SMARTER INFORMATION MANAGEMENT - Bim · Vice Chairman of the board of buildingSMART Benelux since...
Transcript of SMARTER INFORMATION MANAGEMENT - Bim · Vice Chairman of the board of buildingSMART Benelux since...
Alexander Worp
GEO|Design+BIM 2 November 2018
SMARTER INFORMATION MANAGEMENT By using Open Data Standards
INTRODUCTION
Strategic Advisor at Asset Management Schiphol.
For 5 years working on implementing Building Information Management.
Vice Chairman of the board of buildingSMART Benelux since June 2017.
Room leader user group ‘Airport Room’ at BuildingSMART int.
More successful asset management is only possible through collaboration
with all stakeholders throughout the entire lifecycle. by exchanging
structured open data that can be validated and verified.
Schiphol realizes that BIM- and Geo-Information must be combined
and brought into relation to really add value.
We have taken the first steps, but continue to look for cooperation,
to ultimately make the best choices for connecting GEO|Design+BIM
Schiphol Facts
Schiphol is “Special”; It is a location, a city & a company
Investments
CAPEX : € 1,50 million a day
OPEX : € 0,41 million a day
50% of our aviation cost are related to the Assets
Alex(ander) Worp
SMARTER INFORMATION MANAGEMENT True open standards & collaboration
WHY
We have to make better decisions
during the lifecycle of our assets?
THE CHALLENGE Information exchange has to improve
THE CHALLENGE
Many players, assets & data
THE OPPORTUNITY
clear agreements uniform data structure
IDM IFC
To apply Open Standards correctly we need two things:
Alex(ander) Worp
SMARTER INFORMATION MANAGEMENT
True collaboration
From.…
complex redundant time consuming error-sensitive
Being a dominant party that opens up their own systems to partners, suppliers and for consumptions. A closed collaboration…
From ‘Top Down’ To
EIR for Design and Engineering
improve by aligning expectations
‘Bottom Up’
OVER 300 Committed users OVER 145 participants /stakeholders
Principles
A guideline (IDM) on the How
It is not more then 2x A4 pages
Uniform Design & Engineering Info. Request
Waarom blijkt het zo moeilijk?
Het gaat vaak:
- Om heel veel
- Over veel verschillende zaken
- Voor verschillende partijen
- Verschillen tussen projecten
Veel voorzetten en initiatieven geweest:
Why is it so difficult?
it is often about:
- a lot
- about many different things
- for different parties
- difference between projects
Focus on information Use what is there!
Object information
Work type information
Functional specification& performance
There are 3 main categories : generic, applies to all elements for all projects element specific, applies to all projects project specific
Create simplicity
From ‘by our self's’ To collaboration
International
Airports
Dutch
Clients
Organize
To what will all this lead……..
shared data more knowledge
improved efficiency
predictable maintenance
cost reduction
A collaborative digital system where multiple parties work together and share there information with common standards, processes and roles.
WILL YOU JOIN US? The succes of Information Management is based on the managed exchange of
structured information throughout an asset’s lifecycle.
Coming together is a beginning
Keeping together is progress;
Working together is SUCCESS Henry Ford
Digitization/computerization of Asset management with (large scale) exchange of information throughout the life cycle to optimize processes and decisions making
A process, including digital systems, where multiple parties collaborate unambiguous and share
relevant information based on open standards, workflows and roles.
Schiphol realizes that BIM and Geo Information must be combined and
brought into relation to really add value.