Six Sigma Management
![Page 2: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/2.jpg)
Contents :
• Six Sigma : An Overview• What is Six Sigma?• Why Six Sigma?• Six Sigma Phases : Define, Measure, Analyze, Improve and
Control• Tools and Key Roles for Six Sigma
![Page 3: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/3.jpg)
Why Six Sigma?
![Page 4: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/4.jpg)
What is Sigma ?
Sigma A term used in statistics to represent
standard deviation, an indicator of the degree of variation in a set of a process
![Page 5: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/5.jpg)
What is Six Sigma?
Six Sigma
A statistical concept that measures a process in terms of defects – at the six sigma level, there
3.4 defects per million opportunities
A philosophy and a goal : as perfect as practically possible
A methodology and a symbol of quality
![Page 6: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/6.jpg)
Sigma Level
Sigma Level (Process
Capability)
Defects per Million Opportunities
2 308,537
3 66,807
4 6,210
5 233
6 3.4
![Page 7: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/7.jpg)
Administration
Field of Application
Six Sigma = 99,9997%Six Sigma Methods
Management
HRM IT
Production
Purchase
DesignService
Quality Department
![Page 8: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/8.jpg)
Why Six Sigma?
Money
Customer Satisfaction
Growth
Quality
CompetitiveAdvantage
Employee Pride
![Page 9: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/9.jpg)
• At GE, Six Sigma added more than $ 2 billion to the bottom line in 1999 alone
• Motorola saved more than $ 15 billion in the first 10 years of its Six Sigma effort
• AlliedSignal reports saving $ 1,5 billion through Six Sigma.
Why Six Sigma?
![Page 10: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/10.jpg)
Why Six Sigma?
Six Sigma is about practices that help you eliminate defects and always deliver products
and services that meet customer specifications
![Page 11: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/11.jpg)
Cost of Poor Quality
What is cost of scrap?
What is cost of rework?
What is cost of excessive cycle times and delays?
![Page 12: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/12.jpg)
Cost of Poor Quality
What is cost of business lost because customers are dissatisfied with your products or services?
What is cost of opportunities lost because you didn’t have time or the resources to take advantage of them?
![Page 13: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/13.jpg)
Critical-to-Quality (CTQ)
Elements of a process that significantly affect the output of that process. Identifying these elements is figuring out how to make improvements that can dramatically reduce costs and enhance quality.
![Page 14: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/14.jpg)
Companies Implemented Six Sigma
o 3Mo Air Canadao Amazon.Como Bank of Americao Boeingo Caterpillar, Inc.o Corningo Dello DHLo Eastman Kodak Companyo Fordo General Electric
o GlaxoSmithKlineo HSBC Groupo LG Groupo Motorolao Samsung Groupo Siemens AGo McGraw-Hill Companieso US Air Force, US Navy, US Marine Corps o Vodafoneo Whirlpoolo Xerox
![Page 15: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/15.jpg)
Six Sigma Phases
![Page 16: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/16.jpg)
Define Measure Analyze
Improve
Control
Six Sigma Phases
D M A I C
![Page 17: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/17.jpg)
Define
Measure
Analyze
Six Sigma Phases
Define the project goals and customer (internal and external) deliverables
Measure the process to determine current performance
Analyze and determine the root cause(s) of the defects
![Page 18: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/18.jpg)
Improve
Control
Six Sigma Phases
Control future process performance
Improve the process by eliminating defects
![Page 19: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/19.jpg)
Six Sigma Phases
Define
• Define Customers and Requirements (CTQs)• Develop Problem Statement, Goals and Benefits• Identify Champion, Process Owner and Team• Define Resources• Evaluate Key Organizational Support• Develop Project Plan and Milestones• Develop High Level Process Map
![Page 20: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/20.jpg)
Six Sigma Phases
Measure
• Define Defect, Opportunity, Unit and Metrics• Detailed Process Map of Appropriate Areas• Develop Data Collection Plan• Validate the Measurement System• Collect the Data• Begin Developing Y=f(x) Relationship• Determine Process Capability and Sigma Baseline
![Page 21: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/21.jpg)
Six Sigma Phases
Analyze
• Define Performance Objectives• Identify Value/Non-Value Added Process Steps• Identify Sources of Variation• Determine Root Cause(s)• Determine Vital Few x's, Y=f(x) Relationship
![Page 22: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/22.jpg)
Six Sigma Phases
Improve
• Perform Design of Experiments• Develop Potential Solutions• Define Operating Tolerances of Potential System• Assess Failure Modes of Potential Solutions• Validate Potential Improvement by Pilot Studies• Correct/Re-Evaluate Potential Solution
![Page 23: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/23.jpg)
Six Sigma Phases
Control
• Define and Validate Monitoring and Control System• Develop Standards and Procedures• Implement Statistical Process Control• Determine Process Capability• Develop Transfer Plan, Handoff to Process Owner• Verify Benefits, Cost Savings, Profit Growth• Close Project, Finalize Documentation• Communicate to Business, Celebrate
![Page 24: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/24.jpg)
Define Measure Analyze Improve Control
Deliverables :• Fully trained team is formed, supported, and committed to work on
improvement project. • Team charter developed, customers identified and high impact
characteristics (CTQs) defined, business process mapped.
![Page 25: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/25.jpg)
Checkpoints for Readiness
Team Readiness :• Team is sponsored by a champion or business leader. • Team formed and team leaders assigned. • Improvement team members fully trained on Six Sigma and DMAIC.
Define Measure Analyze Improve Control
Team Charter :• Completed project management charter, including business case, problem
and goal statements, project scope, milestones, roles and responsibilities, communication plan.
![Page 26: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/26.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Customers• Customer(s) identified and segmented according to their different needs
and requirements.• Data collected and displayed to better understand customer(s) critical needs
and requirements.
Business Process Mapping• Completed, verified, and validated high-level 'as is' (not 'should be' or 'could
be') business process map.• Completed SIPOC representation, describing the Suppliers, Inputs, Process,
Outputs, and Customers.
![Page 27: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/27.jpg)
Define Measure Analyze Improve Control
Deliverables :• Key measures identified, data collection planned and executed, process
variation displayed and communicated, performance baselined, sigma level calculated.
![Page 28: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/28.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Key Measures Identified• Key measures identified and agreed upon.• High impact defects defined and identified in the business process.
Data Collection Planned and Executed• Solid data collection plan established that includes measurement
systems analysis.• Data collected on key measures that were identified.
![Page 29: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/29.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Process Variation Displayed/Communicated• Process variation components displayed/communicated using
suitable charts, graphs, plots.• Long term and short term variability accounted for.
Performance Baseline/Sigma Calculation• Measure baseline process performance (capability, yield, sigma
level).
![Page 30: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/30.jpg)
Define Measure Analyze Improve Control
Deliverables :• Data and process analysis, root cause analysis, quantifying the
gap/opportunity.
![Page 31: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/31.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Data and Process Analysis• Identify gaps between current performance and the goal performance.
Root Cause Analysis• Generate list of possible causes (sources of variation).• Segment and stratify possible causes (sources of variation).• Prioritize list of 'vital few' causes (key sources of variation).• Verify and quantify the root causes of variation.
![Page 32: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/32.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Quantifying the Gap/Opportunity• Determine the performance gap.• Display and communicate the gap/opportunity in financial terms.
![Page 33: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/33.jpg)
Define Measure Analyze Improve Control
Deliverables :• Generate (and test) possible solutions, select the best solutions, design
implementation plan.
![Page 34: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/34.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Generating (and Testing) Possible Solutions• Possible solutions generated and tested.
![Page 35: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/35.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Selecting The Best Solution(s)• Optimal solution selected based on testing and analysis.• New and improved process ('should be') maps developed.• Cost/benefit analysis of optimal solution(s).• Small-scale pilot for proposed improvement(s). • Pilot data collected and analyzed.• Improved process ('should be') maps modified based on pilot data and
analysis.• Project impact on utilizing the best solution(s).
![Page 36: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/36.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Designing Implementation Plan• Solution implementation plan established, including schedule/work
breakdown structure, resources, risk management plan, cost/budget, and control plan.
• Contingency plan established.
![Page 37: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/37.jpg)
Define Measure Analyze Improve Control
Deliverables :• Documented and implemented monitoring plan, standardized process,
documented procedures, response plan established and deployed, transfer of ownership (project closure).
![Page 38: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/38.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Monitoring Plan• Control plan in place for sustaining improvements (short and long-term). Process Standardization• New process steps, standards, and documentation are ingrained into
normal operations.
Documented Procedures• Operating procedures are consistent.• Knowledge gained on process is shared and institutionalized.
![Page 39: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/39.jpg)
Define Measure Analyze Improve Control
Checkpoints for Readiness
Response Plan• Response plans established, understood, and deployed. Transfer of Ownership (Project Closure)• Transfer ownership and knowledge to process owner and process team
tasked with the responsibilities.
![Page 40: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/40.jpg)
Tools and Roles for Six Sigma
![Page 41: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/41.jpg)
• Creating flowcharts of the step in a process – operations, decision points, delays, movements, handoffs, rework,
loops, and controls or inspections. • A process map is illustrated description of how a process
work.
Tools for Six Sigma
Process Mapping
![Page 42: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/42.jpg)
• DOE is a structured, organized method for determining the relationship between factors (Xs) affecting a process
and the output of that process (Y).
Tools for Six Sigma
Design of Experiments or
DOE
![Page 43: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/43.jpg)
• A group of rows and columns, with one set of increments marked along the X (horizontal) axis and another set of
increments marked along the Y (vertical) axis. • The purpose of using XY matrix is to study and understand
the relationship between what you are putting into a process and what your customer is getting out of it.
• The XY matrix allows the team to identify gaps, areas for improvement.
Tools for Six Sigma
XY Matrix
![Page 44: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/44.jpg)
Technical Skills
Soft Skills
StatisticiansMaster Black
Belts
Black Belts
Quality Improvement Facilitators
BBMBB
![Page 45: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/45.jpg)
• The goal of this tool is to ensure that your measurement system is statically confident – that it’s both accurate and
precise each and every time it is used. • Undertaken during Measure phase, your MSA determines
whether or not you can take a certain measurement and repeat or reproduce it among different people who take
the same measurement.
Tools for Six Sigma
Measurement System Analysis
![Page 46: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/46.jpg)
• Process capability tool is the measure of a process being able to meet specification requirements and fulfill
customer CTQ needs on a long term basis.
Tools for Six Sigma
Process Capability Tool
![Page 47: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/47.jpg)
• Investigating a theory about the suspected cause (s) of a particular effect in a process to determine if it is correct. • It’s a compass that points you directly to the vital few
factors that are most affecting your process.
Tools for Six Sigma
Hypothesis Testing
![Page 48: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/48.jpg)
• The manner in which a part or process can fail to meet a specification, creating a defect or non-conformance, and
the impact on the customer if that failure mode is not prevented or corrected.
Tools for Six Sigma
Failure Mode Effect Analysis
![Page 49: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/49.jpg)
• A detailed assessment and guide for maintaining all the positive changes you, your black belt, and the project
team have made. • It ensures that all your analysis and efforts stay in effect
and that you have information at your disposal to prevent backsliding or a return to less than optimal performance
standard.
Tools for Six Sigma
Control Plan
![Page 50: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/50.jpg)
Champions Are responsible for the Six Sigma implementation across the organization in an integrated manner. Champions also act as mentor to Black Belts.
Includes CEO and other key top management team members. They are responsible for setting up a vision for Six Sigma implementation.
Key Roles for Six Sigma
Executive Leadership
![Page 51: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/51.jpg)
Black Belts Operate under Master Black Belts to apply Six Sigma methodology to specific projects. They primarily focus on Six Sigma project execution.
Identified by champions, act as in-house expert coach for the organization on Six Sigma. They devote 100% of their time to Six Sigma.
Key Roles for Six Sigma
Master Black Belts
![Page 52: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/52.jpg)
Are the employees who take up Six Sigma implementation along with their other job responsibilities. They operate under the guidance of Black Belts and support them in achieving the overall results.
Key Roles for Six Sigma
Green Belts
![Page 53: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/53.jpg)
Six Sigma Do’s
• Do communicate the commitment company-wide
• Do demonstrate the commitment of company leaders
• Do empower your key human resources
• Do provide on-site mentoring for black belts
![Page 54: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/54.jpg)
Six Sigma Do’s
• Do be patient at the inception of you six Sigma initiative
• Do claim and advertise early “wins”
• Do benchmark
• Do establish project baseline and goals
![Page 55: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/55.jpg)
Recommended Further Readings:
1. Greg Brue, Six Sigma for Managers, McGraw Hill
2. George Eckes, Six Sigma for Everyone, John Wiley and Sons
![Page 56: Six sigma](https://reader036.fdocuments.us/reader036/viewer/2022062702/55491e79b4c9059f4c8b6d36/html5/thumbnails/56.jpg)