Page 1: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Smart Metering: Spotlight CEZ

Distributie Oltenia (Romania)

Lukas Gebhardt I Portfolio Manager

Cosmin Ghita | Director of Digitalization & Innovation

siemens.at/future-of-energyUnrestricted © Siemens 2019.

Page 2: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 2 Gebhardt / RC-AT SI DG CS&D-APS

Major factors driving

the revolution of energy systems…

Prosumer-

centric energy

world

Unrestricted © Siemens AG 2018

“All electric world” - Fluctuating infeed – e-Mobility

CO2Power production from renewables

Increases by over 300% between 2010 and 2030

Share of renewables goes up to 40% in 2030

Distributed generation – Microgrids – Energy autonomy

New installations distributed power generation

Increases by over 150% between 2010 and 2030

Share of distributed goes up to 67% in 2030

Connectivity - Grid edge - End-to-end

New installations global smart meters

Increases by 200% between 2015 and 2025

Reaches 100 million p.a. in 2025

Page 3: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 3 Gebhardt / RC-AT SI DG CS&D-APS

Smart Metering is a major driver of thedigital transformation of energy systems

Page 4: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 4 Gebhardt / RC-AT SI DG CS&D-APS

Metering system architecture

Siemens supplies all system elements

Meter Data Management

Head End System

Gateway

Meter

Vendor 1

G3-PLC

Meter

Vendor 2

Meter

Vendor n

UDIS

SGW1050

Siemens

IMx50

3rd party

meter

3rd party

meter

s

G3-PLC

Billing, Market transactionsBilling e.g. SAP

P2PP2P

▪ G3-PLC (PLC = PowerLine Communication) Gateway controls physical

meter communication via PLC

▪ Logical Integration of (different) meters in HES (not in GW);

▪ Secure E2E-communication between meters and HES

Page 5: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 5 Gebhardt / RC-AT SI DG CS&D-APS

Siemens offers EnergyIP powered by MindSphere a future proof solution platform for the all electric digitalized energy world

Page 6: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 6 Gebhardt / RC-AT SI DG CS&D-APS

EnergyIP powered by MindSphere –

Flexible scalable platform for more and more smart grid applications

EnergyIP

Analytics Suite

EnergyIP MDM

Meter Data

Management

• No CAPEX, less risk

with Software as a

Service. Running in a

virtualized public data

center e.g. AWS

Page 7: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 7 Gebhardt / RC-AT SI DG CS&D-APS

EnergyIP MDM powered by MindSphere

Highlights

• Process meter data from various smart meter vendors

automatically to implement efficient processes for

• Data validation and estimation – automatically identify

and correct device errors, wrong measurement values

to ensure complete and accurate data sets

• Meter to cash – automatically transfer billing

relevant data to billing system (e.g., SAP)

• Flexible application support via single point

of integration to CIS and other systems

• Out of the box reporting and AMI vendor independent

Page 8: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 8 Gebhardt / RC-AT SI DG CS&D-APS

EnergyIP Grid Application Platform and applications are proven

in 80 installations worldwide

Page 9: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 9 Gebhardt / RC-AT SI DG CS&D-APS

Actual Smart Meter projects with Siemens Austria participation

4’4 Mio meter points contracted with AT-Master

Smart meter projects with Siemens participation

Austria Romania

Operational Efficiency End-to-End Security Business Process Optimization

FOCUS TOPICS

Page 10: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 10 Gebhardt / RC-AT SI DG CS&D-APS

Operational Efficiency

Page 11: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 11 Gebhardt / RC-AT SI DG CS&D-APS

• Group Management

• Alarm & Event Correlation

• Campaign Controls

• Dashboards

• GIS Integrations

Focus topics of Smart Metering

Operational Efficiency: MOC is our answer

Metering Operation Center (MOC)

MOC MDM KMS

Integration-Layer Backend

Abstraction-Layer HESAT

-M

aste

r

Page 12: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 12 Gebhardt / RC-AT SI DG CS&D-APS

End-to-End Security

Page 13: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 13 Gebhardt / RC-AT SI DG CS&D-APS

Focus topics of Smart Metering

End-to-End Security: KMS is our answer

Key Management System (KMS)

MOC MDM KMS

Integration-Layer Backend

Abstraction-Layer HESAT

-M

aste

r

Responsible for Key Management

• Secure Storage of device keys for each meter role

• Key life cycle management

• Backup & Recovery of symmetric device keys

Responsible for Key Usage

• Message de-/encryption, signing and signature validation

Page 14: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 14 Gebhardt / RC-AT SI DG CS&D-APS

Business Process Optimization

Page 15: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 15 Gebhardt / RC-AT SI DG CS&D-APS

Focus topics of Smart Metering

Business Process Optimization: AT-Master is our answer

AT-Master = MDM + MOC + KMS + Interfaces

MOC MDM KMS

Integration-Layer Backend

Abstraction-Layer HESAT

-M

aste

r

Template to cover the business needs of Smart Metering

In total 93 Use-Cases (IDIS, ÖE,…) clustered in 12 groups:

• Select

• Switch off / release for

recommissioning

• Parameterization

• Firmware Upgrade

• Events/Alarm

• Calibration/Testing

• Gateway / Dataconcentrator

• Security

• Installation and Commissioning

• Measurement Data

• Master Data Synchronization

• Management

• Device Status

• On-site Use Cases

• Load Management

UC: On Demand Read

UC: Hard Connect

Page 16: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 16 Gebhardt / RC-AT SI DG CS&D-APS

Smart Metering: Spotlight CEZ DistributieOltenia (Romania)

Page 17: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

SMART METERING IN

ROMANIA

DEO presentation

June, 2019

Vienna

Page 18: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

18

FROM A CZECH COMPANY TO A

MULTINATIONAL GROUP – CEZ AS

INVESTMENT IN ROMANIA

18

Timisoara

Arad

Oradea

Satu Mare

Alba lulia

Bistrita

Tîrgu Jiu

Deva

Drobeta-Turnu

Severin

Suceava

Botosani

Iasi

Vaslui

Sibiu

Zalau

Miercurea

Ciuc

Rîmnicu Vîlcea

Brasov

Pitesti

Sfîntu Gheorgh

e

Slatina

Focsani

Galati

Buzau

Ploiesti

Slobozia

Calarasi

Giurgiu Alexandria

Braila

Tirgoviste

Tulcea

Tîrgu Mures

Piatra Neamt

Bacau

Resita

Baia Mare

Cluj-Napoca

ConstantaCraiova

Bucuresti

Distribuţie Oltenia: energy distribution in 7

Counties (in the area of former Electrica Oltenia)

CEZ Vânzare: supplier for more than 1,3 mil. de clients (economical and house holders)

The wind park form Fântânele, Cogealac and Grădina▪ 1,1 bln. Euros investment▪ Installed capacity: 600 MW The CEZ wind park is the largest on shore wind park in Europe

Stage Fântânele:▪ First stage of the project– 139 wind turbines;▪ Construction began in October 2008▪ Was connected to the grid in June în 2010

Stage Cogealac:▪ Second stage of the project - 101 wind turbines; ▪ End of construction: Dec. 2012

Hydroelectric system of micro hydro-plants in Caraş Severin

▪ 30 mill. Euros invested in the refurbished processes▪ Installed capacity: 18 MW before the refurbishment and

almost 22 MW after refurbishment

CEZ Trade: energy transaction (en-gros market)CEZ România: management and services supplier for the companies of CEZ Group in Romania)

Page 19: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

19

INITIAL NATIONAL SMART METERING

IMPLEMENTATION PLAN WAS 80%

DEPLOYMENT BY 2020

Smart metering implementation – high benefits estimated

2012 ATKearney study for Romania prepared for ANRE showed benefits in 80%

deployment

Financial input ATK caseEquipment lifetime 20 years for technical

15 years for WiMAX, fiber optics

5 years for IT&C

Comms. technology PLC 99%, GPRS 1%

Inflation Flat, at 4%

Discount rate Flat, at 7.5%

CPT split 63% technical37% non-technical

Decrease in non-technical CPT 60% reduction from current level

Decrease in OPEX 100% decrease in disconn/ reconn. (process automation)

Decrease in intervention time/cost 1% reduction of time to perform maintenance

Pilot projects were deployed by each DSO in order to confirm initial assumption

and test PLC technology

Page 20: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

20

DEO IMPLEMENTED SO FAR 34 THS.

SMART METERS IN SEVERAL AREAS AND

TESTED DIFFERENT PLC TECHNOLOGIES

▪ Urban area, old network

▪ Urban area, modernized network

▪ Rural area, old network

▪ Rural area, modernized network

2013 PilotANRE Order

▪ DEO ~13 ths. meters:

• Craiova

• Carcea

• Podari

▪ Urban area, modernized network

▪ Rural area, modernized network

2014 PilotANRE Order

▪ DEO ~20 ths. meters:

• Craiova

• Carcea

▪ Upgrade network included:

• Urban area, block of flats

• Urban area, houses

• Rural area

• Rural isolated area

2012 DEO Pilot

▪ DEO ~1.2 ths. meters:

• Craiova

• Carceni & Cordun

• Satic

Smart metering implementation – pilot projects

▪ Lab tests

▪ Urban area, modernized network

▪ Urban area, old network

PRIME & G3 test

▪ DEO 320 meters:

• Craiova

Page 21: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

21

ROLLOUT DEPLOYMENT STRATEGY WAS

TAILORED TO FIT DEO SPECIFIC NEEDS

AND MAXIMIZE BENEFITS

Smart Metering deployment prioritization and strategy

Prioritization strategy

▪ Multi-criteria analysis applied to SS’s considers:

• Losses (40%)

• Periodic replacement (40%)

• Depreciation(20%)

▪ SS’s grouping by zones:

• no. of consumers: limited at ~4000 consumers,

depending on urban/rural environment

• clearly defined physical limits (such as railways,

rivers or boulevards)

• SS’s fully included in a zone (i.e. all consumers of a

SS must be part of the same zone)

▪ Average score for each zone was obtained and used to

prioritize.

▪ Zones were classified into three priority tiers:

• Priority 1: <3,000

• Priority 2: 3,000-4,000

• Priority 3: >4,000

Legend

Priority 1 Zones for Smart

Priority 2 Zones for Smart

Priority 3 Zones for Smart

Urban area

Rural area

Gorj

Arges

Mehedinti

Dolj

Olt

Teleorman

Valcea

2

12

5

3

119

2

87

11

8

0

5

7

0

6

3

11

4

0

000

13

7

0

10

1

13

18

1

450

3

8

5

10

4

0

202283k meters

202183k meters

202041k meters

202383k meters

202498k meters

Page 22: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

22

SMART TRANSFORMATION TARGET IS TO

TRANSFORM DEO BUSINESS MODEL,

ORGANIZATION & CULTURE

▪ Analysis of current and definition of target

processes

▪ Scanning of available IT solutions and vendors

▪ Preparation of business & technical requirements

▪ Finalization of new concepts (incl. business cases)

▪ Initiation of procurement processes for new

systems and services

▪ Implementation of new systems

▪ Smart Metering IT systems design

▪ Solutions Implementation, test and approval

▪ Training and full potential adoption

▪ Change management

Project

background

Expected

results

▪ Multiple regulatory constrains

▪ Problems with key indicators:

CPT, SAIDI, SAIFI

▪ Limited resources

▪ Necessity of efficient system

integration

▪ Manage resources more

effectively using available data

for decision making

▪ Decrease paperwork and

increase analytical capabilities

▪ Become more flexible, adaptable

and compliant

Status of activities

Completed activities Next steps

Smart Transformation introduction

Page 23: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

23

SMART PROGRAM HAS 7 INITIATIVES

COVERING ALL MAJOR AREAS OF

DISTRIBUTIE OLTENIA

Smart Metering

GIS

Meter Data Management

Mobile Workforce Management

Smart Transformation – Key project components

SCADA, sectionalizers & reclosers

Enterprise architecture

Data governance

Page 24: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

24

SMART PROGRAM HAS STANDARD 3

LAYER ORGANIZATION SPLIT INTO 4

STREAMS

SMART Transformation program organizationO

pe

rati

on

al

Ta

cti

ca

lS

tra

teg

ic

Program Management

CEZ Romania Group:

Smart Steering Committee

CEZ CZ Distribution segment management

Stream 1 Stream 2 Stream 3 Stream 4

Smart Steering Committee takes place every 2-3 months. Key outputs from the Smart Transformation are presented on the Group Steering Committee

Meter data management+

Smartmetering

Mobileworkforce management

Geographical informationsystem

SCADA

Datagovernance

Enterprise architecture

Program management

Page 25: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

25

Siemens offers a future proof solution to support customers on their Smart Metering journey

Operational Efficiency End-to-End Security Business Process Optimization

Page 26: Smart Metering: Spotlight CEZ Distributie Oltenia (Romania) · Increases by over 300% between 2010 and 2030 Share of renewables goes up to 40% in 2030 Distributed generation –Microgrids

Unrestricted © Siemens 2019.

June 27, 2019Page 26 Gebhardt / RC-AT SI DG CS&D-APS

Contact

siemens.at/future-of-energy

Lukas Gebhardt

Portfolio Manager

RC-AT SI DG CS&D-APS

Siemensstraße 90

1210 Vienna

Mobile: +43 (664) 80117 83182

E-Mail:

[email protected]

Cosmin Ghita

Director Digitalization & Innovation

Distributie Oltenia

Cales Severinului 19

200768 Romania

Mobile: +40 (734) 455 886

E-Mail:

[email protected]