Six Recommendationsfor Dock C Project…
Dock C Public WorkshopMay 16, 2013
![Page 2: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/2.jpg)
1. Carefully Consider All Viewpoints
![Page 3: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/3.jpg)
Viewpoints Include:
1. Current Slipholders
2. Coronado Taxpayers
3. San Diego Boating Community
4. Promenade Park Users
5. Glorietta Bay Users
6. Unified Port of San Diego
![Page 4: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/4.jpg)
2. Review Moffatt and Nichol Report
• Complete dock replacement not required.
![Page 5: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/5.jpg)
Engineering Assessment
![Page 6: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/6.jpg)
Moffatt and Nichol Report says:
• Structure, pilings, gangway, platform, hardware, electrical—all good condition.
• Deck boards—worn, but easily replaced.
![Page 7: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/7.jpg)
3. Consider Structural Refit
• as recommended in Moffatt and Nichol Report
![Page 8: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/8.jpg)
Moffatt & Nichol Recommendation
• Structural Refit $200,000 - $300,000– Tighten bolted connections– Recondition brackets– Replace decking– Consider IPE wood– 20 year+ service life…
![Page 9: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/9.jpg)
IPE Deck Boards – Very Attractive
![Page 10: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/10.jpg)
IPE Deck Board Properties
• Beautiful
• Strong
• Smooth
• Long-lasting
• Insect-resistant
![Page 11: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/11.jpg)
Structural Refit Benefits
• $300,000 instead of $3,000,000
• No loss of “rentable linear feet”
• Minimal regulatory approvals necessary
• Beautiful IPE wood instead of concrete
• Indefinite lifespan with proper maintenance– (Coronado Yacht Club has always had wood
docks)
![Page 12: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/12.jpg)
4. Preserve Open Water
• Important to active Glorietta Bay users
![Page 13: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/13.jpg)
![Page 14: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/14.jpg)
City of Coronado slide. Area in purple is reportedly designated as
“Developable Water Area” in Coronado’s “Local Coastal Plan.”
![Page 15: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/15.jpg)
Coronado LCP should match Port Plan.
However, the same area is designated “Open Bay” in the Port of San Diego “Precise Plan” for
Glorietta Bay.
![Page 16: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/16.jpg)
5. Do Not Obstruct Promenade Park View
• Open Water views of Glorietta Bay are obstructed from the yacht club to the swimming pool, except at Promenade Park…
![Page 17: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/17.jpg)
The ONLY remaining Open Water view is from Promenade Park…
![Page 18: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/18.jpg)
6. Include a Public Dock
• Glorietta Bay is an ideal location
![Page 19: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/19.jpg)
Public Dock Uses
• Access to the water for individuals– From Promenade Park
• Small boats– kayaks, rowboats, Sabots, etc– dinghies from A5 anchorage boats
• Visiting yachts – Passenger drop-off and pick-up– access to Coronado / business district– “dock and dine” etc– Overnight stays - for a reasonable fee
![Page 20: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/20.jpg)
Public Dock Location?
At this “indentation” in the Promenade Park seawall?
![Page 21: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/21.jpg)
Newport Beach has 11 public docks…
![Page 22: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/22.jpg)
Public Access to the water is a good thing!
![Page 23: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/23.jpg)
Burton Chace Park, Marina del Rey
![Page 24: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/24.jpg)
A Public Dock can be attractive!
![Page 25: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/25.jpg)
Summary
• Structural Refit
• IPE wood
• Public Dock
![Page 26: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/26.jpg)
Good From All Viewpoints?
1. Current Slipholders• Might appreciate structural refit with IPE
decking?
2. Coronado Taxpayers• Already have $7 million in marina assuming
State does not repay CDA loan• Another $3 million for Dock C is a lot of
money• Structural Refit with proper maintenance
1/10th the cost with much better ROI
![Page 27: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/27.jpg)
3. San Diego Boating Community• Will appreciate a Public Dock, paid for by
Port District?
4. Promenade Park Users• Will appreciate preservation of the park
“View Corridor”
Good From All Viewpoints?
![Page 28: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/28.jpg)
5. Glorietta Bay Users• Will appreciate preservation of open water• Will appreciate a public dock
6. Unified Port of San Diego• Public Dock consistent with Port charter.
Good From All Viewpoints?
![Page 29: Six Recommendations for Dock C Project… Dock C Public Workshop May 16, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062511/551a189355034654788b45c5/html5/thumbnails/29.jpg)
Thank You!