SINGLE PILOT SAFETY WORKING GROUP DATA ANALYSIS … · Single Pilot Working Group Data Analysis...
Transcript of SINGLE PILOT SAFETY WORKING GROUP DATA ANALYSIS … · Single Pilot Working Group Data Analysis...
SINGLE PILOT SAFETY WORKING GROUP DATA ANALYSIS PROCESS
DAN RAMIREZDIRECTOR OF SAFETY
DATAANALYSISPROCESS
1.Reviewtheaccidentrisk– AcademicPartnership
2.Reviewofapplicablesafetyenhancements(GA-JSC)
3.DetailImplementationPlan
4.Monitorprogress
1.REVIEWTHEACCIDENTRISKACADEMICPARTNERSHIP
REVIEWANDANALYSISOFACCIDENTRISK
Thefirststepoftheprocessistoreviewthecurrentaccidentdata,providedbyvarioussourcesincludingFSF,NBAA,NTSB,FAAthefoundationandoutsidesourcesandunderstandwheretheaccidentriskare
WehavealsopartnerwithNovaSouthEasternUniversity(NSU)tohaveathirdpartyobjectiveorganizationhelptheworkinggroupanalyzethedata
REVIEWANDANALYSISOFACCIDENTRISK
SPGWWorkingGroup
Single Pilot Working Group Data AnalysisReview data from Breiling Report, ICAO data, NTSB DataJan-16
ARC Abnormal Runway ContactCFIT Controlled Flight Into or Toward TerrainF-NI Fire/Smoke (Non-Impact)LOC-I Loss of Control—In FlightMAC Midair/Near Midair CollisionOTHR OtherRAMP Ground HandlingRE Runway Excursion (Takeoff or Landing)RI-VAP Runway Incursion—Vehicle, Aircraft, or PersonSCF-PP System/Component Failure or Malfunction (Powerplant)UNK Unknown or UndeterminedUSOS Undershoot/OvershootWSTRW Wind Shear or Thunderstorm
[42]
The first 7 Probable Causes cover 82.19% of the Total Types of Accidents
SC
F-P
P
CF
IT
US
OS
RE
LOC
-I
RA
MP
BIR
D
UN
K
RI-V
AP
AR
C
WS
TRW
MA
C
F-N
I
Tota
l
0%
20%
40%
60%
80%
100%
0
2
4
6
8
10
12
14
16
Cum
ulat
ive
%
Typ
es o
f Acc
iden
ts
Probable Causes
Accident Data Set
Vital Few Useful Many Cumulative% Cut Off %
REVIEWANDANALYSISOFACCIDENTRISK
SPGWWorkingGroup
Single Pilot Working Group Data AnalysisReview data from Breiling Report, ICAO data, NTSB DataJan-16
[42]
The first 3 Phase of Flight cover 79.45% of the Total Accident/Incidents
Land
ing
Taxi
Take
-off
Cruis
e
Appro
ach
Clim
b
Manu
verin
g
0%
20%
40%
60%
80%
100%
0
5
10
15
20
25
30
35
40
45
Cumu
lative
%
Accid
ent/In
ciden
ts
Phase of Flight
Accident Data Set
Vital Few Useful Many Cumulative% Cut Off %
REVIEWANDANALYSISOFACCIDENTRISK
Single Pilot Working Group Data AnalysisReview data from Breiling Report, ICAO data, NTSB DataJan-16
[42]
The first 2 Accident by Type of Operation cover 97.26% of the Total Number
Com
mer
cial/A
C
Priva
te/P
erso
nal B
usine
ss
Traini
ng
0%
20%
40%
60%
80%
100%
0
5
10
15
20
25
30
35
40
45
Cum
ulativ
e %Nu
mber
Accident by Type of Operation
Accident Data Set
Vital Few Useful Many Cumulative% Cut Off %
REVIEWANDANALYSISOFACCIDENTRISK
SPGWWorkingGroup
Single Pilot Working Group Data AnalysisReview data from Breiling Report, ICAO data, NTSB DataJan-16
[42]
The first 3 Damage Category cover 100. % of the Total Accidents/Incidents
Mino
r
Subs
tancia
l
Destr
oyed
0%
20%
40%
60%
80%
100%
0
5
10
15
20
25
30
35
40
45
Cumu
lative
%
Accid
ents/
Incide
nts
Damage Category
Accident Data Set
Vital Few Useful Many Cumulative% Cut Off %
REVIEWANDANALYSISOFACCIDENTRISK
REVIEWANDANALYSISOFACCIDENTRISK
2.REVIEWOFAPPLICABLESAFETYENHANCEMENTS(GA-JSC)
INDUSTRYRECOMMENDATIONSANDSE
ReviewedallIndustrySafetyEnhancements,andidentifiedsubsetthatmaycontributetoanear-termreductionoffatalityrisk.
PossibleSourcesofSE’sincludeGA-JSCandICAO’sRASG-PAgroupandNBAA.
TheteamevaluatesthesafetyenhancementsagainsttheaccidentsettoassigninganeffectiveSafetyEnhancementestimationscore
3.DETAILIMPLEMENTATIONPLAN
UsingtheSafetyEnhancementsasreference,ourworkinggroupwilldevelopDetailedImplementationPlans(DIPs)withtheobjectiveto:
• UpdatecontenttobeSinglePilotFocused
• IncorporateFeedbackfromtheNBAASafetyCommittee,ouracademicpartnership,andindustrypartners
DetailImplementationPlan
DetailImplementationPlanSinglePilotWorkingGroupDIP
4.MONITORPROGRESS
MONITORPROGRESS
Afterourplanshavebeenimplemented,wewillmonitortheirprogressviaourannualriskassessmentmeeting,aswellupdatethecommunityduringtheannualsafetystand-downs
RISKREDUCTION
SUMMARY
Review and analysis of accident risk
Are there any safety
Enhancements to reduced risk
End
Review of applicable safety enhancements
YESBring Issue to GA-JSC for SE Development
NO
Start preparing DIPs
Select a team with a leader to prepare Detail Implementation Plan
Monitor progress
Review DIPs with NBAA Safety Comittee
Coordinate DIP Implementation at BACE
SUMMARY
• Thisprocessisanecessityneededforandeffectivemeansofsettingrealisticsafetytargetsforourcommunity
• TargetsNOTbasedon“reactive”measures
• Developmentofaclearimplementationmechanismforourworkinggroup
• EffectivemeasurementofimprovedSafetyfortheSinglePilotCommunity
Summary
THANK YOU
DAN RAMIREZDIRECTOR OF SAFETY XOJET