Site: Magliana Nord – Rome

Enrico Bocci, Stephen McPhail

Site presentation CM2 - London

Page 2: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

2 Content of the presentation

• Site setup• Site planning• Site budget• Current challenges• Expected barriers against FC Bus

operations

Page 3: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

3 Site setup

• ENI Magliana Nord has been identified as high-potential site:– Visibility (Rome area on motorway to Fiumicino)– Proximity (close to main italian 3EMOTION players)– Possibility (commercial/industrial/municipal sites)

• Leverage on existing H2 distribution hardware (2006)

• Negotiations on-going with ENI (site leaser) and ANAS (site owner) for utilization within frame of 3EMOTION

• Creation of a juridical (non-profit) body for site management within 3EMOTION (bills, certificates, authorizations)

Page 4: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

4 Site setup

ENI Magliana Nord

Commercial area (Shopping Mall,

Golf course, Telecom, etc.)

WWTP

G.R.A.(Rome Ring Road)

A91Rome-Fiumicino

Heli-port

Restaurants, shops

Car wash

Offices

Page 5: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

5 Site setup

Storage H2

Electrolizer& Compressor

Dispenser H2A91Rome-

Fiumicino

Compr.CH4

LPG compression

Workplace

Page 6: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

6 Site setup

The Plan:• Revise & upgrade current Alkaline

electrolysis system to 20 Nm3/h capacity• Revise/substitute H2 compression system• Revise & enlarge H2 storage system• Revise/substitute H2 dispenser• Install biomass gasifier + PSA

scrubber for green H2 production• Trucked-in H2 for back-up/supplement

Page 7: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

7 Site setup

The UNIfHY project:• FCH-JU project ending in 2015• Development of a biomass gasifier with in-

situ gas cleaning and PSA purification for HRS-grade H2 production

• Proof-of-concept at scale ongoingTo be done:• Transfer of reactors to HRS site• System integration with elyser

(purification, compression, storage)• Operated 5 days (80 kg H2) a week

Page 8: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

8

20 Nm3/h 43 kg/day

SAE J2719-grade H227 Nm3/h 57 kg/day 120 kg/day @ 350 bar

100 kg/day @ atm 120 kg/day @ 450 bar

Dis

pens

er

GasifierPSA Purifier

Trucked-in H220 kg/day

(+Backup Gasifier)

ElectrolyserLo

-pre

ssur

e bu

ffer

Com

pres

sor

Hi-p

ress

ure

buff

er

Site setup

Uni L’Aquila Uni Marconi

A.G.T.

Page 9: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

9 Site setup

HRS:

“Association of temporary scope”

• Supply agreements (power, water, biomass, compressed H2)

• Operational agreements (staffing, safety, authorizations)

Page 10: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

10

The balance:PROGETTO FP7 3EMOTION Total per busDimostrazione FC Bus 835891 km 167178 km consumo H2 specifico 12 km/kgH2necessità H2 per dimostrazione 69657.58333 kg H2 3.5 anni costo complessivo x H2:settimane di dimostrazione 175 settimane 182 settimane @ 200 bar 494,889.79€ richiesta H2/settimana 398.04 kgH2/settimana @ 450 bar 518,202.80€

elettrolizzatore: 46% gassificatore (100 kW): 19% H2 bombola: 35%TagliakW 110 kW 6.50€ /kgH2capacità 20 m3_H2/h 27 m3_H2/h 10 pacchi 16 bb/settimana

availability 102 h/settimana 32 h/settimana 154 bb 50L@200bar/settimanaproduzione 2040 m3_H2/settimana 864 m3_H2/settimana 1536.573557 m3_H2/settimana

183.192 kgH2/settimana 77.328 kgH2/settimana 137.5233333 kgH2/settimana32058.6 kgH2 x progetto 13532.40 kgH2 x progetto 24066.58 kgH2 x progetto

54% Rendimento elizzatoreconsumo (pressione amb) 5.5 kWh/m3_H2 0.74 kg_biom/m3_H2 (20 kg/h biom) -€ /trasporto

costo specifico 0.15€ €/kWh °Preso da costo kWh, AEEG, tariffa MTA20.12€ /kg_biom (costo gusci nocc) -€ costo trasporti H2

consumo compr. 1-200 bar 0.40 kWh/m3 *Preso da tabelle di dispense sistemi energetici SE_parte3_vettori0.4 kWh/m3 - kWh/m3costo complessivo 200 bar 315,945.00€ per il progetto 22,512.00€ per il progetto 156,432.79€ per il progetto

costo H2 @ 200 bar 9.86€ /kgH2 1.66€ /kgH2 6.50€ /kgH2

consumo compr. 200-450 bar 0.200 kWh/m3 *Preso da tabelle di dispense sistemi energetici SE_parte3_vettori0.200 kWh/m3 0.200 kWh/m3294,525.00€ 13,440.00€ 156,432.79€

21,420.00€ 9,072.00€ -10,710.00€ 4,536.000€ 8,067.011€

costo complessivo 450 bar 326,655.00€ per il progetto 27,048.00€ per il progetto 164,499.80€ per il progettocosto H2 @ 450 bar 10.19€ /kgH2 2.00€ /kgH2 6.84€ /kgH2

costo produzionecosto compress 1-200 bar

costo compress 200-450 bar

Site planning

Page 11: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

11

Amend.+3 Amend.+6 Amend.+9 Amend.+12 Amend.+15 Amend.+18 Amend.+21 Amend.+24 Amend.+27 Amend.+30 Amend.+33 Amend.+36 Amend.+39 Amend.+42 Amend.+45 Amend.+48Timeline of operations

The timing:

Site planning

Upgrading electrolyser (maintenance and 20 Nmh/h electrolyser) AGTStorage system (44 tanks of 50 l at 450 bar, ie 70 kg), compressor and pipeline AGT

UNIFHY global design and installtion modification USGM + subcontractUNIFHY 5 m3 biomass storage system, feeding system, integration UNIVAQ, USGM, ECIRPSInstallation gasifier and PSA UNIVAQ, USGM, ECIRPSSystems construction/integration/test ENEA, AGT, ECIRPS, USGM, UNIVAQ

Electrolytic H2 production ENEAMaterial and maintanence electrolizer, compressor and H2 distribution AGTUNIFHY operation, maintenance and biomass supply DIMA, ECIRPS, USGM, UNIVAQCompressed hydrogen ENEA, DIMA, ECIRPS, USGM, UNIVAQ

Hydrogen purity compliance DIMA, ENEAPersonnel for HRS and UNIFHY (5 days a week for gasifier) UNIVAQ, USGM, ECIRPS

Training FCB drivers and technicians ENEAMonitoring and maintenance FCB drivetrains (ENEA + subcontract) ENEA + subcontract

Elyser operational

Gasifyer oper.

Compr. H2

Buses oper.

Subject to agreement ENI and ANAS

Page 12: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

12 Site budget

NEW HRS Cost breakdown ‐ LAZIO SiteITEM COST PartnerHRS

Storage system (44 tanks of 50 l at 450 bar, ie 70 kg), compressor and pipeline 190,000.00 AGT

Unifhy 5 m3 biomass storage system, feeding system, integration 100,000.00 UNIVAQ 40 k€, USGM 50 k€, ECIRPS 10 k€UNIFHY subcontractor for global design and installtion modification 50,000.00 USGMUpgrading electrolyser (maintenance and 20 Nmh/h electrolyser) 90,000.00 AGT

50,000.00 E-CIRPSHydrogen purity compliance 20,000.00 DIMA 10 k€, ENEA 10 k€

Total materials 500,000.00

Systems design, construction/integration/test and operation 1,041,000.00 DIMA, ENI, ENEA, KT, CIRPS, USGM, UNIVAQTotal material and personnel 1,541,000.00

FCB

Electricity cost for electrolyser and global compression (ENEA) 353,000 ENEA

Material and maintanence cost electrolizer, compressor and H2 distribution (AGT)50,000

AGTCompressed hydrogen 160,000DIMA, ECIRPS, USGM, UNIVAQUnifhy auxiliary and biomass cost (DIMA) 5,000 ENEA, DIMA, ECIRPS, USGM, UNIVAQInstallation, material and maintanence cost biomass gasification (10% CAPEX) 80,000UNIVAQ, USGM, ECIRPSPersonnel for HRS and UNIFHY (6 days a week for gasifier) 249,600DIMA, ENEAMonitoring and maintenance FCB drivetrains (ENEA + subcontract) 53,000ENEA + subcontractTotal cost 950,600

Subject to agreement ENI and ANAS

Page 13: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

13 FCB & HRS operations

Line 1FCO – Cornelia (Metro+Bus hub) – FCO

Line 2FCO – Termini – Tiburtina – Termini – FCO

0

20

40

60

80

100

120

140

160

180

200

0

5

10

15

20

25

30

35

40H2 production from gasifier H2 production from electrolyserH2 for refueling bus H2 left in the storageH2 buyed

kg kgH2

Page 14: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

14 Bus availability – maintenace approach

BallardChassis, etc… Seats, etc…

FC stackBattery packH2 in

Full service Power out operating hoursparts supply FAULTS Electric motorsreparations E recuperation (brakes, etc.) operating conditions

Control:-Power mgt-State of health

instant. Power FC/batt/recupthermal mgt FC/batteryH2 pressure/flow in/utilizationAir qualityEmissions fuel/air/noisemileage/velocity profilespassenger statisticsfaults

DRIVETRAIN

DATA ACQUISITION

VanHool

FCB

GUARANTEE

MONITORING

TRAINING

VanHool

INTERVENTION PREVENTION

?

Page 15: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

15 Current challenges

HRS:• ENI & ANAS Agreement• H2 Storage capacity & pressure compressed H2 supply• On-site H2 compression and H2 quality downstream • Refuelling distributor (supply and performance)• Electricity cost for elctrolyser

(0.15-0.20 €/kWh à 11 €/kgH2 | 0.10 €/kWh à <9 €/kgH2)

FCB:• FCB Guarantee and servicing agreements/conditions• FCB drivetrain monitoring and fault detections• Training of technicians and drivers

Page 16: Site: Magliana Nord Rome - 3Emotion · 2019. 7. 16. · ENI Magliana Nord Commercial area (Shopping Mall, Golf course, Telecom, etc.) WWTP G.R.A. (Rome Ring Road) A91 Rome-Fiumicino

16 Barriers against FC Bus operations

• Spare parts supply• Guarantee and servicing• Operating costs• Optimal cost-effectiveness vs Battery buses• H2 supply (cost & source)• Awareness & safety