![Page 1: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/1.jpg)
REPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION
Post-Fukushima Safety Actions in Slovenia
Siniša Cimeša Slovenian Nuclear Safety Administration
![Page 2: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/2.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
2
Content
• Introduction
• Post-Fukushima improvements – Mobile equipment
– Stress tests‘ improvements
– Safety Upgrade Program, SUP
• Legislation changes
• Lessons learned and Challenges
![Page 3: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/3.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
3
Introduction – Krško NPP
• Westinghouse PWR, 2 loop, 700 MWe
• At least 2x100% redundancy of safety systems
• Commercial operation since 1983
• Important facts: – Seismic design 0.3 g – Detailed SPSA done in ‘90s and
again in 2004 – Detailed flood protection analysis – SAMGs developed in late ‘90s – Full scope simulator in 2000
– Wet cavity modification
![Page 4: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/4.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
4
Introduction – SNSA
• SNSA is an independent agency within the framework of Ministry of the Environment and Spatial Planning
• Reports directly to the minister
• It is financed solely by the state budget
• Legislation in line with WENRA
• Relying on US NRC‘s regulation and standards
![Page 5: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/5.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Post-Fukushima improvements in the Krško NPP
![Page 6: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/6.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Design Extension Conditions for Krško NPP
6
Design basis
• Seismic: 0.3 g PGA • Flood: PMF = 7081 m3/s • Single failure criteria
• Station Black Out (SBO): 4 h • UHS: loss of river flow up to 30
days
• Loss of MCR temporarily – establish „hot shutdown“
DEC
• Seismic: 0.6 g PGA • Flood: PMF + earthquake (0.6g) • Assume loss of all trains of safety
systems • SBO: 72 h • UHS: loss of primary UHS for 30
days + combination with SBO for 72 h
• Loss of MCR indefinitely – establish „cold shutdown“
• Aircraft crash • Tornado (240 km/h) • Extreme temperatures (10,000
year return period)
![Page 7: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/7.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements in the Krško NPP
• Phase 1: – Mobile equipment and quick connection points (incl. procedure
changes) acquired and established before June 30 2011
• Phase 2: – Additional mobile equipment and connection points after EU
stress tests
• Phase 3: – Krško NPP Safety Upgrade Program
7
![Page 8: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/8.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 1
• Mobile equipment and quick connection points (incl. procedure changes) acquired and established before June 30 2011 – Implementation of US NRC B.5.b action plan (following 9/11
event) – Credited in stress tests
![Page 9: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/9.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 1
![Page 10: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/10.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 1
![Page 11: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/11.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
11
Fire truck with a hydraulic fire-fighting arm Tanks: 8500 l of water & 1500 l of fire-extinguishing foam
Improvements: phase 1
![Page 12: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/12.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
• As a result of stress tests several other improvements were identified, mostly acquiring additional pieces of mobile equipment – Finished by the end of 2012
Improvements: phase 2
![Page 13: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/13.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 2
![Page 14: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/14.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 1 & 2
• Mobile equipment stored in a shelter – Protected against external hazards (DEC): earthquakes, floods,
extreme weather, aircraft crashes…
• Quick connection points established
• Support equipment: – Resources (diesel, petrol, water) – Fuel transfer pumps – Connection cables – Fire hoses – Transfer trucks / tractors
14
![Page 15: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/15.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 1 & 2
• Procedures – EOPs, SAMGs
• Testing & maintenance – Interval – Procedures (who, how and when)
• Training – Training operators/staff to use equipment
• Exercises with real scenarios – Checking feasibility (human and equipment resources) – Procedures validation
![Page 16: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/16.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Improvements: phase 3
• In September 2011 SNSA issued a decision requiring from the plant to reassess the SAM strategy, and existing measures and to implement necessary safety improvements for prevention of SA and mitigation of its consequences,
• This evaluation concluded in January 2012
• Action plan, so called „Krško NPP Safety Upgrade Program“ (SUP)
• Endorsed by SNSA in February 2012
![Page 17: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/17.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Phase 1 completed
in 2013
Phase 2 underway
– to be completed
by 2018
Improvements: phase 3
• The Krško NPP‘ SUP improvements: – Replacement of active hydrogen recombiners with passive ones
(PARs) – Installation of (passive) containment filtered vent system (CFVS) – Flood protection of the nuclear island – Operation support center reconstruction – Installation of pressurizer PORV bypass – Spent fuel pool (SFP) alternative cooling – Alternate cooling of reactor coolant system and containment – Installation of emergency control room (ECR) – Upgrade of bunkered building #1 (BB1) electrical power supply – ECR / Technical support center ventilation and habitability system – Replacement and upgrade of critical instrumentation
![Page 18: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/18.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Phase 3 to be
completed by 2021
Improvements: phase 3
• The Krško NPP‘ SUP improvements: – BB2 Project – independent injection / cooling system in a bunkered
building with additional sources of borated and unborated water with dedicated pumps for injection into reactor cooling system / containment and steam generators capable of assuring reactor cooling for at least 30 days.
– Erection of dry spent fuel storage facility
– All these improvements (SUP) will be designed for Design Extension Conditions – DEC !!
![Page 19: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/19.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
– Passive recombiners (PARs) – Containment Filtered Vent System (CFVS)
SUP – phase 1
![Page 20: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/20.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
• Flood protection of the nuclear island – implemented in 2015-16 – Flood protection doors, temporary flood barriers, replacement of
flood protection check valves, penetration seals improved – Protection of the Krško NPP in case of combined maximum flood
and (design extension) earthquake
20
SUP – phase 2, underway
![Page 21: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/21.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Changes in Legislation
• Alignment with the amended EU Nuclear Safety Directive (Law, Rules JV5 and JV9)
• Alignment with the EU Basic safety standards directive (BSS)
• New Rules JV5 and JV9 – WENRA Safety Reference Levels of 2014 – WENRA Safety Objectives for new reactors, 2013
![Page 22: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/22.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Lessons learned
• Importance of Periodic Safety Review (PSR) • Ongoing plant improvements started before Fukushima
accident – 3rd full scope EDG (in bunkered building #1):
resulted from 1st PSR, under construction during Fukushima accident, functional since June
2012
– Increased level of dikes on the left side of Sava river: resulted from 1st PSR, new, increased PMF, March 2012
22
![Page 23: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/23.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Challenges
• Timely implementation of the SUP improvements – Problems with public procurement – unsuccessful bidders‘ appeals
cause big delays in project implementations
• Upgrade of I&C – qualification for severe accidents
• Challenges with newly installed equipment – PARs – CFVS
23
![Page 24: Siniša Cimeša Slovenian Nuclear Safety Administration · PDF fileREPUBLIC OF SLOVENIA MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION Post-Fukushima](https://reader031.fdocuments.us/reader031/viewer/2022022001/5a78ac547f8b9a273b8d01e5/html5/thumbnails/24.jpg)
MINISTRY OF THE ENVIRONMENT AND SPATIAL PLANNING SLOVENIAN NUCLEAR SAFETY ADMINISTRATION www.ursjv.gov.si
Expert feedback on the draft document
• … still in review…