Other Detail
Door type
Glass
Powder coated jambs Door
Hardware Y / N Type
CS Fitting H/W Y / N Height
Other unknown detail (from above)
Who will finalise:
6011
8 S
ite
Mea
sure
03.
2020
S Back of grooved jamb to wallN Over grooved jambs
P Between the jambs
Q Over flat jambs
M Overall frame / trim width
Door thickness _______ mm
_______ mm
O Cavity depth
T Face of jamb to wall
V Back of flat jamb to wall
R Back of cavity to finished wall
Door thickness _______ mm
U Cavity depth
Sin
gle
Un
it (
Sta
nd
ard
)
Sin
gle
Un
it (
No
Clo
sin
gJa
mb
)
HE
AD
DE
TAIL
WA
LL/J
AM
BS
/HA
ND
ING
PO
CK
ET
DE
TAIL
Date Door location
Customer
Site
Contact
CS Rep CS Internal
Measured from quote SA
Sit
e M
easu
re F
orm
Please contact your rep or your nearest office for job progress enquiries.
SOUNDSTOPBRACEWALL(Indicate ply handing)
PLY PANEL(Indicate ply handing)
X Over grooved jambs
Z Between the jambs
# Over flat jambs
W Overall frame / trim width
Door thickness _______ mm
Bracing panel ply or extra
nogs _________
Bracing panel ply or extra
nogs _________
RH lining
_______mm
LH lining
_______mm Draw handings: Overtaking / ply panels etc.
Jambs set back ________mm
Jambs set back ________mm
Wall
_______mmCavity70 90 140 190 240
Std ArchStd Grooved20 x 20AluSealed SquareStopShadowLine
Circle jamb typeJambs
Std ArchStd Grooved20 x 20AluSealed SquareStopShadowLine
_______ mm
Y Cavity depth
Bi-
Par
tin
g U
nit
Auckland 09 276 0800 Waikato 07 928 0800 Christchurch 03 348 6158 Sydney 02 9905 0588
_______ mm
_____ mm
_____ mm
_____ mm
_____ mm
_______ mm
_______ mm
_______ mm
Site Access
OK Track Off
Site Assembly Hiab
Final Measure
Second Measure Required
This measure is final (once price confirmed)
Ceiling existing? Yes NoCavity frame hard on floor? Yes No
Floor existing? Yes No
Head measurement A B C D E F G H I J K L to u/side
of bottom plate _____________mm
Pocket measurement M N O P Q R S T U V W X Y Z #
_____________mm
Rep Internal
FHD Head Detail
FLOOR DETAIL
Clearance before coverings:
Floor covering
7 - 12mm
22 - 27mm
42 - 47mm
_____mm
Floor DetailStandard Head Detail
A Floor to underside of ceiling / track
B Floor to top
of trackC
Trimheight
10/13 D Trim height
E Top of head
F Underside of head
Top of track H
Top of head G
_____mm
_____mm
AluSealed Head Detail
JTop of head
I Trim height
Hi-Impact 90/26
AluSealed 90/13
K Underside of head
Top of track L
40
31 313120
36
Soft close Soft Open