SLAC EPICS Projects

15
Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 1 Stanford Linear Accelerator Center SLAC EPICS Projects Yesteryear, Today, and Tomorrow

description

SLAC EPICS Projects. Yesteryear, Today, and Tomorrow. Present ESD EPICS. PEP-II RF – 8 VXI-based stations Bunch Injection Damping Ring RF – Allen Bradley support Bucket-wise luminosity monitor NLC Test Accelerator – 2 VME IOCs 60/120 Hz pulsed operation PEP-II Tune tracker - PowerPoint PPT Presentation

Transcript of SLAC EPICS Projects

Page 1: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002

1

Stanford Linear Accelerator Center

SLAC EPICS Projects

Yesteryear, Today, and Tomorrow

Page 2: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 2

Present ESD EPICS• PEP-II RF – 8 VXI-based stations• Bunch Injection • Damping Ring RF – Allen Bradley support

• Bucket-wise luminosity monitor• NLC Test Accelerator – 2 VME IOCs

— 60/120 Hz pulsed operation • PEP-II Tune tracker

• Other SLAC EPICS Projects— Longitudinal Feedback – John Fox’s group— SPEAR III upgrade (Ongoing)— BaBar – Slow control – many IOCs.

Page 3: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 3

EPICS Tools and Applications

• StripTool is now a sine qua non of the control room

• Channel Archiver being mated to Oracle for speed and flexibility

• VDCT (newest Database Configuration Tool) now treated as a reliable tool.

• EDM (newest Display Manager) now available at SLAC for test

• Alarm Handler in use• Strong core of EPICS developers, growing as we

speak.

Page 4: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 4

Fill and luminosity data

Page 5: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 5

NLC Test Acc. Upgrade

• Veetest & Labview ( ½ Hertz)• EPICS replacement

— Two new IOCS— 60 Hz RF control

• Scanning ADC fault data• Complex subroutine records

Page 6: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 6

PEP-II Tune Tracker

Page 7: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 7

ESD EPICS Devices

• Allen Bradley – DCM-based

• GPIB – ethernet LAN and Industry Pack

• Shared Memory – Bit3

• Many SLAC-specific RF VXI-based modules

• CAMAC hardware and drivers from TJNAF

• VSAM (Slow analog)– BaBar and NLCTA

• ADC, TDC, DAC, Dig. I/O – NLC Test Accelerator

Page 8: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 8

Current ESD Epics Projects

• NLC 8-Pack Support (Due end of Autumn)— Next Step for the NLC Test Accelerator— New ADCs, RF Control

• General GPIB support (Wishlist)— Replacing HPUX-based GPIB support

• PEP-II RF upgrade (Due end of Summer)— More RF stations, enhanced VXI RF modules

Page 9: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 9

Current EPICS Plans• Upgrade PEP-II RF IOCs from niCpu030 to PPC

VXI Controllers• Move all production to 3.13.6 during the

summer• Provide SNL/SEQ support• Continue to coordinate SLAC-wide EPICS• Look seriously at RTEMS• Switch to VDCT• Keep abreast of 3.14 readiness• Provide SLAC EPICS training

Page 10: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 10

Linear Coherent Light Source

• Just passed CD-1 Lehman review• SLAC/LLBL/LLNL/Argonne collaboration• 270 Million dollar project• Construction start 2006/ready 2008

— When do we get first real money?• EPICS to be used wherever reasonable

Page 11: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 11

Page 12: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 12

Linac CenterLine

LCLS Injector Parts

QE02

Transverse RFCavity

WS2/OTR5/BPM8

OTR6 WS4

BPM7/WS1/OTR4

CM3/BPM4/OTR2

OTR3,BPM6

OTR1

BPM2CM2

BPM7/OTR7

Valve

SC4

WS3/CM4

Sector 20-8BSector 20-8A BeamStopper

D. DowellX2494

March 27, 2002

SC2

S2

SC3

SC5

BPM9

RF Gun

L0 Accelerators

SC7

EO2/SC6/BPM5

BPM3

Valve

SC8

SC9V

SC9H SC10

5.00m.

Scale:

RadiationShielding

BPM11/OTR9

BPM10

QE01

QE03QE04

StraightAhead

Spectrometer

Tune-upDump/

Faraday Cup

OTR10/BPM12/CM6

SC11

OTR11/BPM13

QM01

QM02

QB

QM03&QM04

Page 13: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 13

LCLS Injector in EPICS

SLC Timing Injector IOC

Klystron 1

Klystron N

MPGBeam CodesBGRPSEtc.

Timing slave to SLCTiming master forKlystron IOCs

Evaluate APS / SNStiming systems

All Klystrons either fully SLC or fullyEPICS!

ANL EPICSfor Undulator

Page 14: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 14

LCLS Site PlanLCLS Site Plan

Page 15: SLAC EPICS Projects

Ron Chestnut EPICS Collaboration Mtg May 21-23, 2002 15

LCLS Undulator Controls• Supplied by Argonne APS - lock, stock, and barrel

— Employs and extends designs from LEUTL (Low Energy Undulator Test Line)

— All EPICS, 16 VME IOCs• Argonne and SLAC EPICS groups will coordinate efforts during the

whole project— Timing— Machine Protection— Networking— Global Feedbacks— EPICS Details

• VME Crates, CPU types• Naming Convention• Database and screen design

— Commissioning and integration