Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been...
Transcript of Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been...
![Page 1: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/1.jpg)
ISO 9001:2008 CERTIFIED
PIC TECHNOLOGYAn ISO 9001:2008 Certified Company
EASY TRACK
ENERGY IS LIFE
CONSERVE IT
![Page 2: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/2.jpg)
COMPANY PROFILE
QUALITY OF PRODUCT
QUALITY ASSURANCE
QUALITY OF SERVICE AND SUPPORT
MOTTO
EXPERIENCE
Pipe In Cage Earthing Technology was came in the market in year 2009 after long journey of Research and
Development in the field of Earthing and lightning protection system. Basically founder team is from technical filed,
company CEO has served as a Maintenance Manager in one of the known power distribution company in Gujarat
and having more than 25 years experience in maintenance of medium voltage switchgears, Distribution
transformers, reactive power management, Earthing and lightning protection system.
The productions of Lightning Protection and Earthing Systems are specific area with great demands on professional
knowledge of the company's management as well as the production and research staff.
Introduction of new technologies and using the latest testing equipment enable engineers to extend their technical
knowledge.
Our experienced and highly-qualified staffs at our Marketing and Sales Departments are doing their best to look
after all our customer's needs in India and worldwide markets.
Our factory is located in Vitthal Udyognagar, Anand City Gujarat which is an industrial city. Our factory has adopted
latest technique of manufacturing process to produce quality products. The latest manufacturing
methods and fine management ensure production efficiency and comparatively lower cost so as to
have price advantage
Following the technologic developments of Lightning Protection and Earthing, PIC Technology in
every step of its production, targeted the best qualities for its products that makes it more suitable to
markets requirements, complying Quality Management System rules and keeping its customers
satisfaction its first priority.
Our finished product is always passing through our Quality Assurance Cell. Electrical & Mechanical
tests are carried by our experienced engineers on each unit.
Ongoing training programs are provided for all personnel to create a continuous quality of service
and installation awareness. A group of experienced sales personnel and their customer-oriented
service can completely meet customers' needs.
Our motto is to provide best service and high-quality products to our valued customers undertaking
the principle of "efficiency, innovation and sincerity", we warmly welcome customers from all over the
world to get in touch with us for business.
Since 2009, PIC Earthing Technology has been involved in many of the large projects in Gujarat
State, India. For example, the company has been actively involved with Earthing and Lightning
protection for First Carbon Technology India Ltd., Mehta polyfabs, Shabanam petrofills, Hotel Fortune Galaxy
(ARETE Services Pvt Ltd), Amba Exports, Ramkrishna Exports, Surge wears, Auto-Tuf Safety Glass, CG Lucy
Switchgear Ltd, HITACHI (India) Ltd., Ames Impex Transformers, etc. It has also operated as both supplier and
consultant on numerous projects outside the Gujarat State in India.
PIC TECHNOLOGY
![Page 3: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/3.jpg)
PRODUCTS WE OFFER
PIPE IN CAGE (PIC) EARTHING ELECTRODE
PRODUCT DETAILS (Exclusive Range)
WHY PIC EARTHING TECHNOLOGY?
APPLICATIONS
PIC Technology offers wide range of Electrical products like, Pipe In Cage type Earthing Electrode, Rod In Pipe type
Earthing Electrode with Support Filling Compound (SFC) and Benjamin Franklin rod type Lightning Protector.
£ PIC Earthing Technology is the Exclusive solution for Electrical Earthing.
£ Especially we had developed the Alloy of Nickle and Stainless Steel having very high rust resistance property and
good current conductive property.
£ Beauty of this product in its design. Pipe in Cage structure gives more effective surface area of electrode compared
to any other type of Electrodes.
£ PIC electrode is made from unique metal with special alloys as homogeneous material, no bimetal contacts.
£ PIC electrode is free from galvanic attack.
£ PIC electrode is having very high rust resistive property and good current conductive property.
£ PIC electrode provides theft proof design.
£ Eco friendly earth enhancer compound as SFC.
£ Cost effective with long life.
£ Ensures protection in any season.
£ PIC electrode has maximum utilization of available surface area.
£ PIC electrode is available in wide range in different sizes to suit all types of need from common man to foreman.
£ PIC electrode is having large effective surface area compare to any other electrodes.
£ PIC electrode has capacity to carry high current repeatedly.
£ PIC electrode is easy to install and require less space.
£ PIC electrode provides fast dissipation of any fault / static current due to large surface area, no corrosion and maintaining require moisture contents.
Technology is continuously striving to expand its market in India in the field of fertilizer,
petrochemicals, power sector, mobile telephone companies, electrical consulting engineers,
architects, metropolitan councils, government departments, water affairs, CNG Gas
companies, computer companies, military and Air force.
E1
E2
E3
E4
MODEL E1
MODEL E2
MODEL E3
MODEL E4
Residential Aria
Commercial Markets
Heavy Industries
& Hospitals
Electrical Generation,
Transmission & Distribution
![Page 4: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/4.jpg)
RIP TECHNOLOGY
PRODUCT DETAILS (Economic Range)
SUPPORT FILLING COMPOUND
Support Filling Compound (SFC) is a specially developed
Conductivity improver and Earth enhancer compound. It
reduces the soil resistivity and helps in faster dissipation of
heavy fault current repeatedly.
£ SFC reduces soil resistivity by enhancing its properties.
£ Ionic ingredients – ions for ease of conduction
£ Dispersion ingredients – spread the conductive material
particles equally in pit
£ Expansion ingredients – after absorbs moisture expands
20-30times
£ Diffusion ingredients – cover soil pores + enlarge conductive zone
£ Hygroscopic ingredients – absorbs surrounding moisture and retain in
the soil for long time
£ Other conductivity enhancing material.
RIPELECTRODE
SFC
&
R1
R2
R3
R4
R5
![Page 5: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/5.jpg)
HOW TO ERECT PIC/RIP EARTH ELECTRODE ?
£ Bore a 200mm/300mm dia hole in the ground of 2m/3m depthwith respective length of earth electrode.
£ Place handful of Support Filling Compound (SFC) at the bottom of this bore.
£ Remove packing material from Electrode.
£ In case of PIC electrode, connect PIC electrode and strip with only given
fasteners.
£ Place PIC/RIP earth electrode inside the bore such that the connection strip
remains in level with existing ground.
£ Fill the bore with mixture of loose earth & SFC and sufficient supply of water.
£ Pour water for next 6-7 days for settling of excavated earth & resurface the earth.
£ Prepare earth pit chamber for ease of periodic earth pit resistance measurement.
GENERAL ARRANGEMENT
OuterCage (A)
InnerPIPE (D)
ConnectionTerminal (C)
Angle
Seal
Strip
SFC/CCM
PIC ELECTRODERIP ELECTRODE
L =
1000-2
000-3
000 m
m
G.L.
PCC
ROD
Outer PIPE
RIP Electrode
PIC Electrode
SFC mixed withwater & soil
Chargedissipation
Strip
Jointing of strip& Electrode
ConnectionTerminal
EarthingChamber
Handle
L =
1000-2
000-3
000 m
m
![Page 6: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/6.jpg)
![Page 7: Single Page for Printpicearthingtech.com/gallery/PICBROCHURE.pdfFor example, the company has been actively involved with Earthing and Lightning protection for First Carbon Technology](https://reader033.fdocuments.us/reader033/viewer/2022050404/5f8145ed10c1da71e9601ebc/html5/thumbnails/7.jpg)
InspectionEarth Pit
PIC EarthingElectrodes
ETLP-01
BaseInsulator
Base fitting
DownConductor
LightningLeader