SINA CONTROL Engineering& Manufacturing Companysinacontrol.com/files/j4if97bydhg28z563aec1.pdf ·...
Transcript of SINA CONTROL Engineering& Manufacturing Companysinacontrol.com/files/j4if97bydhg28z563aec1.pdf ·...
AN ENGINEERING, DESIGN& MANUFACTURING COMPANY ESTABLISHED IN 2000
STARTED IN THE FIELD OF FLOW ELEMENTS AND RESTRICTION ORIFICES
THE FIRST PROJECT: MTBE IMPROVEMENT PLAN PROJECT, BIPC, IRAN
FROM 2010, WE HAVE DEVELOPED THE ACTIVITY ON “PROCESS PACKAGES”
NOW WE ARE EQUIPPED WITH 30,000 MAN-DAY /YEAR
SINA WORK SHOP IS POSITIONED IN 5000 M2 OF CLOSED SALON
ENTITIES
1) HEAD OFFICE AND WORK SHOP, SHIRAZ, IRAN: WWW.SINACONTROL.COM
2) TURKISH OFFICE, GTS COMPANY, ISTANBUL: WWW.GTSCO.COM.TR
3) CANADA OFFICE, TORONTO: WWW.SINACONTROL.CA
1
2
3
CAPABILITIES
MANAGEMENT, DESIGN, ENGINEERING& TECHNOLOGY ARRANGEMENT
MANUFACTURING OF: PROCESS PACKAGES
FLOW ELEMENTS
SUPPLY OF EQUIPMENT, PROCUREMENT SERVICE
COMMISSIONING& SITE TECHNICAL ASSISTANCE
POSITION IN APPROVED VENDOR LISTS
SINA IS PLACED IN THE APPROVED VENDOR LIST OF THE MOP AND IOOC FOR PSA(PRESSURE SWING ADSORPTION), DEHYDRATION AND GAS PURIFICATION PACKAGES:
- REGISTERED IN THE LONG LIST OF MOP (MINISTRY OF PETROLEUM) SUPPLIERS
- REGISTERED UNDER CODE NUMBER OF 6098 FOR IOOC
REFERENCES FOR FLOW ELEMENTSITEM PROJECT NAME CUSTOMER LOCATION
188 Persian Gulf Bid Boland Gas Treating Project Azarab Industries / P.G.B.G.T. Bid Boland - Iran
189 C5+Storage Tank in Parsian C2+Recovery & fractionation project Paydar Poolad Pishro CO. Assaluyeh - Iran
190 Parsian C2+ Recovery & Fractiontion Project Hampa Engineering Corporation / Palayesh Parsian Sepehr Assaluyeh & Mohr - Iran
191 Bid Boland Gas Treating Plant II Zolal Iran CO / P.G.B.G.T. Bid Boland - Iran
192 Rudshur Steam Portion of Combined cycle Power Plant Mapna Boiler Engineering & Manufacturing Co. Rudshur -Iran
193 South Pars Gas Feield develipmenet Phase 22 , 24 Petro Sina Arya CO. Assaluyeh - Iran
194 Kangan C2 Recovery and Fractionation Plant KANGAN PETRO REFINING COMPANY Kangan-Iran
195 PSA Hydrogen Purification Package Abadan Oil Refining Company Abadan-Iran
196 خالص سازي اتیلن اکساید با استفاده از سیستم غشایی Maroon Petrochemical CO Bandar Imam - Iran
197 W WWWWWWW W WWWWWWW (W 1) WWW W WWWWWWWW W WWW WWW W 1 WWW W WWW WW W WW WWWW Pouyesh Tarh Saman Energy (PTS) / IOOC Iran
198 W WWWWWWWW W WWWWWWWWW W WWWWWW WWWW WWWW Pouyesh Tarh Saman Assaluyeh - Iran
PROCESS TREATMENT PACKAGE
PSA (PRESSURE SWING ADSORPTION)
DEHYDRATION
GAS RECOVERY, PURIFICATION BY MEMBRANE TECH
VAPOUR RECOVERY UNIT (VRU)
FLARE GAS RECOVERY (FGR)
PSA KNOW-HOW Process understanding
Adsorbent selection
Vessel sizing
Vessel calculation
Valve skid manufacturing
Control system and logics
Instrumentation and Control valve
GAS RECOVERY, PURIFICATION BY MEMBRANE TECH
AGREEMENT SIGNED WITH BMT
PARTIES AGREED FOR: MARKETING& OFFERING
CUSTOMERS COMMUNICATION
SKID FABRICATION& LOCALIZATION
INSTALLATION AND START-UP
MEMBRANE FOR PROCESS & ENVIRONMENT
Emission Control and VRU:Terminals & Refineries
Marine Loading
Car Filling Station
MEMBRANE FOR PROCESS & ENVIRONMENT
Product Recovery:Ethylene Recovery unit
Propylene Recovery unit
N2 Recovery Unit
Monomer Recovery Unit
Seal Gas Application
REFERENCES FOR PROCESS PACKAGESFEED SPEC.PRODUCT SPECS.
CAPACITY OF THE PLANT
DATE OF ACTUAL COMPLETION
DATE OF COMMENCEMENT
DESCRIPTION OF THE WORK DONEPROJECT TITLE/ CLIENTSR. NO.
CR1 HYDROGEN PRODUCT IS FED TO PSA PACKAGE
HYDROGEN IN PURITY OF 99.95 MOL%
15’000 NM3/HR
SEPTEMBER 2017JANUARY 2015
BASIC & DETAIL ENGINEERING/ SUPPLY OF ADSORBENTS/ PROCUREMENT SERVICES/
EQUIPMENT MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION
SUPERVISION/ PERFORMANCE TEST
HYDROGEN PSA PACKAGE/
ABADAN OIL REFINING COMPANY
1
EOEG PLANT PURGE GAS IS FED TO ERU
ETHYLENE SEPARATION EFFICIENCY: ≥ 93%
2’800 NM3/HR
JANUARY 2017OCTOBER 2015
BASIC & DETAIL ENGINEERING/MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION SUPERVISION/
PERFORMANCE TEST (MEMBRANE PACKAGE IS SUPPLIED BY BORSIG)
ETHYLENE RECOVERY PACKAGE /
MARUN PETROCHEMICAL COMPANY
2
PROCESS REQUIRED THF IS DEHYDRATE
THF (TETRAHYDROFURAN) DEHYDRATION TO 10
PPMW WATER CONTENT
1’500 KG/HRSEPTEMBER 2017JUNE 2017BASIC & DETAIL ENGINEERING/ SUPPLY OF ADSORBENTSTHF DEHYDRATION PACKAGE /
SHAZAND PETROCHEMICAL COMPANY
3
LDPE PLANT PURGE GAS IS FED TO ERU
ETHYLENE SEPARATION EFFICIENCY: ≥ 88%
1’031 KG/HR
IN PROGRESSOCTOBER 2018
BASIC & DETAIL ENGINEERING/MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION SUPERVISION/
PERFORMANCE TEST (MEMBRANE PACKAGE IS SUPPLIED BY BORSIG)
ETHYLENE RECOVERY PACKAGE / AMIR KABIR PETROCHEMICAL
COMPANY4