Torsten JACOBDG MOVE / E2
23/05/2011
Single European Sky
State of affairs and next challenges
| 2ICAO PBN TF and APV workshop May 2011
European Aviation
. 790 million passengers;. 3.2 million workers;. Activity of 220 billion Euros (1.5% EU GDP);. ATM is an integral part with » 56 000 workers
(16 800 ATCOs and 39 200 support staff);
» 14 million controlled flight hours;
» 277 certified ANSPs.
| 3ICAO PBN TF and APV workshop May 2011
The current European ATM system
. 2010 more delay, less traffic than 2008;» 24.2 % of flights were delayed by
15 minutes or more;
» 19.4 million minutes of en-route ATFM delay;. for each flight actual flown trajectory is in
average 49 km longer than great circle;» unnecessary fuel consumption, emission of
about 5 millions tons of CO2 and additional cost
of 1 billion Euro per year; and. the total cost of the current fragmentation is
estimated at 4 billion Euros per year.
| 4ICAO PBN TF and APV workshop May 2011
Military airspace in Europe
| 5ICAO PBN TF and APV workshop May 2011
Single European Sky II (2009)
SES II
Performance scheme
Technology SESAR
Network Management
Functionalairspace blocks
Extended EASA competences
| 6ICAO PBN TF and APV workshop May 2011
What have we achieved?. Rule-making: the four key Regulations are in place:» Performance Regulation (691/2010)» Charging Regulation (1191/2010)» FAB information requirements (176/2011)» Network Management Functions (positive opinion SSC#40)
. Safety: EASA starts delivering in ATM domain» ATCO license» Common requirements» Safety oversight
. Technology: Memorandum of Cooperation between the EU and the USA (SESAR – NextGen)
. New SES entities are in place:» Performance Review Body (PRB)» FAB coordinator» Network Manager (positive opinion SSC#40)
| 7ICAO PBN TF and APV workshop May 2011
Two burning issues
. Mitigation of expected summer 2011 delays
» High delay forecast: 25 million passengers
delayed by 20 minutes or more and a total cost
of 800 million Euros;
» Key measure: „fast-track‟ empowerment of the
Network Manager;
» Mitigating measures have been identified and
presented to Transport Council.
| 8ICAO PBN TF and APV workshop May 2011
Two burning issues
. The performance scheme (the “key” of SES)
» EU-wide targets on capacity, environment, cost-
efficiency have been adopted;
» States / FABs have to adopt their local plans by
30 June 2011;
» Commission monitors process.
| 9ICAO PBN TF and APV workshop May 2011
What are the next challenges?
. The integration of the airport domain
(the gate-to-gate dimension)
» ANS at airports already in SES II performance
scheme;
» Input of airports to the Network Manager;
» Airport package in preparation (draft before
summer 2011), including airport slots.
| 10ICAO PBN TF and APV workshop May 2011
What are the next challenges?
. The deployment of technology
(the SESAR pillar)
» IP1: Worrying situation. Corrective actions and
renewed industry commitment are needed;
» SESAR: Commission to make proposals to
Council and Parliament on financing and
governance by end 2011. Draft ready before
summer break.
| 11ICAO PBN TF and APV workshop May 2011
SESAR and global harmonisation
. Memorandum of Cooperation between the
European Union and the United States of
America in civil aviation research» Annex on SESAR – NextGen interoperability. Preparation of ICAO 12th Air Navigation
Conference: » collaboration SESAR/NextGen programme
managers;
» Technical Team with participation of EASA,
SJU, Eurocontrol and Eurocae;. revised ICAO Global Air Navigation Plan.
| 12ICAO PBN TF and APV workshop May 2011
SESAR and interoperability
. Need for new aviation standards;. Regulatory and standardization roadmap
currently developed under SESAR WP C3
will form the basis for new Commission
mandates;. Roadmap will be part of the second update
of the ATM Master Plan (~March 2012).
| 13ICAO PBN TF and APV workshop May 2011
7 IRs on interoperability
. Regulation (EC) No 1032/2006 on Exchange
of Flight Data Between ATC Units (Amended
by Regulation (EC) No 30/2009). Regulation (EC) No 633/2006 on Flight
Message Transfer Protocol for Use by ATC
Units. Regulation (EC) No 1033/2006 on
Procedures for Flight Plans in the Pre-Flight
Phase. Regulation (EC) No 1265/2007 on Air-
Ground Voice Channel Spacing in SES
| 14ICAO PBN TF and APV workshop May 2011
7 IRs on interoperability – cont‘d
. Regulation (EC) No 29/2009 on Data link
services for the Single European Sky. Regulation (EC) No 262/2009 on Allocation
and Use of Mode S Interrogator Codes. Regulation (EC) No 73/2010 on the Quality
of Aeronautical Data and Aeronautical
Information
| 15ICAO PBN TF and APV workshop May 2011
IRs under development
. Common requirements for ANS. Safety oversight of ATM/ANS. ADQ 2. 8.33 kHz below FL 195. PBN» Legal framework for implementation of ICAO
A37-11» Based on ICB recommendation» Positive opinion of SSC» RAD: 02/2012, Draft IR 05/2013. Ongoing work on SERA and harmonized
transition altitude
| 16ICAO PBN TF and APV workshop May 2011
QUESTIONS ???
http://ec.europa.eu/transport/air/index_en.htm
| 17ICAO PBN TF and APV workshop May 2011
Backup slides
| 18ICAO PBN TF and APV workshop May 2011
2010 more delay, less traffic than 2008
| 19ICAO PBN TF and APV workshop May 2011
The EU-wide performance targets 2012-2014
KPAKPI for EU-
wide target
Baseline
(2009)EU-wide targets for 2014
Environment
Average
horizontal en
route flight-
efficiency
4.5% of
additional
distance
- 0.75%
vs 2009 baseline
CapacityEn route ATFM
delay
0.9
min/flight0.5 min/flight
Cost-
efficiency
Average en
route
determined
unit rate
(€ 2009 prices)
€63.8/SU
€53.92 for 2014
with intermediate
values:
€57,88 for 2012
€55,87 for 2013
| 20ICAO PBN TF and APV workshop May 2011
Functional Airspace Block initiatives
NEFAB
UK-IR
FAB EC
SW Portugal-Spain
DK-SE
Baltic
CEFAB
Blue MED
Danube
@ E
UR
OC
ON
TR
OL
• De-fragment EU airspace
• Reinforce the governance of
FABs through an IR and
guidance material
• Mediation of the FAB System
Coordinator
• EU financial support through
TEN-T
• Deadline 4 December 2012
| 21ICAO PBN TF and APV workshop May 2011
2010: 277 certified ANSPs