SWMMP Page 1 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 1: Applicant and Project Details (All Developments)
Applicant Details
Application No.
Name
Address
Phone number(s)
Project Details
Address of development
Existing buildings and other structures currently on the site
Description of proposed development
This development achieves the waste objectives set out in City of Ryde DCP. The details on this form are the provisions and intentions for minimising waste relating to this project. All records demonstrating lawful disposal of waste will be retained and kept readily accessible for inspection by regulatory authorities such as Council, Office of Environment and Heritage or WorkCover NSW.
Name
Signature
Date
Demolition and construction of mixed use development comprising supermarket, cafe, business and retail premises and a childcare centre.
221-223 Morrison Road, Putney
SWMMP Page 2 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 2: Demolition (All Types of Developments)
Address of development: _________________________________________________
most favourable least favourable
Reuse Recycling Disposal
Type of waste generated Estimate Volume (m3) or Weight (t)
Estimate Volume (m3) or Weight (t)
Estimate Volume (m3) or Weight (t)
Specify method of on site reuse, contractor and recycling outlet and /or waste depot to be used
Excavation material
Timber (specify)
Concrete
Bricks/pavers
Tiles
Metal (specify)
Glass
Furniture
Fixtures and fittings
Floor coverings
Packaging (used pallets, pallet wrap)
Garden organics
Containers (cans, plastic, glass)
Paper/cardboard
Residual waste
Hazardous/special waste e.g. asbestos (specify)
Other (specify)
221-223 Morrison Road, Putney
10
10 20 Formwork
6 10 Reuse - crushed base
20 10 Reuse - crushed base
10 Builder to specify
4 Builder to specify
4 Builder to specify
SWMMP Page 3 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 3: Construction (All Types of Developments)
Address of development: _________________________________________________
most favourable least favourable
Reuse Recycling Disposal
Type of waste generated Estimate Volume (m3) or Weight (t)
Estimate Volume (m3) or Weight (t)
Estimate Volume (m3) or Weight (t)
Specify method of on site reuse, contractor and recycling outlet and/or waste depot to be used
Excavation material
Timber (specify)
Concrete
Bricks
Tiles
Metal (specify)
Glass
Plasterboard (offcuts)
Fixtures and fittings
Floor coverings
Packaging (used pallets, pallet wrap)
Garden organics
Containers (cans, plastic, glass)
Paper/cardboard
Residual waste
Hazardous/special waste (specify)
221-223 Morrison Road, Putney
3,600Used as fill, builder to specify.
2-4
2 2Crushed roadbase on other sites.
2-4Metal offcuts. Builderto specify
2-4 2-4 Builder to specify
2 2Retain as spares.Crushed recycling.
4-10Return to supplier/shipping company.
4
4
Standard councilrecycling.Standard councilrecycling.
SWMMP Page 4 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 4: Ongoing Operation (Residential, Multi Unit, Commercial, Mixed Use and Industrial)
Address of development: _________________________________________________
Recyclables Compostables Residual waste* Other
Type of Waste and Estimated volumes Paper/
cardboard Metals/ plastics/glass
** Amount generated (L per unit per day)
** Amount generated (L per development per week)
Any reduction due to compacting equipment
*** Frequency of collections (per week)
** Number and size of storage bins required
Floor area required for storage bins (m2)
Floor area required for manoeuvrability (m2)
Height required for manoeuvrability (m)
* Current “non-recyclables” waste generation rates typically include food waste that might be further separated for composting.
** For more information: REFER Schedules under Ryde DCP 2010 Part 7.2 Waste Minimisation and Management for information about bin sizes, numbers and waste generation rates
*** For more information: REFER Council’s website for Waste and Recycling frequency of service information at: www.ryde.nsw.gov.au, or
http://www.ryde.nsw.gov.au/Environment/Waste+and+Recycling
or phone Council’s Customer Service Centre on 9952 8222
221-223 Morrison Road, Putney
130L 130L 260L
Min 1 Min 1 Min 1
6 x 240L 6 x 240L 5 x 1100L
7.5m2 7.5m2 25m2
SWMMP Page 5 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 5: Construction Design (All Types of Developments)
Outline how measures for waste avoidance have been incorporated into the design, material purchasing and construction techniques of the development:
Materials
Lifecycle
-all material will be verified on site measures prior to actual order and keep wastage to minimum.
-reuse off cuts where possible on site.
-excess material to be stored for return to supplier, use on another site or spares.
-where possible, seperate waste for recycling or reuse.
- all materials to be stored safely to avoid damage prior to installation.
SWMMP Page 6 of 6
SITE WASTE MINIMISATION AND MANAGEMENT PLAN (SWMMP)
Section 6: Ongoing Management of Waste (All Types of Development) Detail the arrangements that would be appropriate for the ongoing use of waste facilities as provided in the development. Identify each stage of waste transfer between residents’ units/commercial tenancies and loading into the collection vehicle, detailing the responsibility for and location and frequency of, transfer and collection.
Garbage room at rear of site for private, council and private garbage contractor collection.
Tenants to have internal access to bring garbage to bin storage.
Garbage to be collected on a weekly basis. This is subject to review based on final actual usage.
Garbage room will be locked outside of business.
Garbage room will be checked periodically for damage and vermin.