Shuswap Lake Integrated Planning Process (SLIPP) All-Committee MeetingShoreline Update
Ken Ashley and Keith Weir April 12, 2012 Quaaout Lodge
![Page 2: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/2.jpg)
Shuswap Lakes Foreshore Habitat Restoration
Ken Ashley, Ph.D.
![Page 3: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/3.jpg)
Outline § Background § Site restoration in 2011-12 § Restoration plans for 2012-13 § Questions
![Page 4: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/4.jpg)
Background
§ Unprecedented increase in the scale and scope of development on the Shuswap Lake System.
§ Minimal base line bio-physical information for the
Shuswap Lake System to track changes over time, consider cumulative impacts and assist directing land / foreshore use planning.
![Page 5: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/5.jpg)
§ FHIM project initiated in 2007.
§ Key partners CSRD, other local governments and MOE.
§ Funded by the Real Estate Foundation, Fraser Salmon and Watersheds Program, DFO and MOE (“in kind support”). Total project costs approx $100,000 to date.
![Page 6: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/6.jpg)
§ Substantial modification of riparian and foreshore adjoining private land and IR
§ Many modifications lie with sensitive habitats.
§ Significant non compliance with BMP, OS and Guidelines. Works without Approvals
§ Extensive unauthorized use and trespass of crown foreshore.
![Page 7: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/7.jpg)
Beach Modifications
Over 1,100 groynes or substrate windrows
![Page 8: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/8.jpg)
Retaining Walls
>1,500 retaining walls - 60% of private properties
>50% below MAHWM
Majority of walls are for retaining upland fill and landscaping
![Page 9: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/9.jpg)
Infilling
Few large infills but many small leading to cumulative impacts
![Page 10: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/10.jpg)
Boat Launches
>180 boat launches
![Page 11: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/11.jpg)
Riparian Removal or Infill
Majority of new development would not comply with RAR standards
![Page 12: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/12.jpg)
Upland Drainage Modifications
Often difficult to detect.
Drainages are important to shore spawning.
![Page 13: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/13.jpg)
Removal of Emergent Vegetation
More chronic in small bay areas coinciding with high boat traffic.
Often associated with stripping of larger cobble beaches.
![Page 14: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/14.jpg)
Abandoned Docks
Most occurrences in Mara Lake, Salmon Arm – Arm and Seymour Arm. Often associated with Squatter sites.
![Page 15: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/15.jpg)
2011-12 Site Restoration Completed Example
Removal of concrete boat ramp from Crown Land and restoration of
natural foreshore
![Page 16: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/16.jpg)
Before
![Page 17: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/17.jpg)
Before
![Page 18: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/18.jpg)
After
![Page 19: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/19.jpg)
During
![Page 20: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/20.jpg)
During
![Page 21: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/21.jpg)
During
![Page 22: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/22.jpg)
During
![Page 23: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/23.jpg)
During
![Page 24: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/24.jpg)
During
![Page 25: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/25.jpg)
During
![Page 26: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/26.jpg)
During
![Page 27: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/27.jpg)
During
![Page 28: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/28.jpg)
2011-12 Site Restoration Completed Example
Removal of groyne/fireplace on Crown Land and restoration of
natural foreshore
![Page 29: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/29.jpg)
Before
![Page 30: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/30.jpg)
During
![Page 31: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/31.jpg)
During
![Page 32: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/32.jpg)
After
![Page 33: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/33.jpg)
Next Steps
§ Phase 2 of shoreline restorations planned for late summer/fall 2012
![Page 34: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/34.jpg)
Sicamous Narrows Inventory Project
Keith Weir, BC Ministry of Forests, Lands and Natural Resource OperaDons
![Page 35: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/35.jpg)
![Page 36: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/36.jpg)
What is the Project?
• An inventory of all commercial/strata marinas, private docks and uDlity sites.
• InformaDon collected will focus on safety, environmental and social issues related to these works.
![Page 37: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/37.jpg)
Why?
• Data gathered may be used for various purposes:
1. To check for consistency with Sicamous Narrows management plan and legal documents authorizing the use and occupaDon of Crown land
2. Evaluate impacts to the environment. 3. Aid in future management strategies.
![Page 38: SLIPP All-Committee Meeting: Shoreline Update 12-April-2012](https://reader033.fdocuments.us/reader033/viewer/2022060204/559f64bd1a28aba0378b4657/html5/thumbnails/38.jpg)
Next Steps
• Consolidate informaDon gathered in the field. • Develop strategy, based on idenDfied impacts. • Present SLIPP Steering CommiVee with findings and recommendaDons.
• Implement strategy to address idenDfied issues.