Smart MeteringPreparing our electricity network for the future
esbnetworks.ie
What is the Smart Metering Project?
A major meter replacement project which will support Irelands move to a decarbonised
electricity network supporting the national climate action plan and helping Ireland to
tackle climate change
The main Benefits of Smart Metering are:
1. Consumers will be able to access the information
they need to make more informed choices about their
consumption and the best tariff option for them
2. The Environment will benefit because smart metering
will encourage energy efficiency and support an
increase in renewable power on the electricity system
3. The Economy will benefit because using smart
meters will help us to more efficiently manage energy
flow at times of high demand
esbnetworks.ie
Why have a Smart Metering Programme?
The five main objectives of the National Smart Metering Programme are:
Encourage energy efficiency1
Facilitate peak load management2
Support renewables and micro-generation3
Enhance competition and improve customer experience4
Improve network services5
esbnetworks.ie
How will we deliver - Phased Approach
2018 2019 20212020
First meter
installed
2022 2023 2024 2025
250k Meters
Installed & Smart
Services Go-Live
Additional 1
million meters
installed
Remaining 1
million + meters
installed
Phase 3 also delivers:
• Commence the gas smart
meter solution
• In-Home Channel
• Enable In-Home Displays for
real-time customer information
• Micro Generation
Remaining smart
meters (1m+) safely
installed by the end of
2024.
Phase 2 also delivers:
• Smart Pre-Payment services
• Advanced meter alerts &
events
An additional 1 million
smart meters safely
installed by end of 2022
Phase 1 also delivers:
• Procure, build & test new
smart electricity meter
solution
• IT and process changes to
collect, process and
distribute 30 minute interval
data to the market
250,000 smart electricity
meters safely installed
by the end of 2020
esbnetworks.ie
Deployment of Smart Meters
Customer
EngagementSupply Chain
and
Logistics
Dispatch
and
Schedule
Meter
Installation
and Follow Up
Close out
work order
Safety, Health,
Quality &
Environment
Data Privacy & Security
esbnetworks.ie
Customer Journey – Indoor, SME & Outdoor (Appointments)
Local Engagement
Campaign
• Local political engagement
• Local print
• Local radio
• Social media
Second Letter (2 – 4
weeks)
• From ESB Networks or
Contractor
• We’re in your area and will
be calling shortly to
replace your meter
Customer should contact
ESB Networks in case of
emergency
Customer should contact
installer to reschedule
appointment or raise any
issues
Post-Installation Survey
A third party may contact the
customer to carry out a post-
installation survey
First Letter (1 – 3 months)
• Initial engagement
• We’re coming to your area
• Insert with overview
Courtesy ‘On My Way’
Call and Door Knock
• Installer to ascertain if
there is anyone who
requires special
assistance
• Installer to withdraw if
unaccompanied minor
present
Meter Replacement
• The customer’s meter is
replaced and any
remedial repair work will
be carried out where
necessary
Letter & Explanatory
Brochure
• Letter advising of
replacement & booklet
with details of the new
meter and how to read it
Customer Contact (1-4
weeks)
• Customer contacts to
make an appointment
• If no contact from
customer, calls will be
made by ESB
Networks or
contractor to arrange
appointment
Reminder SMS (1 day)
• Customer receives
SMS reminder that
installer will be with
them the next day
General Awareness
• Website
• Social media
Ministerial & Energy
Spokespeople
Briefings
National Press
Release Media
Briefings &
Interviews
6 Months 1- 3
months On the Day
Customer Awareness Customer Engagement Meter Replacement Follow Up
2 weeks – 1
day
Appointment Booking
esbnetworks.ie
Deployment Strategy – priorities and considerations
Pillars of Smart Metering which must be
delivered by the Strategy
Factors to constrain and overlay onto the Strategy
Deployment Priorities Strategic Considerations
To be
considered as
further
overlays onto
the Strategy
Applied as
constraints to
define our
Strategy
Supplier Equitability
Communications Coverage
Political Support & Public Support
Business Impact
Asset Age
Geographical Footprint
Our Strategy will not compromise the safety of our
staff, contractors or members of the public
Safety
Our Strategy will achieve 250k installations by
maximising installation rate within the applied
constraints
Installation Rate
Our Strategy will be cost efficient through
geographical optimisation of delivery
Cost Efficiency
Our Strategy provides all customers with a positive
and consistent experience
Positive Customer Experience
esbnetworks.ie
Smart Metering Deployment
First Meter install – Sept 2nd
3,000 installs complete
> 350 installers trained
3rd Deployment Contractor
mobilised by January 2020
20,000 installs by Dec 2019
250k installs by end of
Phase 1
Next Steps
Deployment Progress
esbnetworks.ie
Summary
In 2019, ESB Networks commenced its meter replacement programme which will result
in the upgrade of 2.4 million meters to modern smart ready digital technology
These new generation electricity meters are being rolled out across Europe and
internationally and when the programme completes in 2024 all homes, farms and
business premises will have a new modern meter installed
Smart meters will support the migration to a carbon free electricity network and will
support smart grids, the electrification of heat and transport, local renewable generation
and microgeneration
The upgrade will bringbenefits to the …