Slide Set 2 PwC Mark Hughes
-
Upload
lorik-haxhiu -
Category
Documents
-
view
224 -
download
1
description
Transcript of Slide Set 2 PwC Mark Hughes
PricewaterhouseCoopers LLP
Kosova e Re Power Plant ProjectOverview of the Opportunity & Pre-Qualification
PricewaterhouseCoopers LLPJanuary 2010
Slide 3Kosovo Lignite Power
Kosovo Power Supply / Demand Balance
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Year
Annu
al M
Wh
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
Kosovo A Kosovo B HPP Ujman HPP Zhur Small HPPs Import / New generation requirement Domestic demand
Introduction to the Kosova Energy StrategyPower demand growth and existing supply
Kosovo A
Kosovo BHPPs
Rehabilitation of Kosovo B
PricewaterhouseCoopers LLPJanuary 2010
Slide 4Kosovo Lignite Power
Introduction to the Kosova Energy StrategyLignite resources: Sibovc versus other European Coal Mines
PricewaterhouseCoopers LLPJanuary 2010
Slide 5Kosovo Lignite Power
The Lignite Power ProjectKey studies
Study / Task Date CompletedPreparation of a Mid Term Plan for the Development of Existing Coal Mines and a Main Mining Plan for the new Sibovc Mine June 2005
Pre-feasibility studies for new power plant and pollution mitigation measures in Kosovo B [Jaakko Pöyry Group Oyj] February 2006
Preparation of complementary mining plan for Sibovc south west lignite mine [STEAG AG] May 2006
Studies to support the development of new generation capacities and related transmission [Poyry, Terna, Cesi, Decon] September 2007
Water Supply from the Iber Lepenc Hydro System for the Proposed Kosovo C Power Plant [COWI, BCEOM, Enviros, Exergia, Tractebel]
November 2007
Strategic Environmental and Social Assessment Report [ERM] May 2008
Kosovo B Rehabilitation feasibility study [PA Consulting] [March/April] 2010
PricewaterhouseCoopers LLPJanuary 2010
Slide 6Kosovo Lignite Power
The Lignite Power transactionProject Components (as reconfigured)
A. Construction of a new electric power generation plant, ‘Kosova e Re Power Plant’ (“KRPP”)- Estimated installed initial capacity of 500 MW- Possibility of expanding up to 1000 MW- Limited associated interconnection facilities
B. Immediate development of the Sibovc Lignite Field to supply existing plant and KRPP
C. Private sector participation in Kosova B
PricewaterhouseCoopers LLPJanuary 2010
Slide 7Kosovo Lignite Power
The Lignite Power transactionPrequalification – minimum criteria for consortia
• Arranged financing for an independent power and/or mining project with a financing amount (debt plus equity) of at least €800 million.
• Managed the development of:- an open-cast mine of at least 8 million tonnes/yr of coal or lignite production;
and- a coal- or lignite-fired independent power project of at least 600 MW gross
electric power generating capacity.• Served as the lead construction entity in at least two projects of a similar
nature and complexity as the components of the Project that have been completed since 2000 and have operated successfully for at least 18 months; and- (A) operated an open-cast mine of at least 5 million tonnes/yr production for at
least 3 years since 2004; and- (B) operated coal or lignite fuelled power generation capacity of at least
2000MW (at a single or in aggregate across multiple locations) for at least 3 years since 2004.
PricewaterhouseCoopers LLPJanuary 2010
Slide 8Kosovo Lignite Power
The Lignite Power transactionPrequalification – deadline & evaluation
Deadline: 1700 hours (Pristina time) on 29 January 2010
Evaluation for shortlisting:
Scoring Criteria Max. Points AvailableFinancial Capacity – finance raising experience 15Development Management Experience - mining 10Development Management Experience - generation 10Construction Experience – similar projects 15O&M Experience – Mining 10O&M Experience – Coal/Lignite Generation 10Financial Standing 15Bidder/Consortium Structure 15
PricewaterhouseCoopers LLPJanuary 2010
Slide 9Kosovo Lignite Power
The Lignite Power transactionProposed timescale
29 January 2010
Deadline for receipt of EoIs
February 2010
Announcement of shortlisted bidders
March / April 2010
Publication of Draft Request for Proposals
June 2010
Deadline for responses to
Draft RfP
July 2010
Publication of Final Request for Proposals
September 2010
Receipt of Proposals &
Announcement of preferred bidder