Overview of SK Corporation

Establishment October 1962

Asset 14.9 Billion US$ (2004)

Employees 4950 Persons

Sales 17.4 Billion US$ (2004)

Business

Areas

Oil Exploration & Production

Petroleum Refining

Chemicals

Gas, Coal, Lubricants

Technology Business

New Business ( Online / Offline )

SK Corp’s highly

integrated Ulsan

Complex is one of

the largest

single-site refinery

in the world, having

refining capacity of

840,000 bpsd.

G050060 Template4HydroSympo

3

History of SK’s Lube Base Oil Production

#1 LBO Plant

• 1995: Commissioned #1 LBO Plant, Hydroprocessing-based, Conventional MLDWincluded SK UCO Lube Process Technology

• 1997: Revamped to ISODEWAXING/HydrofinishingUnit with ICR 408/407, Better Yield and Quality

• 2003: Applied New ISODEWAXING Catalyst of ICR 422, Better Yield and Quality

CDW ICR 408 ICR 422

Yield, LV % Base +20 +23

Viscosity Index Base +10 +12

G050060 Template4HydroSympo

4

History of SK’s Lube Base Oil Production

#2 LBO Plant

• 2004: Commissioned #2 LBO Plant, Hydroprocessing-based, included SK UCO Lube Technology

• 2004: Increased Throughput by 20%

• 2005~6: Planned to Revamp

G050060 Template4HydroSympo

5

Application of Two LBO Plants

LPG

Naphtha

Diesel

Kerosene

Vac.

Distill

Fuels

HCK

#1 CDWVac.

Distill

#2 CDW

UCO

Vac.Distill

70D

100D

150D

70D

100D

150D

250D

Yubase

3,4,6,8

AR

VGO

#2 LBO Plant

G050060 Template4HydroSympo

6

Overview of 2nd LBO Project

Project Period August, 2002~ June, 2004(23 months)

Mechanical Completion : May 20, 2004

100% Operation : June 29,2004

Capital Investment US$ 120 Million

Vac. Distillation Unit

Catalytic Dewaxing Unit

Utilities and Offsite & Tankage

Project Target Fast-Track Schedule

Quality and Safety

Cost Saving

G050060 Template4HydroSympo

7

2nd LBO Project

• Fast Track Schedule

– Involvement of Experienced Process Engineers from Planning to Start-up

– Speedy Decision Making based on SK’s Accumulated Technology and Experience

– Early Freezing of Process & Basic Engineering

– Early Purchasing of Long-Delivery Equipment

– Utilization of 3D Model Design

– Optimization of Precom. & Commissioning Activities

– Dramatic Savings of Document Approval Period

G050060 Template4HydroSympo

8

• Quality and Safety

– Reflected Experienced Data and Procedure of 1st LBO Project in Design, Procurement, Construction, and Start-up Operation

– Audited Major Engineering Design Results by 3rd Party

– Crosschecked Design Quality between CDW Licensor and Basic Engineering Co.

– Dispatched Resident Experts to Manufacturing Shop of Major Equipment Vendors

– Strengthened Safety Mind and Behavior through Periodic Safety Committee

– Double Checked High Pressure Welding Qualities

2nd LBO Project

G050060 Template4HydroSympo

9

2nd LBO Project

• Cost Saving

– Minimized Spare Parts and Bump Factor by 3D Model Design and SK’s Experience

– Minimized Trial and Errors from #1 LBO Experience

– Optimized Design by Removing Unnecessary Items

– Optimized Precom. & Commissioning Activities

– Purchased Major Equipment Economically

G050060 Template4HydroSympo

10

Start-up Performance

Description Planned Actual

Throughput, B/D 7,000 7,000

Reactor Temperature, Deg. C

- Isodewaxing

- Hydrofinishing

350

232

360

232

Lube Product Yield, % Base +2.0

Product Quality

- Viscosity Index Base Base +1

Any Bottlenecked Items

- Towers- Heaters and H-exchangers- Rotating Machine- Utilities

None

G050060 Template4HydroSympo

11

Summary of 2nd LBO Project

Description Planned Actual

Fast-Track Schedule

EPC Schedule, months

Commissioning and Start-up, months

26

3

21.7

1.3

Quality and Safety

Number of Accidents Consecutive No Accidents Recorded, MH

-

-

None

2,950,000

Cost

Cost Saving, % of TIC 5 22

Capacity, B/D * 7,000 8,400

Product Yield and Quality Base Better

* Feed rate was increased within one month after start-up.

G050060 Template4HydroSympo

12

• Design Review

– CLG reviewed all important design documents related to the IDW unit.

– CLG assisted conformity check of equipment and plant.

• Catalyst Selection

– SK and CLG did joint testing for catalyst selection .

• Start-up Assistance

– CLG supported technical services for start-up.

Success through Partnership with CLG

G050060 Template4HydroSympo

13

Pictures of #1 & #2 LBO Plants

G050060 Template4HydroSympo

14

• SK challenges CLG to improve lube quality/yield further by developing next-generation ISODEWAXING and ISOFINISHING catalysts.

• SK/CLG’s driving forces to improve lube qualities are now extending to the Hydrocracking catalysts.

• SK/CLG collaborate on validation of new technology and ideas in Hydroprocessing chain related to lube base oil production.

Future Partnership with CLG