5 Place the supplied pressure treated skid joists onto the foundation as shown in Figure “3”. Cinder block foundation is shown, pier foundation uses the same skid locations. If using piers, nail as shown in Figure “4”. 2 Five (5) - 4'' x 6'' x 15' Skids 210.75 210.75 Middle skid is off center for electrical wiring Figure “3” 6'' 4''x6'' skids toe screwed to 2''x12'' with 2-1/2'' screws. For additional wind loads, tie down straps can be used. Skid 2''x12'' Figure “4” 39'' 79-1/2'' 155'' 116'' Stainless Steel Screw

Transcript of Skids

Page 1: Skids

5

Place the supplied pressure treated skid joists onto the foundation as shown in Figure “3”. Cinderblock foundation is shown, pier foundation uses the same skid locations. If using piers, nail as

shown in Figure “4”.

2

Five (5) - 4'' x 6'' x 15' Skids

210.75210.75Middle skid isoff center forelectrical wiring

Figure “3”

6''

4''x6'' skids toe screwed to 2''x12'' with 2-1/2'' screws.For additional wind loads, tie down straps can be used.

Skid

2''x12''

Figure “4”

39''

79-1/2''

155''

116''

Stainless Steel Screw