Site Characterization throughout the Tailings
Facility Life Cycle
2018 TAILINGS AND MINE WASTE CONFERENCE
October 1, 2018
M. Malgesini, L. Aubone – Golder
R. Hunsaker, W. Boyd – Goldcorp / Minera Peñasquito
![Page 2: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/2.jpg)
2
Introduction 01
Minera Peñasquito Overview 02
Tailings Facility Life Cycle 03
Site Characterization by Phase 04
![Page 3: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/3.jpg)
___
3
Minera Peñasquito Tailings Facility OverviewC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
PEÑASQUITO
• Zacatecas State, Mexico
• Open pit mine producing
gold, silver, lead, and
zinc since 2010
• Mill Capacity 130,000
tpd
![Page 4: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/4.jpg)
___
4
Minera Peñasquito Tailings Facility OverviewC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
Tailings Facility
• 80 m high
• 11 km long
• Centerline raise,
cyclone sand/
rockfill dam
LOM
• 150 m high
• 807 Mt
![Page 5: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/5.jpg)
___Tailings Facility Life Cycle Site Characterization
5
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
ClosureOperationsConstructionDesignPlanning
1 2 3 4 5
Plan
Design
Construct
Operate
CHANGE
![Page 6: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/6.jpg)
___
6
Initial Planning and Concept Phase
Initial geologic reconnaissance and
field investigation program:
• Geologic features
• Bedrock type and depth
• Soil profiles
• Material Properties
• Groundwater levels
• Borrow Materials
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
2004
![Page 7: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/7.jpg)
___
7
Preliminary Design PhaseC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
![Page 8: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/8.jpg)
___
8
Preliminary Design PhaseC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
![Page 9: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/9.jpg)
___Detailed Design Phase
9
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
• Earth Fill
Starter Dam
• Composite lined
impoundment
• Cyclone sand
dam centerline
raise with east
expansion
![Page 10: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/10.jpg)
___
10
Design and Construction Phase – Adapting to Change
Original Design Basis:
• Mill throughput = 50,000 tpd
• TSF Capacity = 200-300 Mt
• 2 Year Starter Facility
• 3H: 1V Cyclone Sand Dam
• HDPE lined starter facility
Adapting to Change:
• Mill throughput = 130,000 tpd
• TSF Capacity = 807 Mt
• 1 Year Starter Facility
• 3H: 1V Cyclone Sand Dam
• Property Boundary Constraints on
Expansion
• 95% Recovery of Cyclone Sand
Required for Construction
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
![Page 11: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/11.jpg)
___Design/Construct/Operations Phase – Adapting to Change
11
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
Starter
Dam
Rock
Cente
rlin
e
Cyclone
Sand
Tailings
• Temporary Buttress
• Continue Rockfill Decision
• Buttress Requirements
• Centerline Raise Plan
• Initial Operations
• Starter Dam
![Page 12: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/12.jpg)
___
12
Operations Phase – Instrumentation and MonitoringC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
2018-GBH-09
2018-GBH-10 2018-GBH-11 2018-GBH-127+200 Beach
Piezometers
6+095 Test
Fill Location
4+915 Test
Fill Location
2018-GBH-012018-GBH-022018-GBH-032018-GBH-04
2018-GBH-052018-GBH-06
5+450 Beach
Piezometers
2018-GBH-07
2018-GBH-08
6+050 Beach
Piezometers
4+200 Beach
Piezometers3+200 Beach
Piezometers
FormationInstrumentation
Piezometer Inclinometer
Foundation 66 4
Rock Fill 16 0
Cycloned Sand
Beach10 0
Tailings 10 0
![Page 13: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/13.jpg)
___
13
Operations Phase – Instrumentation and MonitoringC A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E
Telemetry Device
Instrumentation• Piezometers
• Inclinometers
Cloud Data System
Internet
Connected
Device
Real-time Monitoring Dashboard
![Page 14: Site Characterization throughout the Tailings Facility Life Cycle 2018...12 Operations Phase –Instrumentation and MonitoringCASE STUDY –SITE CHARACTERIZATION FOR TSF LIFE CYCLE](https://reader031.fdocuments.us/reader031/viewer/2022012003/60a4f29137ff680db65b782b/html5/thumbnails/14.jpg)
___
14
Future Phases and Closure
• Assessments expansion and
alternative tailings management
technologies
• Ongoing site characterization work
to assess Landform Closure
Design Concepts
C A S E S T U D Y – S I T E C H A R A C T E R I Z AT I O N F O R T S F L I F E C Y C L E