Civ J/ Q/vygu-vO ’c K n s C ’ O - " T £~

T h o .^ jt '1 q y

S -c K ^ X V cua o j u a

hvoc\A&.en I

£ * Civ ^ ilavA , A aaa^

f ^ r ^ o n u oU m J i /c Yp & Jlp tf a5 - CheMcLviOsm

<J CS&p h |<03n' S C r>^aj

S 'c h d llc u w x c a-

h a r y 6 K u l($ )

S - c J } f i U .MA ^ AK •■ J " A le i^ _

(E)S r JJ/x 'nA aaa

^ T s q 3 0 3 ^ 0 £ - 7

Pt/ R

7 ^ 5 6 4 - f e s s ^

<y 4-1164-173

& * &

7 1 ^ 1 ) 2 0 ^ 5 ' fA ^ p

7 7 3 9 -

Page 85: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Hearing - Social Impact Assessment Date 17/03, 2013. T - ;A C Q U ISIT IO N FO R CH ELLA N A M F IS H IN G H A R B O U R C O N S T R U C T IO N P R O - E C '

_ P3 VoVLcxcu V S&Kjbs9

1 7 ATcuscv?CV/v'rav \Ve u s e .

So tJjc\VcX30WV)<Vi*-cW35€sS~

3 9\RwxWc\ \}vZVjx\cvVtr)C)OT VA 0 U SeUveV-W*VnoVA/5c\=dkvo „

CY2>Tr'X3o Q T

*

p i- gWo,5<0 CKtn\<4K«vrC\ <&3 5 - cJr\ <i IXon-CUv

37’ -’S e>j{ L\'nscriy^ji 'nsoTV Vcv_\vevlco -(J j - WaW5 * cfua Uomo - C.2T,

' q>o4Z?JS3s9 9 f

3? rSKcuUCvjlaocM' ^poMoi otp o'Gplua'Ii rA

cK? Jl/LctAlAA % 1)

r-9OU-s RUHS pi DU< AR ICK-tU; VOwD/*-) iOa 8-fr-* i ' §f -

5

Page 86: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

Public Hearing - Social Impact AssessmentLand Acquisition for Construction of Fishing Harbour, Chellanam

Venue: St George LP School, South Chellanam

Date & Time: 17.03.2018; 11.00 AM

Officials List

SI NoName, Department &

DesignationContact Number Signature

1 - Y\. 0 -ocoo

*2 ■ |OUAAJa/\>](4C_» lljjy. C/jm S l A—

3. S' *15- *2 ^

3 . ^ <kTC^kS v^dLo cdkutfuxs)

w U c*^ - ®,fji£^CiA ci-Jtd^Uv^7 3 1 ^ ^ 9 7 ^ fVVV2 __-- .

V -l f ^ g\, _

*$f/ VA 0 /a cf 'ThAa^ J) A< 2>4° \ k h ( ,0 ° l2 3 (Q,

d je jtm B e f^ a W 'P

^ c J u lc - (£■ sp rfB h & O O u *i 9^ 7 3 0 6 3 7 ^ tV-

A >"->,

cq 4 4 .7 ^o?S'%) JfcL

ij^/euw / AzjoMO A # 'H sq jjc& fc), /7e/)v dln/lo^y- cfU v jfrh z L -

Page 87: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

2

k. -c3>. r W ' 1

/y 2 2 2 -

? *

Attendance Record - Public Hearing: Social Impact Assessment - Land Acquisition for Construction ofFishing Harbour at Chellanam

Page 88: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

1 ! / t y —

GOVERNMENT OF KERALA Abstract

Revenue Department - State policy for Compensation and Transparency in Land Acquisition - Approved - Orders issued.

13 ^

REVENUE (B) DEPARTMENTG.O.(Ms) No.485/2015/RD. Dated, Thiruvananthapuram, 23/09/2015.

Read G.O.(P) No.470/2015/RD dated 19/09/2015.

O R D E R

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has been enacted with the objective of ensuring just and fair compensation and rehabilitation for the affected families due to compulsory acquisition of land for public purpose. This Act came into force w.e.f. 01/01/2014. The State Government as per G.O. read above has approved Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Kerala) Rules, 2015.

2. Section 108 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 provides for framing a state law/policy which provides higher compensation than that calculated under this Act for the acquisition of land so that the affected person or his family or member of his famify can opt to avail such a higher compensation under such state policy .

3. Therefore, in order to speed up and simplify the procedures of land acquisition for public purpose, Government are now pleased to approve a state policy for compensation in land acquisition as appended to this order. The important objective of this policy is to conduct negotiations with the land owners and reach consensus on compensation and rehabilitation by the District Level Fair compensation, rehabilitation and resettlement committee (DLFC) and approval of the same by the State Level Empowered Committee (SLEC).

(By Order of the Governor)

Dr. Vishwas Mehta Principal Secretary to Government

ToThe Commissioner, Land Revenue, Thiruvananthapuram All District CollectorsThe Public Works /Water Resources/Industries/Power/Transport/

Local Self Government/IT Departments The Accountant General (Audit/A&E) Kerala, Thiruvananthapuram The Finance Department General Administration (SC) Department Tmormation 8s Public Relations (W&NM) Department Stock File/Office Copy.

Forwarded/By Order

Section Officer.

Page 89: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

- 2-

Appendix

Policy of the State of Kerala for compensation in land acquisition

Introduction

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 has been enacted with the objective of ensuring adequate compensation and Rehabilitation & Resettlement to Land owners whose land are compulsorily acquired by the State for bonafide public purposes. Section 108 of the Act empowers the Government to frame law or policy which provides a higher compensation than calculated under this Act for the acquisition of land and thereby enabling the land ouster to exercise option either to avail such higher compensation for Rehabilitation and Resettlement under such policy of the State or to go by the provisions of the Act. Kerala is a State with high population density and whenever Government resorts to acquisition of land for public purpose, families get displaced from their ancestral properties and lose lands which are often their sole livelihood. In order to ensure that immediate relief by providing enhanced compensation and Rehabilitation & Resettlement package to such affected families, Government of Kerala felt the need for framing an adequate policy on the subject.

Objectives

Government aims to ensure the following relief to the land losers through thispolicy.

1. The land loosers are provided with just and reasonable compensation for land acquired, relieving them from the burden of approaching judicial forums for enhancement of compensation.

2. Rehabilitation & Resettlement policy as provided in the Act along with additional packages including employment/stake holdings in eligible cases according to the nature of the project.

3. Disbursement of compensation before taking possession of land and ensuring Rehabilitation and Resettlement packages including infrastructural amenities as provided in the third schedule of the Act within 18 months of the date of publication of DD.

4. Transparency in procedures and less negative impact ensuring the land losers that their socio-economic status does not fall below what it was before the acquisition.

Frame work of the policy

The general provisions of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 shall apply to all land acquisitions. Social Impact Assessment (SLA) study shall be conducted in projects where it is mandatory and preliminary notification under Section 11 of the Act shall be published after approval of the project by the Expert Committee.

(1) The Government shall constitute a District Level Fair Compensation, Resettlement and Rehabilitation Committee in every District.

(2) The District Level Fair Compensation, Resettlement and Rehabilitation Committee shall have the following Members:

Page 90: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

- 3-

i) District Collectorii) Administrator for Resettlement and Rehabilitationiii) Land Acquisition Officeriv) Finance Officerv) Representative of the Requiring Body empowered to take financial

decisions on its behalf.vi) Representative of the Local Self Government Institution of the area where

the land is situated.

Provided that where the affected area covers more than one district, the District Level Fair Compensation, Resettlement and Rehabilitation Committee of the district, where major portion of the land to be acquired belongs to, shall function as District Level Fair Compensation, Resettlement and Rehabilitation Committee to take action in the matter.

(3) The District Collector will verify the title deeds, non-encumbrance certificate, basic tax receipt, building tax receipt, possession certificate and other relevant records of each parcel of land to be acquired.

(4) The District Government Pleader or any other advocate specially authorized by the District Collector in this behalf will scrutinize the title deeds, and other documents relating to ownership and possession and give necessary recommendation to the District Collector.

(5) The District Collector shall, within 7 days of the preliminary notification under Section 11, send the SIA Report and other relevant documents to the District Level Fair Compensation, Resettlement and Rehabilitation Committee.

(6) The District Level Fair Compensation, Resettlement and Rehabilitation Committee shall fix the parameters and shall define criteria for categorization of land as per the local needs to fix land value and the same may be approved by the Committee. The Committee should take utmost care in determining the criteria for categorization. There should not be any ambiguity regarding classification. The authority to change the categorization once approved by the District Level Fair Compensation, Resettlement and Rehabilitation Committee shall rest only with the SLEC.

(7) After categorization of lands, land value shall be arrived at as per the provisions of the Right to Fair Compensation and transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 and keeping this as the basis land value and taking into consideration the existing market value of the land make negotiation with the land owners and reach consensus with them on the final land value

(8) The Committee will finalise the estimate of a fair and reasonable price of land and compensation along with the Rehabilitation and Resettlement package to be given to the affected person/family. The Committee shall ensure that eligible affected family is given Rehabilitation & Resettlement an envisaged in the second and third schedule of the Act.

(9) The District Level Fair Compensation, Resettlement and Rehabilitation Committee shall send the estimate arrived as above, in Annexures I & II to the State Level Empowered Committee for approval.

Page 91: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

( 10) The Government shall constitute a State Level Empowered Committee which shall have the following members:

(i) Chief Secretary(ii) Revenue Secretary(iii) Secretary of the Administrative Department(iv) Law Secretary(v) Finance Secretary

(11) The State Level Empowered Committee shall approve the estimate or return it for reconsideration by the District Level Purchase Committee with suggestions/observations that it thinks fit.

(12) The District Level Fair Compensation, Resettlement and Rehabilitation Committee shall, within 15 days of the receipt of such approval with or without changes, send individual notices to the affected families and affected persons apprising them of the provisions of the law or policy and giving them a date to appear before it on a specified date for the purpose of considering settlement of compensation and resettlement and rehabilitation claims on the basis of the policy.

(13) On the date fixed as above, the District Level Fair Compensation, Resettlement and Rehabilitation Committee shall explain the policy to the affected family or affected person and give them an estimate of the compensation and resettlement and rehabilitation package worked out under the policy.

Provided that the date so fixed may be adjourned for another date for reasons to be recorded, Provided further that the proceedings shall not be adjourned for more than a period of 30 days in all from the first date.

(14) At the proceedings, the District Level Fair Compensation, Resettlement and Rehabilitation Committee shall present the estimated compensation and resettlement and rehabilitation package to the affected family or affected person and explain the terms and conditions of the same,

Provided that the District Level Fair Compensation, Resettlement and Rehabilitation Committee may change the compensation and relief and resettlement package for the benefit of the affected family or affected persons to the extent of 10% in order to arrive at a mutually acceptable d settlement. If District Level Fair Compensation, Resettlement and Rehabilitation Committee feels that a higher payment exceeding 10% is absolutely necessary, then the proceedings may be recorded and sent to SLEC for approval.

(15) The affected family or affected persons shall thereupon submit their consent tohaving their claims settled according to such law or policy of the State instead of settling the same under the Act

Provided that the affected families or affected persons who earlier rejected the negotiated settlement may, by a written application to the Collector, shall choose the option of the State policy at any time before passing the final award under Sections 30 and / or 31.

(16) Upon receiving the consent of the affected person or affected family, the District Level Fair Compensation, Resettlement and Rehabilitation Committee shall submit the consent along with minutes of its proceedings to the Collector for finalizing the conveyance of land in terms of the consent.

- 4-

Page 92: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

( 17) The Collector, upon receiving the consent, shall cause a Sale Deed in terms of the settlement arrived at in the proceedings before the District Level Fair Compensation, Resettlement and Rehabilitation Committee to be executed and registered between himself and the affected family or affected person.

(18) The Collector shall ensure that the draft declaration under Section 19of the Act has been published before proceeding with the execution of the sale deed.

(19) The designated officer of the concerned project authority will take steps to effect necessary changes in the classification of land through the Taluk Tahsildar on the basis of the copy of the registered deed obtained from the Office of the Sub Registrar.

(20) The Compensation or package received by the affected family or affected person shall not be subject to income tax or any other levy.

(21) The compensation and package agreed upon shall be paid into the bank account the details of which shall be submitted by the affected family or affected person along with the consent.

(22) On completion of the conveyance the Collector shall take possession of the land immediately, provided that the Collector may, on a written application by the affected family or affected person, accord sanction for extension of taking of possession of the land by a period not exceeding 30 days.

(23) No conveyance made under these rules shall be called in question in any court of law on any ground except that the same was executed by a person other than the one who was competent to do so.

- 5-

Appendix-1

Check List for District Level Purchase Committee1. Whether the title of the land is clear :

2. Whether any Government land is involved :

3. Criteria for categorization :

4. Criteria for fixing land value :

5. Decision of the DLPC

Page 93: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

- 6-

Appendix-IIFORMAT FOR SUBMITTING PROPOSALS FOR SLEC

I.

Category

TotalExtent

oflandin

Ares

No. of title

holders

No.of title

holders who have given

consent

Landvalue

asperBVRin

Ares

Land Value 100%+

solatium + 12%

additional land value

Land value

decided by the DLPC (per Are)

% of increase

Existingfaii-

value

A

B

C

D

Total

II Budget provision under H/A 5054-80-800-65 LA for Government purposes

III Amount already released

IV Balance available

V Approx, amount proposed to be released for compensation in the present case

VI Amount recommended for release

VII Whether percentage of increase is justified

Page 94: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

SOCIAL IMPACT ASSESSMENT STUDY -Land Acquisition for construction ofFishing Harbour at Chellanam

S LN O

S IAN U M B

ER

ADDRESS OF AFFECTED PROPERTY

NAM E AND ADDRESS OF OW NER

S U R V EY

N U M B

ER

O W N E

R/T E N A N

T

P R O P E RT Y

A F F E C T ED

A R E A O F A C Q U IS IT I

O N

EX T E NT O F

A C Q U IS IT IO N

V IA B IL IT Y

LIV ELIH O O D

A F F E C T

ED

1 SIA/2GEO RGE XAVIER

TH AIKKO O TATHIL CHELLANAM VILLAGE

GEO RGE XAVIER S/o T M XAVIER TH YKKUTTATH IL

HOUSEKOTTIPARAM BU KANNAM ALI P 0

682008

443/1 OW NER LAND 0.0344PARTIA

LLYYES NO

2 SIA/3

XAVIER FRANCIS CHIN KU TH ARA HOUSE S.CHELLANAM KOCHI-

8

XAVIER FRANCIS CHIN KU TH ARA HOUSE S.CHELLANAM KOCHI-

8

446/3,446/17

OW NER LAND0.0003,0.0003

PARTIALLY

YES NO

3 SIA/6

K P ABRAHAM KARUM ANJERI

EZH U PU N N A SO U TH P 0 CHERTHALA

ALAPPUZHA

K P ABRAHAM KARUM ANJERI

EZH U PU N N A SO U TH P 0 CHERTHALA

ALAPPUZHA

446/6 OW NER LAND 0.0735 INA* NO

4 SIA/7

JO SEPH PATROSE ERASSERIL HOUSE S.CHELLANAM P O

COCHIN

JO SEPH PATROSE ERASSERIL HOUSE S.CHELLANAM P 0

COCHIN

446/7 OW NER LAND 0.0048PARTIA

LLYYES NO

5 SIA/9

VARG HESE PATHROSE ERASSERIL HOUSE S.CHELLANAM P 0

COCHIN

VARGHESE PATHROSE ERASSERIL HOUSE S.CHELLANAM P 0

COCHIN

446/21 OW NER LAND 0.0080PARTIA

LLYYES NO

6 SIA/10

VARG HESE XAVIER ERASSERIL

S.CHELLANAM P 0 PIN-682008

VARGHESE XAVIER ERASSERIL

S.CHELLANAM P 0 PIN- 682008

447/1 OW NER LAND 0.5666PARTIA

LLYYES NO

Page 95: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

7 SIA/11

K JJO S E P H KURISHINGAL

S.CHELLANAM COCHIN-8

K JJO S E P H KURISHINGAL S.CHELLANAM

COCHIN-8

447/5 OW NER LAND 0.0104PARTIA

LLYYES NO

8 SIA/12

M ANOHARAN RAJAN KANDEKKATTUPARAM

BIL S.CHELLANAM CHELLANAM

HARBOUR

M ANOHARAN RAJAN KANDEKKATTUPARAM

BIL S.CHELLANAM CHELLANAM

HARBOUR

447/14 OW NER LAND 0.0094 FULLY YES YES

9SIA/12/

A

M ANOHARAN RAJAN KANDEKKATTUPARAM

BIL S.CHELLANAM CHELLANAM

HARBOUR

SARASU M OHANAN TENANT LAND YES

10SIA/12/

B

M ANOHARAN RAJAN KANDEKKATTUPARAM

BIL S.CHELLANAM CHELLANAM

HARBOUR

SINHU SHANM UGHAN TENANT LAND YES

11 SIA/13M ARTIN ERASSERIL

CHELLANAM KARAYIL

M ARTIN ERASSERIL GUJARATI STREET

ALAPPUZHA PIN-68012

447/15 OW NER LAND 0.0674PARTIA

LLYYES NO

12 SIA/14

B U N E Y E V ERASSERIL S.CHELLANAM

682008(GEO RGE ADOLF AND ALIAS

VAKKACHAN)

BUNEY E V ERASSERIL S.CHELLANAM 682008

448/1 OW NER LAND 0.0560PARTIA

LLYYES NO

13 SIA/15

SILVESTER ANJALOSE M AROTTIKKAL

PARAM BUS.CHELLANAM KOCHI

SILVESTER ANJALOSE ALUM PARM BIL

S.CHELLANAM KOCHI- 8

448/7 OW NER LAND 0.098PARTIA

LLYYES NO

14 SIA/16

SHYJU RAM AN (LATE RAM ANKRISHNAN)

M ARAVETTIKAL CHELLANAM SOUTH

SHYJU RAMAN M ARAVETTIKAL

CHELLANAM SOUTH448/9 OW NER LAND 0.0084

PARTIALLY

YES NO

Page 96: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

15 SIA/17

SOM ANATHAN C/O GOPALAN (LATE)

THARAYIL HOUSE CHELLANAM KARAYIL

CHELLANAM

SOM ANATHAN GOPALAN THARAYIL HOUSE CHELLANAM

KARAYIL CHELLANAM

448/13 OW NER LAND 0.0198PARTIA

LLYYES NO

16 SIA/18M ARAVETTIKKAL

CHELLANAM M URIYILPIN-682008

M ARAVETTIKKALCHELLANAM M URIYIL

682009448/14 OW NER LAND 0.0226

PARTIALLY

YES NO

17SIA/18/

A

RAM ESHAN (LATE LEELASREEN IVASAN )

M ARAVATTIKKAL CHELLANAM M URIYIL

PIN-682008

RAM ESHANM ARAVATTIKKAL

CHELLANAM M URIYIL682008

448/14 OW NER LAND 0.0266PARTIA

LLYYES NO

18SIA/18/

B

RAJESW ARI NAAYANAN

M ARAVATTIKKAL CHELLANAM M URIYIL

PIN- 682006

RAJESW ARINAAYANAN

M ARAVATTIKKALCHELL ANAM M URIYIL

PIN- 682006

19SIA/19/

A

XAVIER ANTONY POLLAYIL SOUTH

CHELLANAM

XAVIER ANTONY POLLAYIL SOUTH

CHELLANAM

448/17,448/15

OW NER LAND0.0183,0.0089

PARTIALLY

YES NO

20 SIA/20

JO HNSON C P CHIN KUTHARA HOUSE SOUTH CHELLANAM P

0

JO HNSON C P CHIN KU TH ARA HOUSE SOUTH CHELLANAM P

O

449/7-2 OW NER LAND 0.0310PARTIA

LLYYES NO

21 SIA/21SATHEESHAN M AROTTIKKAL

SOUTH CHELLANAM

SATHEESHAN M AROTTIKKAL

SOUTH CHELLANAM449/2 OW NER LAND 0.0436

PARTIALLY

YES NO

22 SIA/22

M ALSTYATH O ZH ILAN I VIKASANA KSHEM A

SAHAKARANA SNGHAM Reg.No FE 9/87CZ SOUTH

CHELLANAM

O M ANA BABY M ALSTYA THOZHILANI

VIKASAN A KSHEM A SAHAKARANA

SNGHAM Reg.No FE 9/87CZ SOUTH

CHELLANAM

449/3449/4449/7

OW NER LAND 0.0627PARTIA

LLYYES NO

Page 97: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

23SIA/23/

A

RAJESHS/O BALAKRISHANAN

V RVALIVAVEETIL SC H ELLA N A M

KOCHI -8

RAJESH VALIYAVEETIL SC H ELLA N A M

KOCHI -8

449/5 OW NER LAND 0.0395PARTIA

LLYYES NO

24SIA/23/

BVIJAYALAKSHM Y

SOUTH CHELLANAM

UNNIKRISHNAN EDACHERAPPILLY

HOUSE M ARADU PIN- 682304

25SIA/23/

CVI MALA

SOUTH CHELLANAM

UNNIKRISHNAN THEKKUM BHAGAM TRIPU N ITH U RA PIN-

682301

26SIA/25/

A

M OSSESS CLETUS POLLAYIL HOUSE

SOUTH CHELLANAM COCHIN-8

M OSSESS CLETUS POLLAYIL HOUSE

SOUTH CHELLANAM COCHIN-8

449/10 OW NER LAND 0.0314PARTIA

LLYYES NO27

SIA/25/B

FRANCIS P B POLLAYIL HOUSE

SOUTH CHELLANAM KOCHI-8

FRANCIS P B POLLAYIL HOUSE

SOUTH CHELLANAM KOCHI-9

28SIA/27/

A

PETER SOLOM ON POLLAYIL CHELLANAM

ERNAKULAM

PETER SOLOM ON PO LLAYIL CHELLANAM

ERNAKULAM

29SIA/27/

B

PETER SOLOM ON POLLAYIL CHELLANAM

ERNAKULAM

PETER SOLOM ON POLLAYIL CHELLANAM

ERNAKULAM449/12 OW NER LAND 0.0265

PARTIALLY

YES NO

30SIA/30/

A

K V JOSEPH KURISHINGAL HOUSE

CHELLANAM P O CHELLANAM

HARBOUR

K V JOSEPH KURISHINGAL HOUSE

CHELLANAM P 0 CHELLANAM

HARBOUR

450/4 OW NER LAND 0.0060PARTIA

LLYYES NO

Page 98: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

31SIA/30/

B

ANTO NY VARGHESE KURISHINGAL HOUSE SOUTH CHELLANAM

PIN -682008

ANTO NY VARGHESE KURISHINGAL HOUSE SOUTH CHELLANAM

PIN -682009

32SIA/31/

A

JO SYJO SEPH CHIRAM M EL CHELLANAM

JO SYJO SEPH CHIRAM M EL CHELLANAM

450/5450/16

OW NER LAND0.03860.2620

PARTIALLY

YES NO33

SIA/31/B

OUSEPH P J CHIRAM M EL HOUSE

CHELLANAM

OUSEPH P J CHIRAM M EL HOUSE

CHELLANAM

34 SIA/32

M ARY SHIJI CHIRAM EL HOUSE

SOUTH CHELLANAM KOCHIN-8

M ARY SHIJI CHIRAN M EL HOUSE SOUTH CHELLANAM

KOCHIN-9

35 SIA/34M ALTHY CHELLANAM

M URIYIL M ARAVETTIKKAL

M ALATHY M M NALINI SARANYA C H E R T H A LA P O

W ARD NO :29

451/28 OW NER LAND 0.1215PARTIA

LLYYES NO36

SHANTHAKUM ARI CHELLANAM M URIYIL

M ARAVETTIKKAL

SHANTHAKUM ARIM ADHAVAN

37RAJALEKSHM I

CHELLANAM M URIYIL M ARAVETTIKKAL

RAJALEKSHM IM ADHAVAN

, 38 SIA/36

ASHOKAN M D M ARO TTIKKAL HOUSE

CHELLANAM P 0 CHELLANAM

ASHOKAN M D M ARO TTIKKAL HOUSE

CHELLANAM P 0 CHELLANAM

451/9 OW NER LAND 0.0107PARTIA

LLYYES NO

39 SIA/37SEBASTIAN K E

KURISHINGAL HOUSE

SEBASTIAN S/o EASY KURISHINGAL NEAR M ALIKAPARAM BU

CHELLANAM KANNAM ALI 682008

451/10 OW NER LAND 0.0195PARTIA

LLYYES NO

Page 99: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

4 0 SIA/38

KURIEN PRAVEEN PUTHEN VEETIL

SOUTH CHELLANAM KOCHI-8

KURIEN PRAVEEN PUTHEN VEETIL SOUTH CHELLANAM KOCHI-8

451/13 OW NER LAND 0.0012PARTIA

LLYYES NO

41 SIA/26

VIRONIW /OTHOM AS T E TH AYYIL HOUSE

SOUTH CHELLANAM KOCHI-8

VIRONIW /OTHOM AS T E TH AYYIL HOUSE

SOUTH CHELLANAM KOCHI-8

449/11 OW NER LAND 0.0391PARTIA

LLYYES NO

4 2 *MUNDAMVELIL

SUNITHA JOSEPH KUNJU

MUNDAMVELIL SUNITHA JOSEPH

KUNJU4 5 0 /3 0 .0 0 2 3

^Information Not Available(INA)

Page 100: SOCIAL IMPACT ASSESSMENT STUDY REPORToutreach.rlabz.in/wp-content/uploads/2018/07/2018052361.pdf · industries, introduction of new generation crafts, processing and marketing, landing

RCSSRAJAGIRI COLLEGE OF SOCtAL SCIENCES (AUTONOMOUS)

RAJAGIRI COLLEGE OF SOCIAL SCIENCES (AUTONOMOUS) Rajagiri P.O,Kalamassery, Cochin - 683 104 Kerala, Inaia.Ph: 0484 2911111 - 2555564Email: [email protected] www. raj agiri. edu