    Unit-3

    T-beam bridge

  • 7/23/2019 Slab girder bridge

    2/42

    Most commonly adopted type Span range 10 to 25 m

    Deck slab cast monolithically with girders

    Types of T-beam bridge

    1.Slab girder bridge

    No cross beams Slab design as a one way slab Does not possess mch torsional rigidity This type is not adopted in recent designs

  • 7/23/2019 Slab girder bridge

    3/42

    2. T-beam bridge With diaphragms

    Diaphragms connecting the longitdinal girders

    !t do not e"tend p to the slabSlab remain beha#es as an one way slab$reater torsional rigidity than the girder-slab type

  • 7/23/2019 Slab girder bridge

    4/42

    3. T-beam bridge With cross beam

    %ast monolithically with desk slab Slab design as a two way slab Slab thickness redces Dead load on longitdinal girder redce !etter load distribtion on longitdinal girders &ncrease spacing of longitdinal girders 'ence less nmber of girders %ost redce

  • 7/23/2019 Slab girder bridge

    5/42

    No crossbeam

    Withdiaphragm

    With crossbeam

    de(ection 100) *+) ,)

    .oad distribtion /oor !etter best

    ltimate loadcapacity

    100) 12) 1,2)

    iment investigation was conducted under the supervision o th

  • 7/23/2019 Slab girder bridge

    6/42

    #omponents o a T-$eam$ridge

    1 Deck slab2 %antile#er portion ootpaths 3 if pro#ided4kerbs and handrails+ .ongitdinal girders5 %ross beam or diaphragms

    , earing corse

  • 7/23/2019 Slab girder bridge

    7/42

    Some standard details

    6erb #ary from +*5 mm to ,00 mmearing corse thickness for asphaltic concrete -5, mm for cement concrete-*5 mootpaths abot -15 m

    Number and spacing o main girders

    Three girders applicable for two-lane carriage way of *5 m width or girders for 12 m width

    .ateral spacing of the longitdinal girders will a7ect the cost of the bridge Three girders system is sally more economic than a for girder system foa bridge width of 8* m

    #ross-beam%ross beam are pro#ided mainly to sti7en the girders and to redce torsion in

    9"terior girders

  • 7/23/2019 Slab girder bridge

    8/42

    !esign components

    1 Deck slab

    2 9nd longitdinal girder &ntermediate longitdinal girder+ 9nd cross beam5 &ntermediate cross beam, %antile#er portion

    Design steps* Design data8 !M de to dead load: !M de to li#e load10 Design !M11 Main reinforcement12 Distribtion reinforcement

  • 7/23/2019 Slab girder bridge

    9/42

  • 7/23/2019 Slab girder bridge

    10/42

  • 7/23/2019 Slab girder bridge

    11/42

  • 7/23/2019 Slab girder bridge

    12/42

  • 7/23/2019 Slab girder bridge

    13/42

  • 7/23/2019 Slab girder bridge

    14/42

  • 7/23/2019 Slab girder bridge

    15/42

  • 7/23/2019 Slab girder bridge

    16/42

  • 7/23/2019 Slab girder bridge

    17/42

  • 7/23/2019 Slab girder bridge

    18/42

  • 7/23/2019 Slab girder bridge

    19/42

  • 7/23/2019 Slab girder bridge

    20/42

  • 7/23/2019 Slab girder bridge

    21/42

  • 7/23/2019 Slab girder bridge

    22/42

  • 7/23/2019 Slab girder bridge

    23/42

  • 7/23/2019 Slab girder bridge

    24/42

  • 7/23/2019 Slab girder bridge

    25/42

  • 7/23/2019 Slab girder bridge

    26/42

  • 7/23/2019 Slab girder bridge

    27/42

  • 7/23/2019 Slab girder bridge

    28/42

  • 7/23/2019 Slab girder bridge

    29/42

  • 7/23/2019 Slab girder bridge

    30/42

    ma"imm !M nder any wheel load occrs when the center of the span is miween the %$ of load system and the wheel load nder consideration

  • 7/23/2019 Slab girder bridge

    31/42

  • 7/23/2019 Slab girder bridge

    32/42

  • 7/23/2019 Slab girder bridge

    33/42

  • 7/23/2019 Slab girder bridge

    34/42

  • 7/23/2019 Slab girder bridge

    35/42

    2

  • 7/23/2019 Slab girder bridge

    36/42

  • 7/23/2019 Slab girder bridge

    37/42

  • 7/23/2019 Slab girder bridge

    38/42

    !o" cl#ertlvertis a strctre that allows water to (ow nder a road4 railroad4 trail4 or simiction from one side to the other side Typically embedded so as to be srronil4 a cl#ert may be made from a pipe 4 reinforced concrete or other material

  • 7/23/2019 Slab girder bridge

    39/42

    omponents of bo" cl#ertTop slab

    Side walls!ottom slab

  • 7/23/2019 Slab girder bridge

    40/42

    sign .oads

    oncentrated loadsniform Distribted load

    eight of side wallsater pressre inside walls

    9arth pressre on =ertical Side wallniform .ateral .oad on Side alls