2

3South Carolina Aeronautical Training Center: Site and Building Concepts

CONTENTS

I. VISIONING

& Steering Committee Workshops

II. MAIN CAMPUS

& Expanded Campus Vision

III. AERONAUTICAL TRAINING CENTER

& Proposed Main Site Plan

IV. PROGRAMMING

& Allocation of Spaces and Uses

V. BUILDING LAYOUT

& Proposed Floor Plans

VI. LEED CHECKLIST

& Low Impact Development Case Studies

4

SITE & CONCEPT DESIGN STEERING COMMITTEE

Trident Technical College, Administration

Mary Th ornley

Meg Howle

Scott Poelker

Eric Hamilton

Trident Technical College, Aeronautical Studies

Barry Franco

Lonnie Burbage

Rudy Salcedo

Tom Kamenicky

Trident Technical College, Continuing Education & Economic Development

Bob Walker

Stanley Johnson

Trident Technical College Staff & Other

Larry Savidge

Tammy Gunter

MG Mitchum

Rodney Maxwell

Chris Lang

readySC

Jim Maxon

Terrance Rivers

Howard White

Sean Gentry

DESIGN TEAM

O’Brien & Gere, Project Management

Bryan Wood, P.E.

Lindbergh & Associates, Site Team

Richard Garcia, P.E.

Forest McKenzie, P.E., P.L.S.

Brendon Wilson, P.E.

Ray Nix, EIT

Keane McLaughlin, ASLA

Charles Harbin, P.E.

Juan Avila, P.E.

Kayce McCall, P.E.

Lindbergh & Associates, Building Team

Dennis Blaschke, AIA

Artemiy Zheltov, LEED AP

Janette Alexander, AIA

Liz Magalis, LEED AP

Ramey Kemp & Associates, Traffi c Study

Stephen Greene, P.E.

ACKNOWLEDGEMENTS

ACKNOWLEDGEMENTS

5South Carolina Aeronautical Training Center: Site and Building Concepts

WHY

PREPAREa highly skilled workforce

the MISSION of theSOUTH CAROLINA AERONAUTICAL TRAINING CENTERis to...

PROMOTEbest practices

LEADand advocate for our state

INSPIREa new generation of students & leaders

...through

Example ...thro

ugh

Synerg

y

...through

Collaboration...thro

ugh

Steward

ship

create aWORLDCLASS

environment

I. VISIONING& Steering Committee Workshops

WORKSHOP PHOTOGRAPHS & VISION WALL

6 MAIN CAMPUS & PROPOSED SOUTH CAROLINA AERONAUTICAL TRAINING CENTER

940

950

900

North Rivers Town Center

Walmart

New Drive

Rivers Avenue

Ash

ley

Phos

phat

e A

venu

e

Potential Future

Building Site

CSX Railroad

Potential Future

Building Site

Mount Moriah Missionary Baptist

Church

New

Driv

e

New Drive

New D

rive

Wetlands

Wetlands

Wetlands

Wetlands

Proposed South Carolina Aeronautical Training Center Site

7

II. TRIDENT TECHNICAL COLLEGE MAIN CAMPUS

& Expanded Campus Vision

MAIN CAMPUS

630

610

640

920

800

700

300

100

200

510 500

600

620

970

Mab

elin

e Ro

ad

Wetterau Avenue

College Drive

Rivers Avenue

Railroad Avenue

CSX Railroad

910

410

400

300 6001500

SCALE 1:300

Stokes Avenue

600

8 PROPOSED CAMPUS SITE PLAN

Electrical Lineworker Training Grounds

Underground Line Construction

CSX Railroad

Aircraft Ramp

Gathering Space

Drop-off

Employee ParkingService Yard Visitor Parking

Student Parking

Overfl owParking

Wetlands

New Bridge

Wetlands Wetlands

Proposed South Carolina Aeronautical Training Center

Visitor Parking

9

III. SOUTH CAROLINAAERONAUTICAL TRAINING CENTER

& Proposed Main Site Plan

IMMEDIATE CAMPUS CONNECTION

New Drive

920Complex for Economic

Development & Culinary Institute of

Charleston

630Health Sciences

Building

Mab

elin

e Ro

ad

970 Nursing & Science

Building

New Drive Wetterau Avenue

CSX Railroad

Railroad Avenue

General Parking

General Parking

Electrical Lineworker Training Grounds Overhead Line Construction

General Parking

150 300750

SCALE 1:150

10 ALLOCATION OF SPACES AND USES

BUILDING CORE25,500 SF

GATHERING SPACES17,000 SF

CORE3,360 SF

LABS AND SHOPS20,100 SF

CLASSROOMS12,984 SF

ADMIN6,428 SF

CORE1,080 SF

LABS AND SHOPS17,100 SF

CLASSROOMS9.024 SF

ADMIN2,640 SF

CORE980 SF

LABS AND SHOPS29,260 SF

HANGAR40,000 SF

CLASSROOMS12,984 SF

ADMIN5,160 SF

CORE1,260 SF

HANGARHangar 1 40,000 40,000

Hangar Catwalks 2 2,500 0

40,000

LABS & SHOPSAirframe Lab (ACM) 1 4,000 4,000

Powerplant Lab (ACM) 1 2,400 2,400

Avionics Lab (AVT) 1 2,400 2,400

Avionics Bench Lab (AVT) 1 2,400 2,400

Composites Lab Clean (AMF) 1 1,600 1,600

Composites Shop Dirty (AMF) 1 1,600 1,600

Sealant Lab (ACM/AMF) 1 1,600 1,600

Aeronautical Basics & Hydraulic Lab(ACM/AMF/AVT)

1 1,600 1,600

Sheet Metal Shop (ACM/AMF/AVT) 1 1,600 1,600

Welding Shop (ACM) 1 1,200 1,200

Welding Shop (AMF & Con Ed) 0 800 0

Paint Shop (ACM) 1 1,600 1,600Tool Room 1 1,600 1,600Aircraft Parts Storage Room 1 1,600 1,600General Storage 1 800 800

HazMat Storage/Waste 4 200 800Loading/Crane Area 1 800 800

Electrical Room 1 80 80IT/Com Room 1 80 80Men's Restroom 0 600 0Women's Restroom 0 600 0Corridors 1 1,500 1,500

29,260

CLASSROOMSMaster Academic Classroom 12 960 11,520

Collaboration Room 2 192 384Corridors 1 1,080 1,080

12,984

OFFICESReception & Waiting 1 300 300Office, Dean or Dept Head 3 160 480Office, Professor 12 140 1,680Office, Adjunct Shared 1 1,000 1,000

Student Advisement Lab 1 800 800Admin Records 1 300 300Conference Room 1 600 600Mail/Copy Room 1 300 300Mechanical Room 1 200 200Electrical Room 1 80 80IT/Com Room 1 80 80Men's Restroom 0 800 0Women's Restroom 0 800 0Faculty/Unisex 1 60 60FP Riser/ Janitor Room 1 60 60Department Corridors 1 480 480

6,420

AERONAUTICAL STUDIES Subtotal 88,664

LABS & SHOPSFuture Lab: Tier 1 Partner 1 2,400 2,400

Mechatronics & IndustrialAutomation Lab

1 1,800 1,800

Quality/NDI Lab 1 1,200 1,200Industrial Maintenance Lab 1 1,200 1,200Composites Lab Clean 1 1,600 1,600

Composites Shop Dirty 1 800 800

Structures/Assembly Lab 1 1,800 1,800

Sealant Lab 1 1,600 1,600

Electrical Lab 1 1,200 1,200Sheet Metal Shop 1 800 800

Welding Shop 0 800 0

Paint Shop 0 1,600 0Trainee Breakroom 1 600 600

Tool Room 1 600 600General Storage 2 500 1,000HazMat Storage/Waste 1 200 200Loading/Crane Area 1 300 300

17,100

CLASSROOMSMaster Academic Classroom 4 960 3,840

Subdividable Classroom 4 1,200 4,800

Collaboration Rooms 2 192 3849,024

OFFICESReception & Waiting 1 300 300

Office, Director 1 180 180Office, Professor 3 140 420Office, Facility Resource Mgr 1 140 140Office, Adjunct Shared 1 800 800Conference Room 1 600 600Mail/Copy Room 1 200 200Mechanical Room 1 200 200Electrical Room 1 80 80IT/Com Room 1 80 80Men's Restroom 0 800 0Women's Restroom 0 800 0Faculty/Unisex 1 60 60FP Riser/ Janitor Room 1 80 80Department Corridors 1 480 480

3,620

TTC CON ED Subtotal 29,744

39%90%100% 13%

AERONAUTICAL STUDIES88,664 sf

TOTAL NET204,860 sf

TOTAL GROSS1

225,346 sf

A AERONAUTICAL STUDIES

88,664 sf

W WORKFORCE DEVELOPMENT

29,744 sf

B readySC TRAINING

40,592 sf

E EDUCATIONAL ACTIVITIES

20,360 sf

C CORE FUNCTIONS & SUPPORT

25,500 sf

WORKFORCE DEVELOPMENT29,744 sf

\

# SPACES SF/SPACE NET SF # SPACES SF/SPACE NET SF

1 Total gross area includes 10% or 20,486 sf area factor for exterior and interior wall thickness and interstitial core spaces.2 Site Elements are not included in the building area

11South Carolina Aeronautical Training Center: Site and Building Concepts

IV. PROGRAMMING& Allocation of Spaces and Uses

LABS & SHOPSComposites Lab Clean 1 1,000 1,000Composites Shop Dirty 1 2,000 2,000

Systems Electrical Lab 1 2,500 2,500

Bond & Ground Lab 1 2,000 2,000

Structures Lab 1 4,200 4,200

Sealant Lab 1 1,600 1,600

Instructors Open Office 1 1,000 1,000

Trainee Breakroom 1 600 600

Tool Issue & Storage 1 1,600 1,600

Repair Shop 1 400 400Prep/Materials Storage 2 300 600General Storage 2 1,000 2,000HazMat Storage/Waste 1 300 300Loading/Crane Area 1 300 300

20,100

CLASSROOMSMaster Academic Classroom 2 960 1,920

Subdividable Classroom 10 960 9,600

Collaboration Room 2 192 384Corridors 1 1,080 1,080

12,984

OFFICESReception & Waiting 1 1,200 1,200

Office, Director 2 192 384Office, Managers (Shared) 4 192 768

Office, Staff 4 144 576Admin Area 1 600 600Admin RIM Storage 1 300 300Admin Ready Use Storage 1 200 200Staff Open Office 1 1,000 1,000

Conference/Team Room 1 600 600Mail/Copy/Plot Room 1 200 200Staff Breakroom 1 600 600

Mechanical Room 1 200 200Electrical Room 1 80 80IT/Boeing Switch Room 1 120 120IT/Com Room 1 80 80Men's Restroom 0 800 0Women's Restroom 0 800 0Faculty/Unisex 1 60 60FP Riser/ Janitor Room 1 60 60Department Corridors 1 480 480

7,508

BOEING TRAINING Subtotal 40,592

GATHERING SPACESVisitor Entry Lobby 0 800 0

Lecture Hall 0 600 0Lecture (Exhibit/Conference/Flex) 2 3,000 6,000

Lecture (Future Exhibit/Lab/Flex Shell 1 6,000 6,000

Chair & Table Storage 2 600 1,200

Café 1 400 400

Café Lounge / Vending 1 2,400 2,400

Aeronautical Museum & Library 1 1,000 1,000

Men's Restroom 1 1,200 1,200Women's Restroom 1 1,200 1,200Department Corridors 2 480 960

ENTERPRISE & CONFERENCING Subtotal 20,360

COREStudent Entry Lobby 0 900 0Faculty/Visitor Entry Lobby 0 900 0Concourse A 1 9,600 9,600Concourse B 1 5,600 5,600Communicating Stair 0 320 0Stairwells 3 240 720Public Elevator 3 80 240Freight Elevator 3 140 420Elevator Equipment Room 2 80 160Main FP Riser/Pump Room 1 100 100Main Mechanical Room 0 1,600 0Mechanical Mezzanine 1 3,200 3,200Main IT/Com Room 1 200 200

General Building Storage 0 250 0Men's Restroom 2 1,000 2,000Women's Restroom 2 1,000 2,000Family/Unisex 1 60 60CEP Chillers 1 1,200 1,200CEP Water Treatment 1 300 300CEP Main Electrical & Switchgear 0 1,125 0CEP Pumps 1 1,215 1,215Mech Mezzanine / Air Handlers 1 3,200 3,200

CORE FUNCTIONS & SUPPORT Subtotal 25,500

18% 9%

4% 100%

11%

readySC TRAINING40,592 sf

EDUCATIONAL ACTIVITIES20,360 sf

OUTDOOR BUILDING SPACES3 acres

SITE ELEMENTS67 acres

CORE FUNCTIONS25,500 sf

ALLOCATION OF SPACES AND USES

Ramp 1 100,000 100,000CEP Cooling Towers 1 3,840 3,840

Generator Yard 1 300 300

Compressor Yard 1 300 300Box/Compactor Area 1 300 300Thermal Ice Storage Yard 0 2,400 0Loading Area/Service 1 600 600Service Yard 1 6,000 6,000Trash Dumpster Area 1 300 300Main/Student Entry Porch 1 6,000 6,000Faculty/Guest Entry Porch 1 6,000 6,000Outdoor Café Plaza 1 2,000 20,000

OUTDOOR BUILDING Subtotal 143,640

of 67 acre site of site (tracts A and A-2)EASEMENTSAT&T Distribution Easements 1 3CPWWater Tunnel Easement 1 6SCE&G Transmission Easements 1 7

WETLANDSWetlands 1 17

Wetlands Buffer 1 5

DEVELOPABLE HIGHLANDS ELEMENTS33

Visitor Parking 100 425 1

Student Parking 450 425 8

Employee Parking 100 425 1

Carpool/Van/Alt Fuel Parking 8 425 1

Ramp / Secured Parking 2 425 1

Outdoor Building (includes Ramp)Building (assumes entire footprint on First Floor)

Stormwater Detention 3Highlands Acres Remaining 7

# SPACES SF/SPACE NET SF # SPACES SF/SPACE NET SF

# SPACES SF/SPACE NET SF # SPACES SF/SPACE NET ACREAGE

# SPACES SF/SPACE NET SF

See footnote 2

12 PROPOSED FIRST FLOOR PLAN

EDUCATIONAL ACTIVITIES & CONFERENCING6,000 sf

CAFE AND SEATING3,800 sf

LABS & SHOPS29,260 sf

HANGAR40,000 sf

RAMP100,000 sf

CENTRAL ENERGY PLANT2,800 sf

ADMINISTRATION6,420 sf

South Carolina Aeronautical Training Center: Site and Building Concepts PROPOSED FIRST FLOOR PLAN 13

UP

UP

J

HANGAR

A

LABS ANDSHOPS

232221201514131211876532

DDE

16

11.4

17 18

LECTURE/CONFERENCE1

191094

B

C

D

F

C.5

G

H

I

11.3

11.2

11.1

EE

FF

GG

HH

JJ

CC

BB

AA

CORR.

A'

CENTRALENERGY PLANT

PAINT SHOP

THE FUSELAGECAFE

SERVICE HALL

LOADING BAY

KITCHEN

EXHIBIT HALL

TOOL STORAGE

FP COMMANDCTR ELEC

W.M. IT

AA'

LECTURE/CONFERENCE2

OFFICES

STO.

C.75

MM

50 100250

14 PROPOSED SECOND FLOOR PLAN

FLEX SPACE (FUTURE LABS)

6,000 sf

CLASSROOMS12,984 sf

LABS & SHOPS29,260 sf

CHILLER YARD 2,800 sf

OUTDOOR CLASSROOM

3,000 sf

CLASSROOMS12,984 sf

ADMINISTRATION6,420 sf

15South Carolina Aeronautical Training Center: Site and Building Concepts PROPOSED SECOND FLOOR PLAN

UP

UP

J

A

232221201514131211876532

DDE

16

11.4

17 18 191094

B

C

D

F

C.5

G

H

I

11.3

11.2

11.1

EE

FF

GG

HH

JJ

CC

BB

AA

A'

LABS ANDSHOPS

OFFICES

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

W.

CLASSROOM

CLASSROOMPERCH

M. MECH/ELEC

AA'

CLASSROOM

FLEX/ PARTNERLEASE/LAB OF

THE FUTURE

TOOLS/STOR

SERVICE HALL

IT

PORCH

OPEN HANGAR

CLASSROOM

STORAGE

OUTDOOR CLASSROOM

COOLING TOWER

C.75

MM

MEDIACLASSROOM

50 100250

16 PROPOSED THIRD FLOOR PLAN

Future Labs(below)

CLASSROOMS12,984 sf

Labs & Shops20,000 sf

Administration6,420 sf

LOADING DOCK1,600 sf

17South Carolina Aeronautical Training Center: Site and Building Concepts PROPOSED THIRD FLOOR PLAN

UP

UP

UP

J

A

232221201514131211876532

DDE

16

11.4

17 18 191094

B

C

D

F

C.5

G

H

I

11.3

11.2

11.1

EE

FF

GG

HH

JJ

CC

BB

AA

A'

CLASSROOM

CLASSROOM

CLASSROOM

MEDIACLASSROOM

OFFICES

LABS ANDSHOPS

CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

SERVICECORRIDOR

CLASSROOM

STORAGE

W.M.

MECH/ELEC

AA'

TOOLSSTORAGE

INSTRUCTORSOPEN OFFICE

LABS ANDSHOPS

CLASSROOM

CLASSROOM

C.75

MM

STORAGE

50 100250

18 LOW IMPACT DEVELOPMENT CASE STUDIES

www.bani.md www.magicblueproperty.com

www.archdaily.com

www.pinterest.comwww.scetv.org

Low Impact Development: A Design Manual for Urban Areas

www.wagnerhodgson.com www.venturawatershed.comwww.streetfi lms.org

19South Carolina Aeronautical Training Center: Site and Building Concepts

VI. LEED CHECKLIST& Low Impact Development Case Studies

SUMMARY OF LEED CREDITS

SUMMARY OF POTENTIAL LEED CREDITS

© L

IND

BERG

H &

ASS

OC

IATE

S, A

T.Y

.LIN

INTE

RNA

TION

AL

CO

MPA

NY,

AUG

UST

2015