Smarter Manufacturing Sustainable Futures 4 FLEXINET project IT Perspective
-
Upload
flexinet-project -
Category
Technology
-
view
51 -
download
0
Transcript of Smarter Manufacturing Sustainable Futures 4 FLEXINET project IT Perspective
7th October 2014 – Coventry Workshop
Contents
�The IT results expected in FLEXINET
�Support to strategic and tactical decisionmaking
�PSCoMS: package of applications for Product-Service concepts management
�Focus on the Cooperation Environment
7th October 2014 – Coventry Workshop
Steps towards GPN configuration
innovative strategic business models
supporting the new product-service are
evaluated and a new business model is
selected (WP2).
reference organisational models and
processes are selected or designed (WP4)
Based on these models, what-if scenarios
are generated and optimal Global
Production Networks is calculated
through a DSS (WP5)Kn
ow
led
ge
fo
rma
lise
d
in r
efe
ren
ceo
nto
log
ie
(WP
3)
7th October 2014 – Coventry Workshop
The IT support to flexible re-organisation of GPN
�The PND – Production Network Design configurator is the collaborative infrastructure to deliver a GPN DecisionSupport System (GPN-DSS)
�GPN DSS provides applications and services for representing, configuring and evaluating global product-service production networks.
7th October 2014 – Coventry Workshop
The PND applications
3 main packages:
� ERAS: provides services to evaluate the risks associated with a GPN, by checking the decisions on innovative product-services to be produced against economical and cost risks
� PSCoMS: supports companies in the transitionfrom product-centered to service-centered offer
� PNES: evaluates the impact of adoption of a Business Model (high level) and new technologies(low level) on the GPN; to reconfigure the Production network accordingly
7th October 2014 – Coventry Workshop
PSCoMS applications
� Idea Manager: to collect, organise, share information about new P/S idea; search for similarideas proposed in the past
� Collaboration Environment: to support multiple player cooperation and decision making processwithin virtual spaces, with shared tools (also from FLEXINET)
� Product-Service configuration: guiding the technical department in the high-level configurationof a new P/S solution
� User Experience Analyser: to collect and analysedata and feedback from trials to support re-engineering of P/S solutions
7th October 2014 – Coventry Workshop
Why the Collaborative Environment
�The process behind the approval and delivery of new P/S idea goes through severalintermediate approval «gates»
�Ideas are promoted to the next gate duringphysical meetings where evaluations are performed and results analysed
�Collaborative Environment offer the possibility of making the meeting virtual and to make different information sourcesavailable to empower the decision making
7th October 2014 – Coventry Workshop
Some background…
�The FLEXINET Cooperation Environment isbased on the Obeya Methodology whichis…..
7th October 2014 – Coventry Workshop
The meaning of Obeya….
� Obeya or Oobeya (from Japanese "large room" or "war room") refers to a form of project management used in Asian companies (including Toyota) and is a component of the Lean Management.
� Is a Visual Project Management technique, all individuals involved with the planning gather in a 'Great Room' to achieve fastest communication and shortest decision-making processes.
� an Obeya will contain highly visual charts and graphs depicting program timing, milestones and progress to date and countermeasures to existing timing or technical problems
7th October 2014 – Coventry Workshop
The Virtualisation of the Obeya
� A virtual space, provided through a web-availableapplication, to support remote participation to meetings
� In the room it is possible to share contents through«visual» tools and any useful application and collectfeedback
� The same tools and information are visualised on multiple clients (browsers) allowing remote connections to the same meeting
� Access from people and visibility of widgets can be filtered through a permission granting mechanism
7th October 2014 – Coventry Workshop
Conclusions
�Several applications will be combined intothe PND platform to provide an articulatedDSS for GPN configuration
�Where we are now: detailed design & mockups available
�What next: first prototypes ready by end of 2014