SINA CONTROL Engineering& Manufacturing Companysinacontrol.com/files/j4if97bydhg28z563aec1.pdf ·...

19
INNOVATE & GO GREEN WITH SINA

Transcript of SINA CONTROL Engineering& Manufacturing Companysinacontrol.com/files/j4if97bydhg28z563aec1.pdf ·...

INNOVATE&

GO GREEN WITH SINA

AN ENGINEERING, DESIGN& MANUFACTURING COMPANY ESTABLISHED IN 2000

STARTED IN THE FIELD OF FLOW ELEMENTS AND RESTRICTION ORIFICES

THE FIRST PROJECT: MTBE IMPROVEMENT PLAN PROJECT, BIPC, IRAN

FROM 2010, WE HAVE DEVELOPED THE ACTIVITY ON “PROCESS PACKAGES”

NOW WE ARE EQUIPPED WITH 30,000 MAN-DAY /YEAR

SINA WORK SHOP IS POSITIONED IN 5000 M2 OF CLOSED SALON

ENTITIES

1) HEAD OFFICE AND WORK SHOP, SHIRAZ, IRAN: WWW.SINACONTROL.COM

2) TURKISH OFFICE, GTS COMPANY, ISTANBUL: WWW.GTSCO.COM.TR

3) CANADA OFFICE, TORONTO: WWW.SINACONTROL.CA

1

2

3

CAPABILITIES

MANAGEMENT, DESIGN, ENGINEERING& TECHNOLOGY ARRANGEMENT

MANUFACTURING OF: PROCESS PACKAGES

FLOW ELEMENTS

SUPPLY OF EQUIPMENT, PROCUREMENT SERVICE

COMMISSIONING& SITE TECHNICAL ASSISTANCE

CERTIFICATES

POSITION IN APPROVED VENDOR LISTS

SINA IS PLACED IN THE APPROVED VENDOR LIST OF THE MOP AND IOOC FOR PSA(PRESSURE SWING ADSORPTION), DEHYDRATION AND GAS PURIFICATION PACKAGES:

- REGISTERED IN THE LONG LIST OF MOP (MINISTRY OF PETROLEUM) SUPPLIERS

- REGISTERED UNDER CODE NUMBER OF 6098 FOR IOOC

FLOW ELEMENTS PRODUCTSORIFICE, FLOW NOZZLE, VENTURI TUBE & RESTRICTION ORIFICES

REFERENCES FOR FLOW ELEMENTSITEM PROJECT NAME CUSTOMER LOCATION

188 Persian Gulf Bid Boland Gas Treating Project Azarab Industries / P.G.B.G.T. Bid Boland - Iran

189 C5+Storage Tank in Parsian C2+Recovery & fractionation project Paydar Poolad Pishro CO. Assaluyeh - Iran

190 Parsian C2+ Recovery & Fractiontion Project Hampa Engineering Corporation / Palayesh Parsian Sepehr Assaluyeh & Mohr - Iran

191 Bid Boland Gas Treating Plant II Zolal Iran CO / P.G.B.G.T. Bid Boland - Iran

192 Rudshur Steam Portion of Combined cycle Power Plant Mapna Boiler Engineering & Manufacturing Co. Rudshur -Iran

193 South Pars Gas Feield develipmenet Phase 22 , 24 Petro Sina Arya CO. Assaluyeh - Iran

194 Kangan C2 Recovery and Fractionation Plant KANGAN PETRO REFINING COMPANY Kangan-Iran

195 PSA Hydrogen Purification Package Abadan Oil Refining Company Abadan-Iran

196 خالص سازي اتیلن اکساید با استفاده از سیستم غشایی Maroon Petrochemical CO Bandar Imam - Iran

197 W WWWWWWW W WWWWWWW (W 1) WWW W WWWWWWWW W WWW WWW W 1 WWW W WWW WW W WW WWWW Pouyesh Tarh Saman Energy (PTS) / IOOC Iran

198 W WWWWWWWW W WWWWWWWWW W WWWWWW WWWW WWWW Pouyesh Tarh Saman Assaluyeh - Iran

PROCESS TREATMENT PACKAGE

PSA (PRESSURE SWING ADSORPTION)

DEHYDRATION

GAS RECOVERY, PURIFICATION BY MEMBRANE TECH

VAPOUR RECOVERY UNIT (VRU)

FLARE GAS RECOVERY (FGR)

PSA KNOW-HOW Process understanding

Adsorbent selection

Vessel sizing

Vessel calculation

Valve skid manufacturing

Control system and logics

Instrumentation and Control valve

PSA OF ABADAN REFINERY

GAS RECOVERY, PURIFICATION BY MEMBRANE TECH

AGREEMENT SIGNED WITH BMT

PARTIES AGREED FOR: MARKETING& OFFERING

CUSTOMERS COMMUNICATION

SKID FABRICATION& LOCALIZATION

INSTALLATION AND START-UP

MEMBRANE FOR PROCESS & ENVIRONMENT

Emission Control and VRU:Terminals & Refineries

Marine Loading

Car Filling Station

MEMBRANE FOR PROCESS & ENVIRONMENT

Product Recovery:Ethylene Recovery unit

Propylene Recovery unit

N2 Recovery Unit

Monomer Recovery Unit

Seal Gas Application

MEMBRANE FOR PROCESS & ENVIRONMENT

Gas Separation:Hydrogen Separation

Fuel Gas Conditioning Unit

GAS RECOVERY, PURIFICATION& FGRU

Purge Gas Ethylene Recovery in MARUN PC EO/EG

PRODUCTS

REFERENCES FOR PROCESS PACKAGESFEED SPEC.PRODUCT SPECS.

CAPACITY OF THE PLANT

DATE OF ACTUAL COMPLETION

DATE OF COMMENCEMENT

DESCRIPTION OF THE WORK DONEPROJECT TITLE/ CLIENTSR. NO.

CR1 HYDROGEN PRODUCT IS FED TO PSA PACKAGE

HYDROGEN IN PURITY OF 99.95 MOL%

15’000 NM3/HR

SEPTEMBER 2017JANUARY 2015

BASIC & DETAIL ENGINEERING/ SUPPLY OF ADSORBENTS/ PROCUREMENT SERVICES/

EQUIPMENT MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION

SUPERVISION/ PERFORMANCE TEST

HYDROGEN PSA PACKAGE/

ABADAN OIL REFINING COMPANY

1

EOEG PLANT PURGE GAS IS FED TO ERU

ETHYLENE SEPARATION EFFICIENCY: ≥ 93%

2’800 NM3/HR

JANUARY 2017OCTOBER 2015

BASIC & DETAIL ENGINEERING/MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION SUPERVISION/

PERFORMANCE TEST (MEMBRANE PACKAGE IS SUPPLIED BY BORSIG)

ETHYLENE RECOVERY PACKAGE /

MARUN PETROCHEMICAL COMPANY

2

PROCESS REQUIRED THF IS DEHYDRATE

THF (TETRAHYDROFURAN) DEHYDRATION TO 10

PPMW WATER CONTENT

1’500 KG/HRSEPTEMBER 2017JUNE 2017BASIC & DETAIL ENGINEERING/ SUPPLY OF ADSORBENTSTHF DEHYDRATION PACKAGE /

SHAZAND PETROCHEMICAL COMPANY

3

LDPE PLANT PURGE GAS IS FED TO ERU

ETHYLENE SEPARATION EFFICIENCY: ≥ 88%

1’031 KG/HR

IN PROGRESSOCTOBER 2018

BASIC & DETAIL ENGINEERING/MANUFACTURING& SUPPLY/ PRE-COMMISSIONING, COMMISSIONING& CONSTRUCTION SUPERVISION/

PERFORMANCE TEST (MEMBRANE PACKAGE IS SUPPLIED BY BORSIG)

ETHYLENE RECOVERY PACKAGE / AMIR KABIR PETROCHEMICAL

COMPANY4

INNOVATE AND GO GREEN WITH SINATHANK YOU